2005-12-05 CC Packet
.
.
.
~
"!~~r.t'!iJL€
ALBERTVILLE CITY COUNCIL
AGENDA
December 5, 2005
7:00 PM
1. PLEDGE OF ALLEGIANCE
2. CALL TO ORDER - ROLL CALL - ADOPT AGENDA
3. MINUTES
a. November21, 2005 "".City"Council min.utes (pgs."S-7)
b. November 2, 2005 Joint City of Albertville and CityofOtsego minutes(pgs. 9-11)
c. November 30,2005 Albertville Economic Development Authority minutes
(pg. 13)
d. November 30,2005 Special City Council minutes (pg. 15)
4. CITIZEN FORUM -(10 Minute Limit)
5. CONSENT AGENDA
a. Approve payment of claims check numbers 022160-022211 (pgs~ 17-21)
b. Approve Resolution No. 2005-53 (A Resolution Establishing 2006 Holidays
Schedule)(pg.23)
c. Approve Resolution No. 2005-54 (A Resolution Adopting the 2006 Final Budget)
(pg.25)
d. Approve ResolutionNo. 2005-55 (A Resolution adopting the 2006 Final Levy)
(pg.27)
e. Approve S.E.H.'s r~ommendation for Application for Payment No. 11 "(Final) for
Public Works Building to Ebert Construction, Inc. in the amount of $28,105.47
t~~ "
g. Approve S.E.H's recommendation for payment to French Lake for CSAH 19
Pedestrian Ramps at a cost of $4,505 (pg. 31)
h. Approve Bolton & Menk's recommendation for Application for Payment No.2 for
Hunter's Pass Lift Station to CCS Contracting in the amount of$47,405(pg. 33)
i. Approve issuing a $100 Steffen's Meats certificate to employees
j. Approve and authorize Wetland Conservation Act Documents for Philip Morris
Property as recommended by the Technical Evaluation Panel (TEP) as on file in the
office of the City Clerk. (pgs. 35-38)
k. Approve Payment to Bonestroo in the amount of $2,260 for consulting work
pertaining to the emergency generator for City Hall with funds coming out of the
SAC fund(pg. 39)
I. Authorize City Staff to seek bids on the generator that was specified for City Hall
m. Approve the purchase of Lot 14, Block 2, Barthel Industrial Park
PID No. 101-002-002140 from Sujumibo in the amount of $ 120,000 (pgs. 41-42) .
n. Approve the Architect recommendation to pay Kue Contractor's Inc for additional
soil corrections for the STMA Arena Locker Room project in the amount of $8060
(pgs. 43-44)
o. Approve the Architect's recommendation to upgrade the STMA Locker Room
Heating system replacing the electric baseboard in the individual rooms and
installing a gas fired force air system at a cost of $9,229 (pgs.45-46)
p. Ajprove S.E.H.'s recommendation to reduce the Letter of Credit for Towne Lake
5 Addition from $460,000 to no less than $165,000 (pg. 47)
6. ACTION ON PULLED CONSENT ITEMS
7. DEPARTMENT BUSINESS
a. Finance
1). Accounts Receivable Update (pg. 49-50)
2). Project Status Update (pg. 51)
3). Approve Resolution No. 2005-56 entitled (Resolution setting Fees and
Miscellaneous Items) (pgs. 53-57)
b. Planning Department
1). Tim Guimont (pgs. 59-64)
a). Resolution No. 2005-52 (Finding of Facts for Guimont Attached Garage)
b). Conditional Use Permit - Two Accessory Buildings, Accessory Building
Floor Space Exceeding 1,150 square feet.
.
2). Little Dukes/Coborn's (pgs. 65-70)
a). Resolution No. 2005-51 (Findings of Facts for Coborn's-Litt1e Dukes
Additional Gas Pump)
b). Conditional Use Permit - Gas Sales
c. Engineering
1). Project Status Update (pg. 71)
a). 70th Street NE Access Plan (pgs. 73-74)
b). CSAH 37 Access Plan (pgs. 75-76)
c). Hotel- Waterpark Traffic Study (pgs. 77-78)
2). Resolution No. 2005-57 entitled (Resolution Establishing Municipal State
Aid Streets) (pgs. 79-80)
.
2
.
.
.
d. Legal
1). T-Square Business Park Developer's Agreement
a). T-Square Developer (pgs. 81-95)
b). T-Square Robert Heuring (pgs.97-110)
2). County Maintenance Building Agreement (to be presented at meeting)
3). Memorandum on Shoppes of Town Lakes Restaurant/Bank swap (to be
presented at meeting)
4). LaBeaux Station Extension of Recording the Plat
5). Approve Ordinance No. 2005-09 entitled (An Ordinance Setting Various
Development Fees (pgs. 111-114)
e. Administration
1). Written Report (pgs. 115-116)
2). Joint Powers Water Access Fee Discussion
3). Edina Development (Closed meeting due to litigation)
8. ADJOURNMENT
3
~
. AJ~~T!'!ilL€
.
.
ALBERTVILLE CITY COUNCIL
November 21, 2005
Albertville City Hall
7:00 PM
PRESENT: Mayor Don Peterson, Council members John Vetsch, LeRoy Berning, Ron
Klecker, and Tom Fay, City Attorney Mike Couri, City Planner Al Brixius, City Engineer Mark
Kasma, City Administrator Larry Kruse and Public Works Superintendent Tim Guimont.
Mayor Peterson called the Albertville City Council meeting to order at 7:00 p.m. followed by the
Pledge of Allegiance.
ADOPT AGENDA
MOTION BY Council member Klecker, seconded by Council member Berning to approve the
agenda removing Legal items No.2. County Maintenance Building Agreement and No.3.
Memorandum on Shoppes of Town Lakes Restaurant/Bank Swap. Motion carried unanimously.
MINUTES
MOTION BY Council member Fay, seconded by Council member Klecker to approve the
November 7,2005 regular City Council minutes as presented and on file in the office of the City
Clerk. Motion carried unanimously.
CITIZEN FORUM
Mayor Peterson asked if there was anyone present to address the Council with a concern that is
not already on the agenda.
There was no one present.
CONSENT AGENDA
MOTION BY Council member Berning, seconded by Council member Fay to approve the
consent agenda.
a. Approve payment of claims check numbers 022129 to 022157
b. Approve S.E.H.'s recommendation for Application for Payment No.6 for
Wastewater Treatment Facility to Gridor Construction, Inc. in the amount of
$522,990
c. Approve S.E.H.'s recommendation for Application for Payment No.2 for 2005 Ice
Arena Locke room Addition to KUE Construction, Inc. in the amount of$124,557
d. Approve S.E.H.'s 2004 Bike and Pedestrian Trail Project payment recommendation
to pay an STMA Invoice in the amount of $3,744 for Fence Removal and
acknowledge an offsetting bill of $1 ,537 for drainage improvements requested from
the STMA School District resulting in a net amount owed to the School of $2,207
5
e. Approve S.E.H.'s 2004 Bike and Pedestrian Trail Project payment recommendation .
to pay L&K Tree & Shrub, Inc. Invoice for final payment in the amount of $465 for
Retaining Wall Construction
f. Approve contracting with BRKW Appraisals to prepare an appraisal of Gerhard
Knechtlland for the 1-94 project at a cost of $4,800
g. Approve contracting with Michael Bettendorf of BRKW to prepare an appraisal of
three parcels of railroad property in and around City Hall at a cost not to exceed
$3,500
h. Set a Special City Council meeting for Wednesday, November 30,2005 to issue the
City Hall and Wastewater Treatment Project Bonds
i. Set Thursday, December 15,2005 at 7:00 p.m. to present the City ofOtsego with
1-94 traffic modeling and share with them how we arrived at the current plan
Motion carried unanimously.
Council member Vetsch noted he did not support item f.
DEPARTMENT BUSINESS
BUILDING DEPARTMENT: The City Council review Building Official Sutherland's
monthly report. City Administrator Kruse mentioned that the department continues to be very
busy with storm damage permits.
PUBLIC WORKS DEPARTMENT: Public Works Supervisor Tim Guimont presented the .
council with quotes for the outdoor skating rink.
MOTION BY Mayor Peterson, seconded by Council member Berning to accept the low quote
from Athletica in the amount of $4,500. Motion carried unanimously.
PLANNING DEPARTMENT: No business
ENGINEERING: City Engineer Kasma said he was available to answer question regarding his
written report. No questions were received.
LEGAL:
T-SQUARE: City Attorney Couri briefly discussed the assignment of the Robert Heuring
Development Agreement to the proposed new owners. It was determined that Staff will meet
with the proposed new owners and try and resolve any outstanding issues and bring it back to the
City Council at the first meeting in December.
CITY ADMINISTRATION:
City Administrator Kruse reviewed his written report.
KENNETH LINDSAY: The City Council review a Request for Council Action from City
Administrator Kruse regarding the request to retire from longtime employee Ken Lindsay.
.
6
.
.
.
MOTION BY Mayor Peterson, seconded by Councilmember Klecker to accept Ken Lindsay's
letter to retire in good standing with the City effective March 31, 2006. Approve the City
entering into a Memorandum of Understanding creating a bank of "additional leave" which
includes the 160 hours of vacation and any accrued sick leave, which Ken has and will earn
between now and March 31, 2006. The "additional leave" must be used prior to March 31, 2006
or would be lost. Further to grant Mr. Lindsay an allowance for individual health insurance for
the months of April, May and June, equaling $1,3827.70 dollars, which at the option of the
employee could be paid as additional compensation. Further to acknowledge the Memorandum
of Understanding memorializing the mutual agreement as on file in the office of the City Clerk.
Motion carried with Council member Vetch voting nay.
ADJOURNMENT
MOTION BY Mayor Peterson, seconded by Council member Vetsch to adjourn the meeting at
7:29 p.m. Motion carried unanimously.
Don Peterson, Mayor
Larry Kruse, City Administrator
7
.
.
.
CITY OF ALBERTVILLE
CITY OF OTSEGO
JOINT CITY COUNCIL WORKSHOP
Joint Minutes
November 2, 2005
Roll Call: Otsego City Council: Mayor Larry Fournier, Councilmembers Mark Thorsted,
Jessica Stockamp, Dan Scharber and Vem Heidner.
City Staff: City Administrator Michael Robertson, City Clerk Judy Hudson, and City Engineer
Ron Wagner.
Albertville City Council: Mayor Don Peterson, Councilmembers LeRoy Berning, Tom Fay, Ron
Klecker, and John Vetsch.
City Staff: City Administrator Larry Kruse.
Mayor Fournier called the workshop to order at 7:00 p.m. The Councils discussed the following
issues.
NEW MACIVER
Otsego stated that they had improved MacIver Avenue along their joint border and that
Albertville owed them 50% of the costs of that improvement. Otsego estimated Albertville's
share at approximately $517,000. Albertville suggested that if they improved Old MacIver they
could pay for Otsego's portion (estimated at $137,000) as part of Albertville's contribution for
their share of New MacIver Avenue. Albertville also suggested that they could contribute the
road fees provided by the Hunter's Pass addition (estimated at $138,000) and give Otsego credit
($25,000) for a portion of the traffic light Albertville installed at CSAH 37 & 1-94. This would
leave Albertville approximately $200,000 short.
Albertville suggested that they should not have to pay the entire amount because part of their
land adjacent to MacIver is a swamp and is not developable. They offered an additional
$80,000. Otsego did not agree, stating that they made developers pay their entire share for any
road even if part of it was not developable.
Both staff's agreed additional analysis would be done to pin down the actual cost associated with
the segment of street abutting the two communities.
OLD MACIVER
Albertville indicated they wished to improve Old MacIver A venue, a portion of which is
adjacent to Otsego. Otsego's share of the improvement would be an estimated $137,000.
70TH STREET (MACIVER TO CSAH 19)
Otsego would like to improve 70th street in 2006. Albertville said that it would be willing to
improve the road and pay 50%. They were somewhat concerned about the timing and said they
did not think they would have the funds in 2006. They suggested they could pay their share a
year or two later.
9
CSAH 19 & 70TH STREET .
Albertville would like to widen CSAH 19 from two to four lanes, plus right and left turn lanes,
from 67th Street north to 70th Street in 2006. As part of this improvement Wright County would
require that the four lane improvement be continued north of 70th Street for approximately 1,000
feet. Albertville would like Otsego to pay for the portion of the improvement north of 70th
Street. The total cost of the improvement would be paid for by Wright County (48%),
Albertville (31.5%), and Otsego (20.5%). Otsego's estimated cost was $603,000. Otsego said
that it was not ready to commit to this improvement in 2006 at this time and suggested a meeting
with Wright County to confirm the design and the County's willingness to pay.
1-94 INTERCHANGE
Albertville stated they have been seeking a design acceptable to MNDOT and Federal Highway
to solve long-term transportation problems on 1-94 and connecting County Roads. To date the
City has paid over $200,000 towards this effort. Albertville has decided to seek a comprehensive
project which includes a full collector distributor (CD)system which has the ability to be phased.
Albertville's goals has always been to preserve full access at CSAH 37 and create full access at
CSAH 19. It has been determined that a full CD project could exceed 20 million dollars
excluding right of way. Albertville stated they can not afford a project of this size and ifit can
not get financial assistance from the City of Otsego, Wright County and other agencies, it may
have to consider a phased approach which may for a while remove the westerly ramps on CSAH
37 and install two new ramps on CSAH 19. Albertville has not made any decisions on a project
at this time, and invited the City of Otsego to participate in coming together to build a larger
more comprehensive project that will be acceptable to most parties. .
City Administrator Kruse suggested that there is an opportunity now to leverage financial
contributions from the undeveloped land in both cities. If an agreement on a larger more
comprehensive project is not achieved and a phase approach is initiated, it may limit the
opportunity to tap those funds later .
Albertville stated that after many meetings with MNDOT and Federal Highway, at a staff level
they agree that the proposed phased Collector Distributor system would meet their transportation
and safety requirements.
Otsego registered great objections to the proposed removal of ramps on the 1-94/CSAH 37
interchange. They indicated they thought the majority of the traffic problem was caused by
traffic going to and from the Albertville Outlet Mall, and that Albertville could have addressed
some of the traffic issues when the Mall was built. Otsego expressed reluctance to financially
participate in 1-94 improvements.
Albertville stated that the Wright County Transportation Study along with traffic modeling
showed that based on current growth trends these roads systems will fail in the near future.
Albertville attributes a portion of the benefit of a larger more comprehensive 1-94 project to
property owners in Otsego. Albertville thought a portion of the traffic problems were caused by
residential growth in the surrounding area, and that traffic problems would get worse as western .
10
.
.
.
Otsego developed. Otsego noted that it had paved MacIver Avenue specifically as an alternative
to get people from Otsego to the Twin Cities without having to use CSAH 19 or go through
Albertville.
Otsego stated that one quarter of the 1-94/CSAH 37 interchange, along with one the ramps
proposed to be removed, was partially located in Otsego. They stated they would not give
municipal consent to any attempt to remove it.
Albertville invited the City ofOtsego to financially invest to preserve and improve the 1-94
access. Otsego requested Albertville put on a presentation on the 1-94 project using traffic
modeling simulations and other information. The two cities discussed a possible joint sharing of
the associated meeting cost, and after some discussion Albertville volunteered to pay for this
cost. Albertville will present a tentative date for the joint meeting.
MULTIPLE PROJECT FUNDING
Albertville requested that the two cities try and reach an agreement for all of the above projects
in concert rather than to continue to have these various issues hang out there and be a bone of
contention. Otsego rejected this idea. The two staffs will continue to work to resolve these issues.
SCHOOL SITE
The Councils discussed that the St. Michael-Albertville School District was looking for a new
high school site.
FIRE CONTRACT
Albertville estimated the cost for Otsego will be $35,200 in 2006. They asked that Otsego keep
updating the Albertville Fire Chief with new maps.
OTSEGO CREEK IMPROVEMENT
Otsego updated Albertville on its plans to clean Otsego Creek this winter. It would be cleaned at
least as far as the Section 30 wetland, which is the portion of Otsego Creek where Albertville is
responsible for partial funding. Albertville asked that an Otsego Creek Authority meeting be set
up to review the plans.
70TH STREET ACCESS
Both Councils discussed the possible location of future accesses on 70th Street.
With no other business, Mayor Fournier adjourned the meeting at 10: 15 p.m.
Larry Kruse
City Administrator
11
.
.
.
~
~~€I!'!ilL€
ALBERTVILLE ECONOMIC DEVELOPMENT AUTHORITY
November 30, 2005
Albertville City Hall
6:00 PM
PRESENT: Chairman Don Peterson, Council members John Vetsch, LeRoy Berning, Ron
Klecker, and Tom Fay, Finance Director Tina Lannes, City Administrator Larry Kruse and
Financial Consultant Paul Donna.
Chairman Peterson called the Albertville City Council meeting to order at 6:00 p.m. followed by
the Pledge of Allegiance.
The purpose of the EDA meeting was to issue $3.7 million in Lease Revenue Bonds for a new
City Hall.
$3,700,000 CITY HALL LEASE REVENUE BOND
Paul Donna of Northland Securities presented the results of the $3;700,000 bond sale stating the
issue had a 9-year call, 20-year term and was rated by Moody at an A-3. The bond is being
issued to the Albertville Economic Development Authority (EDA) and the City then has a land
and building lease with the EDA. Donna stated the average annual payment is $279,000 and the
average interest rate is a 4.34%. The City Council will be passing a concurrent resolution to
complete the transaction.
Motion by Council member Klecker, seconded by Council member Berning to approve
Resolution Number 2005-5x entitled , as on file in the office of the City Clerk. Motion
carried unanimously.
ADJOURNMENT
MOTION BY Council member Klecker, seconded by Council member Vetsch to adjourn the
meeting at 6: 1 0 p.m. Motion carried unanimously.
Don Peterson, Mayor
Larry Kruse, City Administrator
13
.
.
.
~
AJ~€I!!ilL€
ALBERTVILLE CITY COUNCIL
November 30, 2005
Albertville City Hall
6:10 PM
PRESENT: Mayor Don Peterson, Council members John Vetsch, LeRoy Berning, Ron
Klecker, and Tom Fay, Finance Director Tina Lannes, City Administrator Larry Kruse and
Financial Consultant Paul Donna.
Mayor Peterson called the Albertville City Council meeting to order at 6: 1 0 p.m. followed by the
Pledge of Allegiance.
The purpose of the special meeting was to issue $3.7 million in Lease Revenue Bonds for a new
City Hall and to issue a $4 million G.O. Sewer Bond for the new waste water treatment plant
expansIOn.
$4,000,000 WASTEWATER TREATMENT BOND ISSUE
Paul Donna of Northland Securities presented the results of the $4,000,000 bond sale stating the
General Obligation issue had a 10 year call, 20 year term and was rated by Moody's at an A2,
but the issues has insurance bringing the issue up to the highest AAA rating. The average
interest rate of3.98% and an annual debt service payment of $293,000. Donna explained that the
EDA is borrowing the funds to build the City Hall and then the building and land is leased back
to the City who make the payment on the bonds.
MOTION BY Council member Klecker, seconded by Council member Berning to adopt
Resolution number entitled. Motion carried unanimously.
$3,700,000 CITY HALL LEASE REVENUE BOND
Paul Donna of Northland Securities presented the results of the $3,700,000 bond sale stating the
issue had a 9 year call, 20 year term and was rated by Moody at an A-3. The bond is being issued
to the Albertville Economic Development Authority (EDA) and the City then has a land and
building lease with the EDA. Donna stated the average annual payment is $279,000 and the
average interest rate is a 4.34%.
Motion by Council member Berning, seconded by Council member Klecker to approve
Resolution Number entitled Motion carried unanimously.
ADJOURNMENT
MOTION BY Council member Klecker, seconded by Council member Vetsch to adjourn the
meeting at 6:20 p.m. Motion carried unanimously.
15
.
.
.
~
"J~~!'!tlL€
City of Albertville
Check Detail Register
December 5, 2005
Check Amt Invoice Comment
10100 Premier Bank
Paid Chk# 022160 12/5/2005 A.T.D.
E 101-41100-433 Dues and Subscriptions $297.00 630085-303
Total A. T.D. $297.00
Paid Chk# 022161 12/5/2005 ACTION RADIO & COMMUNICATIONS
E 101-42000-404 RepairlMaint- $1,074.65 12188
E 101-42000-404 RepairlMaint- $125.00 29698
Total ACTION RADIO & COMMUNICATIONS $1,199.65
Paid Chk# 022162 12/5/2005 AFLAC
G 101-21710 Other Deducatlons
$16.16 196333
Total AFLAC $16.16
Paid Chk# 022163 12/5/2005 ALBERTVILLE QUEEN COMMITTEE
R 101-00000-36200 Donations $150.00
Total ALBERTVILLE QUEEN COMMITTEE $150.00
Paid Chk# 022164 12/5/2005 ALPINE HOMES
G 101-22800 Landscaping Escrow $2,750.00
G 101-22800 Landscaping Escrow $2,750.00
Total ALPINE HOMES $5,500.00
Paid Chk# 022165 12/5/2005 ANOKA-HENNEPIN TECHNICAL
E 101-42000-108 Medical Training $495.00 47160
TotaIANOKA.HENNEPIN TECHNICAL $495.00
Paid Chk# 022166 12/512005 ARAMARK UNIFORM SERVICES
E 601-49450-417 Uniform Rentals $16.43 629-5722963
E 101-45100-417 Uniform Rentals $24.65 629-5722963
E 101-43100-417 Uniform Rentals $24.63 629-5722963
E 602-49400-417 Uniform Rentals $16.43 629-5722963
E 601-49450-417 Uniform Rentals $18.35 629-5776755
E 101-45100-417 Uniform Rentals $27.53 629-5776755
E 602-49400-417 Uniform Rentals $18.35 629-5776755
E 101-43100-417 Uniform Rentals $27.48 629-5776755
E 602-49400-417 Uniform Rentals $19.64 629-5835745
E 101-45100-417 Uniform Rentals $29.45 629-5835745
E 101-43100-417 Uniform Rentals $29.46 629-5835745
E 601-49450-417 Uniform Rentals $19.64 629-5835745
E 101-43100-417 Uniform Rentals $22.38 629-5845468
E 101-45100-417 Uniform Rentals $22.35 629-5845468
E 602-49400-417 Uniform Rentals $14.92 629-5845468
E 601-49450-417 Uniform Rentals $14.92 629-5845468
Total ARAMARK UNIFORM SERVICES $346.61
Paid Chk# 022167 12/5/2005 BANYON DATA SYSTEMS
E 101-41500-207 Computer Supplies
E 601-49450-300 Professional Srvs (GENERAL)
E 101-41100-300 Professional Srvs (GENERAL)
E 101-41300-570 Office Equip and Furnishings
E 101-41400-570 Office Equip and Furnishings
E 602-49400-300 Professional Srvs (GENERAL)
Total BANYON DATA SYSTEMS
$233.00 13071
$233.00 13071
$232.96 13071
$233.00 13071
$233.00 13071
$233.00 13071
$1,397.96
Annual Subscription/dues
pagers & holsters FD
repair pager
AFLAC Insurance Prem
lions donation royalty
Reimb Escrow 6178 Kaitlin Ave
Reimb Escrow 6115 Kaitlin Ave
First Responder Training J M
Uniform Serv - Sewage Dept.
Uniform Serv - Parks Dept
Uniform Serv - PW Dept.
Uniform Serv - Water Dept
Uniform Serv - Sewage Dept.
Uniform Serv - Parks Dept
Uniform Serv - Water Dept
Uniform Serv - PW Dept.
Uniform Serv - Water Dept
Uniform Serv - Parks Dept
Uniform Serv - PW Dept.
Uniform Serv . Sewage Dept.
Uniform Serv - PW Dept.
Uniform Serv - Parks Dept
Uniform Serv - Water Dept
Uniform Serv - Sewage Dept.
Annual Service Support
Annual Service Support
Annual Service Support
Annual Service Support
Annual Service Support
Annual Service Support
17
Paid Chk# 022168 12/5/2005 BOLTON & MENK,INC
E 101-41710-303 Engineering Fees $150.00 89647
E 101-41710-303 Engineering Fees $112.50 89647
E 101-41710-303 Engineering Fees $120.00 89647
E 101-41710-303 Engineering Fees $150.00 89647
E 101-41710-303 Engineering Fees $37.50 89647
E 101-41700-303 Engineering Fees $2,858.50 89647
Total BOLTON & MENK,INC $3,428.50
Paid Chk# 022169 12/5/2005 BURLINGTON NORTHERN SANTA FE
R 101-00000-34950 Other Revenues $1,500.00
Total BURLINGTON NORTHERN SANTA FE $1,500.00
Paid Chk# 022170 12/5/2005 CARBONES PIZZERIA ALBERTVILLE
E 101-41410-300 Professional Srvs (GENERAL) $19.34 38816
Total CARBONES PIZZERIA ALBERTVILLE $19.34
Paid Chk# 022171 12/5/2005 CARQUEST
E 101-45100-404 RepairlMaint-
E 601-49450-404 RepairlMaint-
E 601-49450-404 RepairlMaint-
E 601-49450-404 RepairlMaint-
E 601-49450-404 RepairlMaint-
E 101-43100-215 Shop Supplies
Total CARQUEST
Paid Chk# 022172 12/5/2005 CCS CONTRACTING
R 204-00000-37270 SAC Fees
Total CCS CONTRACTING
Paid Chk# 022173 12/5/2005 DOOHER, DELORES
G 101-22900 Park Rental Deposit Escrow
Total DOOHER,DELORES
Paid Chk# 022174 12/5/2005 ELAN FINANCIAL SERVICES
E 101-41300-399 Miscellaneous
E 101-41400-200 Office Supplies (GENERAL)
Total ELAN FINANCIAL SERVICES
Paid Chk# 022175 12/5/2005 ELERT & ASSOCIATES
E 482-49300-300 Professional Srvs (GENERAL) $3,260.00 153966
Total ELERT & ASSOCIATES $3,260.00
Paid Chk# 022176 12/5/2005 FIRE INSTRUCTOR ASSOCIATION
E 101-42000-208 Training and Instruction $971.28 50320
Total FIRE INSTRUCTOR ASSOCIATION $971.28
Paid Chk# 022177 12/5/2005 FRENCH LAKE CURB CO.
E 101-43100-400 RepairlMaint - Paved Rd $4,505.00 7155
Total FRENCH LAKE CURB CO. $4,505.00
Paid Chk# 022178 12/5/2005 FUTRELL FIRE CONSULT & DESIGN
E 482-49300-300 Professional Srvs (GENERAL) $402.50 18521
Total FUTRELL FIRE CONSULT & DESIGN $402.50
Paid Chk# 022179 12/5/2005 GOLD KEY DEVELOPMENT
E 473-49000-300 Professional Srvs (GENERAL) $4,353.00
Total GOLD KEY DEVELOPMENT $4,353.00
Paid Chk# 022180 12/5/2005 HALLMAN OIL COMPANY-FUEL DIV
E 101-43100-212 Motor Fuels $1,260.77 176843
Total HALLMAN OIL COMPANY-FUEL DIV $1,260.77
Paid Chk# 022181 12/5/2005 HAWKINS,INC
E 601-49450-210 Operating Supplies
Total HAWKINS, INC
Paid Chk# 022182 12/5/2005 ICMA
E 101-41300-433 Dues and Subscriptions
Total ICMA
Check Amt
$27.37 0281891
$23.65 0282353
$13.82 0282421
$52.48 0282503
$103.02 0282521
$33.52 0282607
$253.86
$47,405.00
$47,405.00
$100.00
$100.00
$101.68
$138.16
$239.84
$359.76 762317
$359.76
$655.12 363110
$655.12
Invoice Comment
Aesthetic Concepts SAC & WAC
Subway SAC & WAC
Subway SAC & WAC
Financial Security Bank
10487 61st place
Staff mtgs, project status upd
.
BNSF License
lunch for election judges
oil filters, clean start
011 filter, plastic truck spla
miniature bulb, tractor lamp
auto batteries
remfg altemator, core, tune u
oil dry, deep creep, white lit .
Pmt # 2 Hunters Pass Lift Stat
Reimb Park Shelter Deposit
misc. Supplies
misc. Supplies
.
Service 9/2005
pumping app driver/operator bo
Curb Invoice 03 CSAH 19 Upgrad
CH Building Project
Reimb for Excel Energy pmt ins
off road diesel winter
bio cubes
annual dues
.
18
.
Check Amt Invoice Comment
Paid Chk# 022183 12/5/2005 INSPECTRON INC.
E 101-42400-300 Professional Srvs (GENERAL)
Total INSPECTRON INC.
Paid Chk# 022184 12/5/2005 KENNEDY & GRAVEN
E 491-49000-300 Professional Srvs (GENERAL)
E 482-49300-300 Professional Srvs (GENERAL)
Total KENNEDY & GRAVEN
Paid Chk# 022185 12/5/2005 LARSON PUBLICATIONS
E 101-41100-351 Legal Notices Publishing
E 101-41100-351 Legal Notices Publishing
E 101-41100-351 Legal Notices Publishing
Total LARSON PUBLICATIONS
Paid Chk# 022186 12/512005 M M HOMES
G 101-22800 Landscaping Escrow $3,000.00
Total M M HOMES $3,000.00
Paid Chk# 022187 12/5/2005 METROPOLITAN UNDERGROUND SERV
E 604-49660-300 Professional Srvs (GENERAL) $320.70 407-05
E 604-49960-300 Professional Srvs (GENERAL) $6,129.79 408-05
Total METROPOLITAN UNDERGROUND SERV $6,450.49
Paid Chk# 022188 12/512005 Mil LIFE
E 101-41500-131 Employer Paid Health
G 101-21710 Other Deducations
E 101-41300-131 Employer Paid Health
E 101-42400-130 Employer Paid Ins
E 101-45100-130 Employer Paid Ins
E 602-49400-130 Employer Paid Ins
E 101-41400-131 Employer Paid Health
E 601-49450-130 Employer Paid Ins
E 101-43100-130 Employer Paid Ins
Total Mil LIFE
Paid Chk# 022189 12/5/2005 MILLER, BRIDGET
E 101-41400-200 Office Supplies (GENERAL)
E 101-41400-331 Travel Expenses
Total MILLER, BRIDGET
Paid Chk# 022190 12/5/2005 MINNESOTA COPY SYSTEMS
E 101-41400-413 Office Equipment Rental $22.63 142164
E 101-41400-413 Office Equipment Rental $498.06 142289
Total MINNESOTA COPY SYSTEMS $520.69
Paid Chk# 022191 12/5/2005 MONTICELLO ANIMAL CONTROL
E 101-42700-309 Animal Control Contract $75.00 571
Total MONTICELLO ANIMAL CONTROL $75.00
Paid Chk# 022192 12/5/2005 MOON MOTORS
E 101-45100-404 RepairlMaint-
Total MOON MOTORS
Paid Chk# 022193 12/5/2005 NEXTEL COMMUNICATIONS
E 101-42000-321 Telephone
E 101-41300-321 Telephone
E 101-45100-323 Nextel Radio Units
E 101-43100-323 Nextel Radio Units
E 101-41400-323 Nextel Radio Units
E 101-41400-323 Nextel Radio Units
E 101-45100-323 Nextel Radio Units
E 101-42400-323 Nextel Radio Units
E 101-42400-323 Nextel Radio Units
E 601-49450-323 Nextel Radio Units
E 602-49400-323 Nextel Radio Units
E 101-43100-323 Nextel Radio Units
Total NEXTEL COMMUNICATIONS
.
.
$4,800.00
$4,800.00
$90.00 68640
$90.00 68640
$180.00
October 2005 services
General Financial WWTF
General Financial CH
$19.80 01526960-00 Accuracy test Elections
$101.33 03543211-00 PW
$20.27 03543211-00 PW
$141.40
$2.40
$7.50
$14.10
$18.90
$5.40
$3.90
$4.80
$3.90
$26.10
$87.00
$41.60
$58.20
$99.80
$24.30 4264246
$24.30
$31.72 718183318-0
$48.17 718183318-0
$31.88 718183318-0
$31.88 718183318-0
$31.88 718183318-0
$31.88 718183318-0
$31.72 718183318-0
$31.89 718183318-0
$31.72 718183318-0
$34.91 718183318-0
$33.39 718183318-0
$31.72 718183318-0
$402.76
reimb escrow 10720 49th Court
utility truck, labor, mix, etc
replace storm sewer 57th & mai
Emp Life Ins
Emp Life Ins Emp portion
Emp Life Ins
Emp Life Ins
Emp Life Ins
Emp Life Ins
Emp Life Ins
Emp Life Ins
Emp Life Ins
general office supplies
mileage elections
Copier Maintenance Agreement
Copier Maintenance Agreement
mix, lab mix, cat
vacuum bag br
nextel phones
nextel phones
nextel phones
nextel phones
nextel phones
nextel phones
nextel phones
nextel phones
nextel phones
nextel phones
nextel phones
nextel phones
19
$57.46
$224.58
$116.68
$75.11
$64.41
$57.46
$57.46
$19.96
$57.46
$47.50
$47.46
$47.46
$38.55
$37.51
$37.51
$36.69
$32.60
$29.01
$26.12
$57.46
Total SPRINT- MO $1,168.45
Paid Chk# 022201 12/5/2005 ST. ALBERTS PARISH CENTER
E 101-41410-300 Professional Srvs (GENERAL) $50.00
Total ST. ALBERTS PARISH CENTER $50.00
Paid Chk# 022202 12/5/2005 ST. JOSEPH EQUIPMENT,INC.
E 101-43100-404 RepairlMaint-
Total ST. JOSEPH EQUIPMENT, INC.
Paid Chk# 022194 12/5/2005 PATS 66
E 101-42000-212 Motor Fuels
E 101-42000-212 Motor Fuels
E 101-42000-212 Motor Fuels
Total PATS 66
Paid Chk# 022195 12/5/2005 PINNACLE PRINTING, INC.
E 101-41100-300 Professional Srvs (GENERAL)
Total PINNACLE PRINTING, INC.
Paid Chk# 022196 12/5/2005 PITNEY BOWES
E 101-41400-322 Postage
Total PITNEY BOWES
Paid Chk# 022197 12/5/2005 RED'S PORTABLE TOILETS
E 101-45100-415 Other Equipment Rentals
Total RED'S PORTABLE TOILETS
Paid Chk# 022198 12/5/2005 S.E.H.
E 473-49000-303 Engineering Fees
E 470-49000-303 Engineering Fees
E 101-41710-303 Engineering Fees
E 101-41710-303 Engineering Fees
E 101-41710-303 Engineering Fees
E 465-49000-303 Engineering Fees
E 101-41710-303 Engineering Fees
E 101-41710-303 Engineering Fees
E 101-41710-303 Engineering Fees
E 101-41700-303 Engineering Fees
E 488-49000-303 Engineering Fees
Total S.E.H.
Paid Chk# 022199 12/5/2005 SCHARBER & SONS
E 101-45100-404 RepairlMaint-
Total SCHARBER & SONS
Paid Chk# 022200 12/5/2005 SPRINT- MO
E 101-41940-321 Telephone
E 101-41940-321 Telephone
E 101-42400-321 Telephone
E 101-41940-321 Telephone
E 101-42400-321 Telephone
E 101-42400-321 Telephone
E 101-42400-321 Telephone
E 101-41940-321 Telephone
E 101-41940-321 Telephone
E 101-42000-321 Telephone
E 101-43100-321 Telephone
E 101-41940-321 Telephone
E 101-42000-321 Telephone
E 101-43100-321 Telephone
E 101-41940-321 Telephone
E 101-41940-321 Telephone
E 101-41940-321 Telephone
E 101-41940-321 Telephone
E 101-41940-321 Telephone
E 101-41940-321 Telephone
Check Amt Invoice Comment
.
$3.72 finance charge
$59.01 7330 fuel FD
$143.85 7337 fuel FD
$206.58
$25.56 5029 color copies
$25.56
$77.52 postage
$77.52
$489.90 10342 Rental-Portable Bathrooms
$489.90
$13,597.74 138218 Prairie Run
$4,668.71 138219 04 CSAH 37 Bike Path
$222.37 138262 cedar creek south 7th
$971.61 138263 Albert Villas 6th
$224.28 138264 Towne lakes Phase III
$4,300.00 138265 CSAH 19 Ramps
$67.90 138266 Karston Kove 3rd
$154.47 138267 shoppes at Towne Lakes
$452.55 138268 Towne lakes 5th
$623.57 138269 feild revies, drainage review.
$3,701.10 13851 Ice Arena locker ROOM
$28,984.30 .
$42.55 01 347794 o-rings, hyd quick
$42.55
497-3106
taxes and surcharges
497-5007
497-3384
497-5106
497-7485
497-7416
Idst
497-3758
497-4836
497-3145
497-0179
497-7474
497-0774
497-0452
497-3210
497-1888
497-4214
497-2215
497-4182
election place rent
$46.92 VI12829
$46.92
.
parts, element
20
.
.
.
Paid Chk# 022203 12/5/2005 STAR TRIBUNE
E 101-41400-200 Office Supplies (GENERAL)
Total STAR TRIBUNE
Paid Chk# 022204 12/5/2005 STREICHER'S
E 101-42000-404 Repair/Maint-
Total STREICHER'S
Paid Chk# 022205 12/5/2005 TASC
E 101-41400-131 Employer Paid Health
Total TASC
Paid Chk# 022206 12/5/2005 TINKLENBERG GROUP
E 468-49000-300 Professional Srvs (GENERAL) $3,300.00 1128
Total T1NKLENBERG GROUP $3,300.00
Paid Chk# 022207 12/5/2005 TOSHIBA AMERICA INFO SYS INC
E 101-41400-413 Office Equipment Rental $496.16 43425553
Total TOSHIBA AMERICA INFO SYS INC $496.16
Paid Chk# 022208 12/5/2005 UNIFORMS UNLIMITED INC
E 101-42000-417 Uniform Rentals
Total UNIFORMS UNLIMITED INC
Paid Chk# 022209 12/5/2005 WATER LABORATORIES INC
E 601-49450-218 Testing Expenses $587.10
Total WATER LABORATORIES INC $587.10
Paid Chk# 022210 12/5/2005 WRIGHT-HENNEPIN ELECTRIC CO-OP
E 101-45100-381 Electric Utilities $25.36
E 101-43160-381 Electric Utilities $51.28
E 101-45100-381 Electric Utilities $133.92
E 601-49450-381 Electric Utilities $6.00
Total WRIGHT-HENNEPIN ELECTRIC CO-OP $216.56
Paid Chk# 022211 12/5/2005 XCEL ENERGY
E 101-43160-381 Electric Utilities
E 101-43100-381 Electric Utilities
E 601-49450-381 Electric Utilities
E 601-49450-381 Electric Utilities
E 101-41940-381 Electric Utilities
E 601-49450-381 Electric Utilities
E 601-49450-381 Electric Utilities
E 101-41940-381 Electric Utilities
E 101-41940-381 Electric Utilities
E 101-42400-381 Electric Utilities
E 101-43160-381 Electric Utilities
E 101-45100-381 Electric Utilities
E 101-45100-381 Electric Utilities
E 101-42000-381 Electric Utilities
Total XCEL ENERGY
10100 Premier Bank
Fund Summary
101 GENERAL FUND
204 SEWER ACCESS
4652003 CSAH 19 WIDENING
468 CSAH 19 RAMPS/I 94 Project
470 CSAH 37
473 PRAIRIE RUN
482 CITY HALL 2004-5
488 ICE ARENA LOCKER ROOMS
491 WNTF Phase 2
601 SEWER FUND
602 WATER FUND
604 STORM WATER
Check Amt Invoice Comment
$60.32
$60.32
paper
$73.11 1303032
$73.11
repair parts for rescue truck
$660.00
$660.00
Flex System annual fee
1-94 funding
Copier Lease Agreement
$29.50 295694
$29.50
dress shirt for new FF
biochemical oxygen demands, ph
laketowne view
Street Lighting - 58-59-60 St.
parks
towne lakes lift station
$0.05 51416598071 5700 Labeaux Ave Signal
$314.08 51460281661 6461 Maciver
$211.62 51468978491 11200 60th
$62.49 51468978491 11942 52nd St Lift Station
$45.88 51468978491 6002 Main Ave
$2,479.94 51468978491 6451 Maciver
$24.76 51468978491 4940 Kaiser Ave Swr
$219.49 51468978491 5975 Main
$83.28 51468978491 Taxes and Surcharges
$35.65 51468978491 5964 Main Ave
$24.84 51468978491 11060 61st St Signal
$7.43 51468978491 11474 58th St
($14.86) 51468978491 5801 Main
$178.63 51468978491 11350 57th
$3,673.28
$134,085.60
10100 Premier Bank
$37,861.64
$47,405.00
$4,300.00
$3,300.00
$4,668.71
$17,950.74
$3,752.50
$3,701.10
$90.00
$4,265.79
$339.63
$6,450.49
$134,085.60
21
.
.
.
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO. 2005-53
A RESOLUTION ESTABLISHING
2006 CITY HOLIDAYS OBSERVED
WHEREAS, the City Council is desirous of establishing the 2006 City Holidays to be observed
for the City of Albertville effective January 1,2006; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of Albertville, Wright
County, Minnesota, hereby establishes the following Holidays:
Monday, January 2
Monday, January 16
Monday, February 20
Monday, May 29
Tuesday, July 4
Monday, September 4
Monday, October 9
Friday, November 10
Thursday, November 23
Friday, November 24
Friday, December 22
Monday, December 25
New Year's Day
Martin Luther King Jr. Day
President's Day
Memorial Day
Independence Day
Labor Day
Columbus Day
Veteran's Day
Harvest - Thanksgiving Day
Floating Holiday
City Hall closed at noon (comp-time or vacation used)
Winter - Christmas Holiday
Adopted by the City Council of the City of Albertville this 5th day of December 2005.
Don Peterson, Mayor
Bridget Miller, City Clerk
23
.
.
.
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO. 2005-54
A RESOLUTION ADOPTING THE 2006 FINAL BUDGET
WHEREAS, the City Council of the City of Albertville has adopted a proposed budget; and
WHEREAS, the Albertville City Council has adopted a final tax levy to be placed upon the
taxable property in the City of Albertville; and
WHEREAS, the Albertville City Council desires to reserve within the General Fund those
monies designated as capital outlays within various budget classifications, such that those
monies can be disbursed only for those capital outlays so specified within the budget.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ALBERTVILLE, MINNESOTA:
1. The attached budget is hereby adopted as the final budget for the City of Albertville for the
period January 1, 2006, through December 31, 2006.
2. All monies designated within the budget, as capital outlays shall be reserved within the
Capital Reserves Fund, such that those monies can be disbursed only for those capital
outlays so specified within the budget.
3. The Albertville City Council has hereby complied with Minnesota Statutes.
4. The Finance Director is hereby authorized to transmit certification of compliance with
Minnesota Statutes to the Commissioner of Revenue as required.
Adopted by the Albertville City Council this 5th day of December, 2005.
Don Peterson, Mayor
Bridget Miller, City Clerk
25
.
.
.
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO. 2005-55
A RESOLUTION ADOPTING THE
FINAL 2005 TAX LEVY COLLECTIBLE IN 2006
WHEREAS, the City Council of the City of Albertville has adopted a proposed budget; and
WHEREAS, the Albertville City Council has determined that a tax levy upon the taxable
property in the City of Albertville is necessary to provide sufficient funds for the operation of the
City from January 1,2006, through December 31,2006; and
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ALBERTVILLE, MINNESOTA, that
5. The following sums of money be levied for the current year, collectible in 2006, upon the
taxable property in the City of Albertville, for the following purposes:
GENERAL FUND
DEBT SERVICE FUND
$1,735,899
$359,651
6. The Finance Director is hereby instructed to transmit a certified copy of such levy to the
County Auditor of Wright County, Minnesota, to be placed upon the tax rolls the property
within the City of Albertville.
Adopted by the Albertville City Council this 5th day of December 2005.
Don Peterson, Mayor
Bridget Miller City Clerk
27
.
.
~
SEH MEMORANDUM
TO:
Larry Kruse
Albertville City Administrator
FROM:
Sharon Lund, CCCA
DATE:
November 15,2005
RE:
Public Works Facility
Albertville, Minnesota
SEH No. A-ALBEV 0302.01 14
When payment is made, sign all copies and distribute as follows:
Ebert Construction
SEH
City of Albertville
If you have any questions, please feel free to call us.
Enclosures
c: Bob Moberg, SEH
29
Jt..
. SEH MEMORANDUM
TO:
Larry Kruse
Albertville City Administrator
FROM:
Robert Moberg, PE
Project Manager
DATE:
November 29, 2005
RE:
2003 CSAH 19 Upgrade
French Lake Curb Invoice
Albertville, Minnesota
SEH No. A-ALBEV0216.00
.
Please find enclosed an invoice from French Lake Curb Company. The invoice is in the amount
of $4505.00 and is for installation of pedestrian curb ramps at seven (7) locations along CSAH
19. The locations are:
1. Northwest comer at the entrance to the Outlet Mall;
2. Northeast comer at the entrance to the Outlet Mall;
3. South side of the 1-94 freeway on-ramp;
4. North side of the 1-94 freeway off-ramp;
5. Northwest comer at the 57th Street intersection;
6. Southwest comer at the 57th Street intersection (crossing 57th Street); and
7. Southwest comer at the 57th Street intersection (crossing CSAH 19).
Installation of the pedestrian curb ramps was done at the request of City staff and was supported
by staff from Wright County. If the work had been performed by Buffalo Bituminous Inc. (the
contractor for the CSAH 19 Upgrade project) as a change order to their original contract and at
the unit prices identified in their contract, the cost of the work would have been $4744.70.
SEH recommends payment to French Lake Curb Company for the invoice amount of $4505.00,
as the work was performed at the City's request and was completed in accordance with City
standards.
If you have any questions, please call me at 651.490.2147.
nm
Enclosure
c: Tina Lannes, City Finance Director
Virgil Hawkins, Wright County
.
31
.
.
.
E30L TOI'J & "-/IE:I'J 1<., II'JC.
Consulting Engineers & Surveyors
2638 Shadow Lane, Suite 200 . Chaska, MN 55318
Phone (952) 448-8838 . FAX (952) 448-8805
November 16,2005
Honorable Mayor and City Council Members
City of Albertville, MN
5975 Main Ave. NE
Albertville, MN 55301-9776
Re: Payment Request No.2
Hunter's Pass Lift Station
Albertville,MN
Dear Mayor and City Council Members:
Enclosed are three copies ofthe application and certificate for Payment Request No.2 from CCS
Contracting for work completed on the above referenced project.
We have reviewed this estimate and recommend payment to CCS Contracting in the amount of
$47,405.00.
Please sign and forward a copy to CCS Contracting, Paul Saffert of Bolton & Menk and retain
one copy for your use.
Respectfully submitted,
BOLTON & MENK, INC.
Paul Saffert, P .E.
Project Engineer
Ene.
ee:
Mark D. Kasma, P.E., Bolton & Menk, Inc.
Adam Nafstad, P.E., Bolton & Menk, Inc.
33
.If\
.
.
ElOL~ &. ~e:I'JI<,
ConIuIting Engineers a SUrveyors
1960 PremIer Drtve · Mcnkato. MN S6001..s900
Phone (fJ11) 625-4111 · FAX (fJJ7) 625-4117
II'JC.
~Oa
~JJ~
November 22. 200S
Mr. Lany IC.nIIe. City A4m~
City of AlbcutviJlo
ms MeinAVClJlOe NB
AlbertviUo. MN S5301-9716
R!: Wedands~AcI~
Philip Moni. Property
Albertville. MN
BMI PmjectNo. TtS.2 I 72.6
Deer L8rry:
The...1oper lIIldIor his.... lIMe...... tilt ~.......... tile ........ w.....
CoDIrnrIIion Act. As IUdI. we'" ,......... ~......... foUows:
1. A NodccofWcdad ConIentaticutAct.Decw.. WedInd Type aDd 80wcIery ad &emption.
2. Applbtioa fw your IipMure .. the LOU.
P..... iIlcIudethis item ill yoUr.....1bd___S Cuacillllellin.. .1t~.Is~.
and.,prowd by the coun~ .ptoae... dIM'" .~ ill_ Nc6>> (l1emNo. 1) ad..
AppJiCItion (Item No.2). If ~... 1M ..... to Adun. NIIflIad for d1ttrihUtion.
Hopefully tbia.1etter and thesedoculnenu _ cIIIr.. ~ 1f)'OU haw myqtlllll&ioDs. or if
)'OIl need fudhcr essi-. ..... ... free 10 call ..1t(507) 6254111.
~Submhtcd.
WiUiam R. , P.E.
Sf. W_ Resources Engineer
WRt:cmJ
co: ~ Fither. Larkin Ho1'tilM DaIy.t ~ Ltd, (wlOencIoIurW)
Mark.~ Dohon....~..IDc.. (WID........)
Bnd WOZIUl)'. BWSIt, (wloenclOuw)
eooeeDAlIen, Wri&btColmty SweD, (wlo....)
F:W.81\TISl1726'1Cme1\W~ ....1It...
MANKATO. MN · FAlRMON1'. MN · SI..&PV EVE. MN · BURNSVlLE. MN · WlIJMR. M".t · CHASKA, MN · .AMES,..IA .
www.~C(lI'l"I
M/!q.Jcf~~
Minnesota Wetland Conservation Act
Name and Address of Local Government Unit: City of Albertville 5975 Main Ave. NE.
Albertville. MN 55301-9776
Name of Applicant: Philip Morris
Property
Project Name: Philip Morris
Application Number: 1-2005
Type of Application (check one):
[gI Exemption Decision
D No Loss Decision
D Replacement Plan Decision
D Banking Plan Decision
[gI Wetland Type/Boundary Decision
Date of Decision:
Check One: [gI Approved
D Approved with conditions (see note on page 2 regarding use of wetland banking credits)
DDenied
.
Summary ofProjectJDecision:
This approval is for a Wetland Boundary and Type Determination along with a De Minimis Wetland
Exemption based on Minnesota WCA rule 8420.0122, Subpart 5.C. Under this provision, a replacement
plan for wetlands is not required for activities in wetland areas created solely as a result of "actions by
public or private entities that were taken for a purpose other than creating the wetland;" these areas may
be drained, excavated, or filled if the landowner can show that the wetland was created solely by actions,
the purpose of which was not to create the wetland.
At a meeting held on Wednesday, November 16,2005, the Technical Evaluation Panel agreed with the
property owner's consultant determination that Wetland A was created by the construction of a private
road and the improper placement of a culvert. At this same meeting, there was extensive discussion
relative to the appropriate location of the northwest line of Wetland B. It was mutually determined that
this boundary line should be adjusted to near elevation 949.75 as represented by the contour shown on
the attached map. The TEP agreed that the remainder of Wetland B's boundary appeared accurate.
This satisfies the wetland boundary determination lines for three years following the date of approval or
the December 5, 2005 City Council Meeting. However, it should be noted that the U. S. Corps of
Engineers (COE) has a separate, Federal role in wetland issues in Minnesota. For COE approval, we
recommend you forward any delineation and wetland encroachment documentation to Tim Fell, the local
COE representative to ensure COE concurrence. Please be advised that any wetland activity that is
approved by the City of Albertville is in accordance with the Minnesota Wetlands Conservation Act. The
COE provides permitting in accordance with Federal Laws. These are separate permitting authorities. .
36
.
.
.
This determination is contingent on the submittal of a fully executed (signed) exemption request for
Wetland A.
List of Addressees:
Landowner:
Philip Morris
603 Lake Street
Excelsior, MN 55331
Linda H. Fisher
Larkin Hoffinan Daly & Lindgren, Ltd.
1500 Wells Fargo Plaza, 7900 Xerxes Avenue South
Minneapolis, MN 55431
Members of Technical Evaluation Panel:
Larry Kruse, City Admin-LGU
City of Albertville
5975 Main Avenue NE
Albertville, MN 55301-9776
William R. Douglass
Bolton & Menk, Inc.
1960 Premier Drive
Mankato, MN 56001-5900
Colleen Allen, Board Conservationist
Wright County Soil and Water Conservation District
306C Brighton Avenue
Buffalo,MN 55313
Department of the Army
Corps of Engineers
St. Paul District
Attention: Tim Fell
190 Fifth Street East
St. Paul, MN 55101-1638
Brad Womey, Board Conservationist
BWSR
520 Lafayette Road North
St. Paul, MN 55155
Mark Kasma
Bolton & Menk, Inc.
12224 Nicollet Avenue
Burnsville, MN 55337-1649
Adam Nafstad
Bolton & Menk, Inc.
12224 Nicollet Avenue
Burnsville, MN 55337-1649
37
Department of Natural Resources Regional Office (select appropriate office):
Central Region:
Reg. Env. Assess. EcoJ.
Div. Ecol. Services
1200 Warner Road
St. Paul, MN 55106
.
DNR TEP Representative (if different than above)
Jason. Neuman
Minnesota Department of Natural Resources
Montrose Area Fisheries
7372 State Highway 25 SW
Montrose,MN 55363
Corp of Engineers Project Manager @
Department of the Army, Corps of Engineers, St. Paul District
ATTN: CO-R, 190 Fifth Street East
St. Paul, MN 55101-1638
You are hereby notified that the decision of the Local Government Unit on the
above-referenced application was made on the date stated above. A copy of
the Local Government Unit's Findings and Conclusions is attached. .
Pursuant to Minn. R. 8420.0250 any appeal of the decision must be
commenced by mailing a petition for appeal to the Minnesota Board of
Water and Soil Resources within thirty (30) calendar days of the date of the
mailing of this Notice.
NOTE: Approval of Wetland Replacement Plan Applications involving the use of wetland
banking credits is conditional upon withdrawal of the appropriate credits from the state wetland
bank. No wetland impacts may commence until the applicant receives a copy of the fully signed
and executed "Application for Withdrawal of Wetland Credits," signed by the BWSR wetland
bank administrator certifying that the wetland bank credits have been debited.
THIS DECISION ONLY APPLIES TO the Minnesota Wetland Conservation Act. Additional approvals or
permits from local, state, and federal agencies may be required. Check with all appropriate authorities
before commencing work in or near wetlands.
LOCAL GOVERNMENT UNIT
Signature
Date
.
Name and Title
38
.
.
.
J1t =:00
-=- AnderIik&
1\11 AssodaIes
Snglnnrs foArchlCecU
November 28. 2005
Mr. LaITy Kruse. City AdministTaIor
City of Albertville
S~7S Main Avenue NE
P.O. Box. 9
AlbertviUc, MN 55301
Rt:: Albertvi1Je City Han
OUr File No. 1028-0$-100
Special E1ectricaI S)'Itmns- Emctpncy Gcner:atar
Dc... Latty:
During the bidding phase, BoncsIroo performed Additiooal SeJvices 10 the CODItICt to faciUlatc the City'$
request to add by addP.tV1nm an E.tnerpncy GenemIort.o tho projlCt. This 1eltel' is a fOUow-up to that request
along with SOInI backup iDfunnation n=prding the time explmded and the associated costs.
Following is a list of sen/ices by Mike Filzpabick and Jeff McDowell performed in prepantioD of this
addendum it=.
1, Combel in-houte meetmgslo discus the following.
a. Basement oplion - Pro's ami Coo's
b. Outdoor pennll.llle'Dt or portable geoe,rator
c. Access to tpmelalCr
d. Obtainia& cost eslima1es for various options
e. Retnreh on pnaator pad types
2. frepue die p. by maJciDg modificIlions to electrical &elVk:1l!
entrance to include provisions for an emerscnqr pcrat;or.
3. Prepare new speciflCfttions for an emerpncy pnemlor.
The total fee for the acldettdum change..
Hi m. :x. $75.00. = 51,200,01)
4 hr. x $75.00 = SJOO,OO
8 hr. X 59'.00 · $760.00
$2.260.00
Please sip below aulborizing this fee adjustment to b c:onb:aCt tor these: services, Thank you aga2D for the
opportunity to work with you end the council on Ibis projecL
Sincerely,
BONESTllOO. ROS~ ANOERUK &. ASSOClATES.INC.
~'iYtr
Don PetenGn. MayoI'
Date
Cc: OFR
File
Latty KIusc. City Adtninis.tnlIor
0_
39
~
· AJ~~!'!tlL€
TO:
FROM:
DATE:
RE:
City Council
Larry R. Kruse
November 30, 2005
Purchase of Sujumibo (Michael Potter) Industrial Property
BACKGROUND
The City Council previously approved purchasing the Sujumibo industrial site subject to our City
Engineer evaluating the soils to insure there is not a need for significant correction. Soil tests
have been performed and according to Assistant City Engineer Adam Nafstad the soil test
indicated that the site is typical to Albertville and in his opinion this site when taken in totality
with adjoining City owned land should balance and require little if no imported soils. To refresh
everyone's memory, the following is my earlier information presented to council.
.
The City is considering installing improvements to 52nd Street in Albertville's Industrial Park. In
May of2005, BMI estimated the cost of municipal improvements at $778,840.99, providing
benefit for 11.35 acres. Sujumibo owns 2.38 acres of this land and has offered to sell it for the
County Assessor market value, which is $120,000 or $1.16 s.f.. Soil tests and a development
cost analysis has not been done on the property to determine any soil corrections necessary.
The owners contend the cost to install the municipal improvements exceed the benefit to the
property and thus are offering it to the City. Spreading the cost of the improvement to the build
able area results in the following
Average Municipal Improvement Cost for the 11.35 acres is $1.57 s.f
Average Sujumibo Land and Municipal Improvement Cost (2.38 acres) is $2.73 s.f.
Average Municipal Improvement Cost (11.35 acres) including Sujumibo land is $1.82.
The City has the ability to create a Tax Increment District to reimburse the City for the Cost of
land and improvements approximately equal to the increase in taxes generated by new
development, thus limiting the City financial risk.
RECOMMENDATION
Move to Authorize the City to purchase 2.38 acres of industrial land from the Sujumibo for
$120,000.
.
41
f{\
ElC::>L""'~ &. IV1 E::N I< ,
Consulting Engineers. SUrveyors
1960Premlef Drive · Mankato. MN 56001..6QOO
Phone (SJ7) 62$.4171 · FAX (!JJ7) 625-4177
II'-JC:.
J4t(
.~.
c
.
November 28, 2005
Mr. Larry Kruse, City Administrator
City of Albertville
5975 Main Avenue NE
P.O.Box9
Albertville, MN 55301
RE: S~wnilioLLCProperty
5216 52nd Street N.E.
Lot 14, Block 2 - Barthel Industrial Park
City of Albertville, MN
Dear Mr. Kruse:
As requested, we have reviewed Braun Intertec's Preliminary Geotechnical Evaluation, dated
November 16, 2005, for the above referenced 2.76 acre parcel located at the northwest quadrant
of the 52nd Street N.E. and Marlowe Avenue N.E. intersection. Braun's evaluation consists of
the analysis of field and laboratory tests performed on selected soils collected while conducting
eight (8) penetration test borings to nominal depths of 15 to 20 feet below the existing grade, soil
boring logs, and recommendations for the construction of building pads, roadways, etc.
.
Braun's evaluation indicates that the site has approximately Y2' to 3 Y2' of clayey topsoil at the
surface and different glacially deposited clays below. The results of the soil borings and tests
indicated that approximately Y2' to 7' oftopsoil and soft compressible soils will need to be
excavated and replaced and/or dried to provide suitable pad material capable of bearing typical
industrial building and roadway loads. Braun summarizes their analysis of the site by stating,
''this is a typical clay site and construction techniques appropriate for a clay site and prevailing
season/weather should be exercised.
Based on Braun's geotechnical evaluation of the site and if incorporated with the mass grading
plan and development of the adjacent lots, it is believed that the site can be feasibly developed as
a pad-ready lot capable of accommodating a light-industrial type business.
Please let me know if you have any questions regarding the evaluation of the site.
Sincerely,
BOLTON & MENK, INC.
Adam Nafstad, P. E.
Albertville Assistant City Engineer
Cc:
Mark Kasma, P.E. - City Engineer
.
42
~
. SEH
No-maber 1& 200$
U: AlbrIftvdl.. MiIlllllGta
200$ fcle Area Loobr bolft Additioe
S!HMo.A-ALJBVOSl$.oe 14.00
.
Lin)o' Krwlc
Cit,y~
citf af AlbIrtvlUe
5f7S Main Avenu.t NE
Albenvl1lt, MN "'01"""
D-'Mr. Krue;
I'" .... 0.. .~ 1hIt OCCUII- .......1he ad4ftlOftlJ lOlls oorrection. Loo FIlly. wbois
1M _1i1e .,.,..fot~~...... "fDJowiq~ QD to.. AlWkoriJiuJ
101..a4 bca1 te>,", Iowa '10 fGurfoat dIpdl bcda Q._~..-iIb lDde....t r"*'&
ncbMloPI udAclla who fa p~ 'lbeCk) "rl.~".' BoUl...._ addftOllll
ICIilI at tilt Iaat oftlle. ....ID belllDeMlcI.- this WIlli... at aboGt _ yudt.....llodl eqat
or paa mU.1IUl iJt1CIOft at....s noUaJinl to SI ~ x ~ . S914D.. The fhlll IIwn_ GUl' to 1t15.
4IiV lJ.'-'i;,p..J"'~ WD "W,. ~w... DUll", ll~ra.td.1Ii 0... ~.l1 "..... ..,tlwi.q d'lJ~yatMa
1:hi. mfollMtion CImO to _after_ -. bal it all appnn to be 1qi1InPto. Leo abo ~ t1lat file
Cit)' EagiJJeetWII piqw iIIfonD,. .. doc.....t Jail..... UYit.......... be I'OmIIWOCL
w. bwt a ,....d MiIkm fortM ~ IQ'Il!IlDIa clUed b ttplaclqt1Le.IecIri~""""",,"
IlICWded in the 1U for dle1acw toOII'll. nil .1 what tit., line at "....na:.... waaId 'fimcdDa wida
.. ...... 'lbe pmpouJ wiDltm uelhc air~~ Wwil1 ntplacc * .lIIctrichlcq UIIa
with fora., dtreated hID COITLdor lIIif1l1to 1l1e I.ocbr roama. TlU.IhouW be lL JDUCh more cmcicm
~__ do. bQIaIr job ot"';..Y~ 11III cIchu1aidiflinl.
1 will 1M u..propauII for )'OW IMiew also.
.~
~~-
Projlat ~
kid
Eacloli\lRl
lJ::.A.\A.1.8IMASUOIM~"'1WlGl OfdSU'lGVlhf.DI)C
.
43
... ~...
......
_ ...." ~,
-.... -
...... .~w
. ....-...,
........11..-
PLl.JMB1NG .. BK.\TING
or l.A.YNaVlL1& lNC.
111.1. CON'l'IAC1"CU
lID CI!IIDAL AVI. I.
'A ..... .
W'A'IZIMI.....
t.J>>M" 'AX 7MQ$iiM
ND\'DB&1.200S
M:~qAUNAwac:....ADDrI~.ail'tAtIlVAe
IYJ'I'IN
DI_(III8W.~_"'JDCbY AlINA 11m
IKADDIYITIIM'WAlPIOtlI&) dlNDlVlDUALltBCmCBlAmlJOI.
.1'II1.OC1D...... A:NDACMlJIIID~..,AIlI'rDI"ICIl"
IMUWAYI.A.'MD1A3BY. .
1M ovaNDIDID'lWI...... ...~A)/ICJIII1ICMA'L
HlA11NO AND VllftlLADfO 1YI1BM1IIATWOUlD an..,4aLlTA1'I
YOUa...,BUILDDIOAMD.1& ......~liII..AI'a.AI ..'
OPIIRATDtAND COYIDI.T. .... IQ'IlWWJl.LALIO D0411r111D
....1'IIII.WN'lII.A!JNG .olD.......... ua.ACa ..ft....
'MI.U INCUJDlrwo _AlAm".~.AIIl1UIJfM.3I WI'III
Dmlia ~ft" a.......I.....1m1lftO IACII....... _
a1'IA COlT OfIlQUJlll8lr AD*1IIIAI.Im.....,. WDATI
ow ClaJCa110NWUUUJ.,wADDthQlf& .......
~TAD 'J'ID ~0Qh....ADJl( Ale LarUl Dl)W
WBfalDDtIeIII:JN WKfWOlU uamoownaWllIIIDlOJ:NOW'
POaP1.AHNlNG......AllDJaAYt'Dbrca-.-aTl'AtI.
11MNIl YOl1f01. YOUI.....A'ND~~:rDt ft....
JIOIlWAI.D lOwauDla W1D11OUCIf YGUJ.JIJOa'T.
'VOII~.laAl1NO
~~~~
.
.
.
44
.
~~~. ...
'-RuB ~Lo~NOV 152005
~ 1~e.._~ - .
P..c. ....' '. ..' . '.
'. .'. ~............
.............~l__ ~;~- .~l~
.
Newellbel' l" 200'
Mr.l\IJI (1-'
SIB 1u.
"5II>IQl~ JOO
P.G.....
lbbatrd.')fN 56401..0405 "
Q:200t IIIAN11&A4'-"
"., ....
ne...... rw the 1Idd1tklllll1lOJl coRocdar. .. . trlSJ.OO
1'* OAP I 'JS.OO
SUIlIaIIl S 10.-.00
J.ont Ind t lOUD
TaIIIl 11'.,1"
TkaAiHllNlAl caa,..1hI \JQNdId Hal-~.S)IlCllIIII..,.bed per,
anacbed leer S 1,300..00
1"' oar . s .', _.GO
S~ '9.130.GO
2 .01M IIaa4 S 99.00
Total S........
.
45
~
A!1?.~!!'!UL€
.
TO:
FROM:
DATE:
RE:
City Council
Larry R. Kruse
November 30, 2005
STMA Locker Room Project - Heating System
BACKGROUND
KUE Contractors Inc. in conjunction with their heating contractor (Voss) are recommending we
change the heating system in the arena locker rooms from electric to a gas fired forced air system
with dehumidification, which will be more efficient and a more comfortable heat. The Architect
agrees and also recommends the change, however, noted this is a financial decision for the City
and that the electric heating will work.
See contractor submittals for additional information.
With the soil correction work we have expended our contingency funds. I have forwarded this
information onto Arena Manager Grant Fitch and STMA Arena Board Chairman Bob Helgeson .
to see if they can pay for this item either through the Arena Board or through the $500,000
approved by the voters recently. This item is an arena improvement that is post referendum, so I
think it would qualify. Because of timing issues, I recommend that the City of Albertville
approve the change order but keep in mind by doing so that the City of Albertville may not get
reimbursed if the school or arena board does not come through.
RECOMMENDATION
Move to approve a change order for installation of a gas fired forced air heating system instead
of the electric at an additional cost of $9,229.00.
.
46
Jt..
. SEH Memorandum
TO:
Larry Kruse
Albertville City Administrator
FROM:
Robert Moberg, PE
Project Manager
DATE:
November 29,2005
RE:
Albertville, Minnesota
Towne Lakes 5th Addition
Letter of Credit Reduction
SEH No. A-ALBEV0417.00
.
I have reviewed the developer's request to reduce the Letter of Credit and I have also reviewed
the work completed to date. Street and utility work has been completed. According to the
developer, the majority of the park improvements have also been installed. The final lift of
blacktop, trail paving, street signs and landscaping will not be completed until next year. I
recommend that the Letter of Credit be reduced from $460,000 to no less than $165,000. The
reduced balance will be adequate to cover the cost of the remaining public improvements, offsite
improvements, and landscaping.
Please call me at 651.490.2147 if you have questions.
nm
x:Iae\&bev\041700\wordllocI1290S.doc
c: Tina Lannes, City Finance Director
Mike Couri, City Attorney
Dave Hempel, CPDC
.
47
.
.
.
TO:
FROM:
DATE:
City Council
Tina L. Lannes
December 1, 2005
Accounts Receivable Update
RE:
Total accounts receivable outstanding through November 29, 2005 is $590,004.36.
The percentage of the total due based on the aging report is as follows:
0-30 days outstanding
30-60 days outstanding
60-90 days outstanding
Over 90 days outstanding
$55,502.63
$23,437.45
$157,076.82
$298,947.22
9.41%
3.97%
26.62%
50.67%
The majority of the 60-90 days amount due is from the Towne Lakes 3rd Developers Agreement
that requires a payment of $144,474 for 70th Street to be made to the city when the 161st lot was
platted. This originally was expected to be platted in Towne Lakes 5th Addition, but it is being
platted with the 6th Addition and we will receive payment in full when that occurs which is
expected to be by year end if plans go accordingly.
Edina Development bills are $315,038.51 or 53% of the total outstanding receivables.
49
Vendor Amount Due 0-30 Davs 30-60 days 60-90 days 90 days & Over
152 CLUB $150.00 $150.00
ALBERTVILLE HOLDINGS $1895.18 $733.00 $1162.18
BROWN, STEVE & CHRISTY $50.00 $50.00
BURGER KING $468.88 $468.88
CARIBOU COFFEE $50.00 $50.00
CASCADE II LAND DEVELOPMENT $5.279.91 $1,595.50 $2,441.15 $1,243.26
CASUAL CORNER $3,200.00 $3,200.00
COBORN'S $88.00 $88.00
PMT
COBORN'S/HJ Development $3,662.42 $3,662.42 AGREEMENT
CPG PARTNERS $430.75 $430.75 $506.50 $31.51 $171.15
EDINA DEVELOPMENT $315,038.51 $3,829.97 $13,189.07 $6,585.01 $291,434.46
ERICKSON, RANDI $587.00 $587.00
H.J. DEVELOPMENT $100.00 $100.00
HALLENBECK, GLORIA $37.50 $75.00
LACHAPELLE, TAMMY $75.00 $75.00
MAJORS SPORTS BAR & GRILL $50.00 $50.00
METRO HOME WATERPROOFING $10.00 $10.00
MINNESOTA DEVELOPMENT
AGENCY $23.963.74 $23,265.49 $698.25
MNDOT $30.324.08
MOBIL $22.00 $22.00
MORTGAGE ELECTRONIC $101.67 $101.
OBRIEN, THOMAS P $2.205.00 $2,205.00
OTSEGO, CITY OF $15.830.44
PETERSON, JOSH $826.90 $826.90
PREMIER DEVELOPMENT GROUP $913.14 $908.50 $312.50 $560.64
PROPERTY VISION, INC $110.47 $110.47
SHOPPES AT TOWN LAKES $771.50 $2,061.89 $284.21 $1,060.06
SHOPPES AT TOWNE LAKES 2 $2,123.76
SMACKDOWN BAR & GRILL $617.19 $22.00 $595.19
ST. MICHAEL, ALBERTVILLE DIST $5,104.25 $5,104.25
ST. MICHAEL, CITY OF $21.685.44
T-SQUARED PROPERTIES $800.00 $800.00
TOWNE LAKES $151.947.52 $4.262.29 $1 649.06 $146,194.19
YEARWOOD DEVELOPMENT $1,484.11 $1,015.36 $138.86 $2,033.05
Total $590,004.36 $55,502.63 $23 437.45 $157.076.82 $298947.22
Current 0-30 days $55,502.63 9.41%
30-60 davs $23,437.45 3.97%
60-90 days $157,076.82 26.62%
over 90 day $298,947.22 50.67%
Total outstandina less Edina $219,925.61 37.28%
Total outsandind less Edina more
than 30 days $181,442.02 30.75%
50
.
.
.
~
l\!l?.~~!~tlL€
TO:
FROM:
DATE:
City Council
Tina L. Lannes
December 1, 2005
Project Update
RE:
Council requested an update on outstanding project status. Below are the contracted projects
with amounts paid to date as of November 29,2005:
Project Total Contract Paid to Date Difference
2004 School Pedestrian Trail (Bituminous) $353,876.90 $305,703.71 $48,173.19
2004 School Pedestrian Trail $2,415.00 $2,415.00
2004 Prairie Run $1,595,233.53 $1,567,701.19 $27,532.34
2004 Seal Coat Improvement $19,965.00 $18,692.60 $1,272.40
2004 Street Overlay $98,070.00 $89,978.40 $8,091.60
Public Works Buildina $1 714,020.00 $1,703,489.10 $10,530.90
2003 CSAH 19 Upgrade $1,446,496.70 $1,340,629.92 $105,866.78
2003 Seal Coat Imorovement $10,421.00 $10,061.62 $359.38
Frontaae Avenue Improvements $313,719.00 $248,255.72 $65,463.28
Water Main Change Order $32,394.00 $30,288.00 $2,106.00
CSAH 37 I 60th Street Storm Sewer $49,983.00 $47,941.00 $2,042.00
WWTF Exoansion $3,705,000.00 $2,248,701.00 $1,456,299.00
05 Seal Coat $14,414.40 $14,414.40
05 Overlay $94,713.00 $71,348.90 $23,364.10
Mud Lake Water Main $70 923.14 $67,725.89 $3197.25
Hunter Pass Lift Station $127,600.00 $47,310.00 $80,290.00
Total $9 649,244.67 $7,814,656.45 $1,834,588.22
80.99%
Other Projects with amounts paid to date as of November 29,2005:
Proiect Paid to Date
I 94 Proiect $206,406.95
City Hall $223,586.80
Total $429.993.75
C=
Construction
R = Retainage
C&R
R
C&R
R
R
C&R
C&R
R
C&R
R
R
C&R
C&R
C&R
C&R
51
.
.
.
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO. 2005-56
RESOLUTION SETTING FEES AND MISCELLANEOUS ITEMS
WHEREAS the Albertville City Council sets the following fees by resolution, effective upon the
date of passage of this resolution:
Item
Fee Amount(s)
Fee for special council meeting
$150
Returned check fee
$20 + bank fees
Special Assessment Deferment Income level
Federal Poverty
Level
Liquor & wine licenses
On-sale liquor license
Temporary On-sale liquor
3.2% Malt Liquor on-sale
Oifsale liquor license
Special Sunday license
liquor sales
On-sale wine license
Clubs, 3.2% malt
liquor license
Off-sale Non-Intoxicating license
$3,300
$220/day
$100
$220
$220
$110
$10 / day
$100
Coin-operated amusement device license fee
$35 per device
Bingo license
$25 per year
Garbage hauling license fee
$150
Rental of Lion's Park
Shelter, per day (Residents)
Shelter, per day (Non-residents)
Ball field by Softball Leagues
Softball Tournament (three days)
$150 plus $100 damage deposit
$250 plus $100 damage deposit
$75 per team per season
$400
53
(Research cost for lights maybe charge $25/team for fee increase)
Copies
$0.25 per copy
.
Fax
$3 - rt page
$.25 per page thereafter
Fence permit fee
(check Ordinance 2004-22 states $25)
$25
Comprehensive plan
$100
Comprehensive park plan
$75
Ordinance Book
$300
Standard detail plates
$25
Recycling bin (replacement)
$10
Special assessment search
$20 per property
Massage enterprise license &
investigation fees
$300 per enterprise
.
Massage therapist individual license fee
$50 per therapist
Cable system franchise application fee
$500 plus City expenses
Open burning nuisance abatement fee
$200
Dog license fee
$10 annually
Dog tag replacement fee
$5
Dog impoundment &
redemption fees
(in addition, all
impoundment, transport and
boarding fees incurred by
the City must be paid)
rt impoundment
rd impoundment
Subsequent impoundments
$50 Plus Boarding Fees
$100 Plus Boarding Fees
$200 Plus Boarding Fees
.
54
.
.
.
Water Rates (bimonthly):
Joint Powers portion
Safe Water Test fee
Safe Water Test fee
Base Supply Fee
0-6,667 gallons
6,668-13,335 gallons
13,336-23,335 gallons
23,336-33,335 gallons
Over 33,336 gallons
$.88 flat fee
$1.06 flat fee effective 7/1/06
$6.50
$2.05 per 1,000 gal.
$2.11 per 1,000 gal. over 6,667
$2.17 per 1,000 gal. over 13,335
$2.22 per 1,000 gal. over 23,335
$2.27 per 1,000 gal over 33,335
City of Albertville portion - hold off on rate change until after study has been completed
0-6,667 gallons
6,668-13,335 gallons
13,336-23,335 gallons
Over 23,336
$4.33 minimum bill
$.67 per 1,000 gal. over 6,667
$.72 per 1,000 gal. over 13,335
$.77 per 1,000 gal. over 23,335
Sewer Rates (bimonthly) - hold off on rate change until after study has been completed
0-10,000 gallons $29.72 minimum bill
Over 10,000 gallons $3.34 per 1,000 gal. over 10,000
Storm Waterrates (bimonthly)
Storm Water 1 Residential
Storm Water 2 Residential
Storm Water 3 Residential
Non-residential impervious 0-5%
Non-residential impervious 6-35%
Non-residential impervious 36-65%
Non-residential impervious 66-100%
$2.84 flat fee
$3.94 flat fee
$7.09 flat fee
$4.46 per acre
$8.40 per acre
$11.81 per acre
$21.26 per acre
Water meter test fee
$50
Water shut-offfee
$35
Water turn-on fee
$35
Sewer tap fee
$250
Private sewage disposal system permit fee
$100
$100
Private sewage disposal system inspection fee
55
Rental unit license and inspection fees
Single family detached residential
Single family attached residential
Apartment Buildings
Building maintenance and occupancy appeal fee
Business sign permit fee
Advertising Device (Billboard) permit fee
Advertising Device (Billboard) annual renewal fee
Temporary sign permit fee
Swimming pool permit fee
Temporary outdoor seasonal sales permit fee
Administrative fees/Penalty
Weed Elimination
Mowing
Plowing
Car Fires/Accidents (Non-Residents)
(Freeway)
Maps 2' x 3'
Maps 2' x 3' Color
Maps II"x 17"
Maps 11" x 17" Color
Pop
PID/Legal Description
$100 .
$50 per building + $50 per unit
$150 per building + $10 per unit
$100 plus City expenses
Per building permit fee schedule
$250 per sign face
$250 per sign face
$50
Per building permit fee schedule
$50
$200
Equipment cost plus man hours .
(minimum of $75.00 per hour)
Equipment cost plus man hours
(minimum of $75.00 per hour)
Equipment cost plus man hours
(minimum of $75.00 per hour)
$500 first hour
$200 per hour thereafter
$2
$5
$2
$5
$.50 per can
$10 per property .
56
.
.
.
Zoning Request (Lot size, permitted use, etc)
Lot Survey Copy (no permit pulled)
$25/per property
$1
Real Estate Annual Fee (includes Parade of homes)
False Alarms
1 st and 2nd
3rd
4th
5th
6th
7th
8th
9th
10th
Developer Fees
$50/year
Free of charge
$300
$400
$500
$600
$700
$800
$900
$1,000 etc.
4%
Adopted this 19th day of December, 2005 by the City Council of the City of Albertville.
Don Peterson, Mayor
Bridget Miller, City Clerk
57
.
.
.
NORTHWEST ASSOCIATED CONSULTANTS, INC.
4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422
Telephone: 763.231.2555 Facsimile: 763.231.2561 planners@nacplanning.com
PLANNING REPORT
TO:
Larry Kruse
FROM:
Ann Rexine / Alan Brixius
DATE:
November 3, 2005
RE:
Albertville: Guimont Garage - Conditional Use Permit
FILE NO:
163.06 - 05.34
BACKGROUND
Tim and DarIa Guimont are seeking to add an attached garage to their property located at 11641
50th Street. The subject property is zoned R-1A: Residential Low Density Single Family. The
garage addition will be used as storage space for vehicles and added living space above and
below the garage. The attached garage addition will be located directly northeast of the existing
house measuring five hundred seventy six (576) square feet in area. The applicant's existing six
hundred (600) square foot detached garage will remain, presumably storage space. The
applicants have not included any details of garage construction in submitted application.
Since the addition is part of the principal building, only the garage space square footage is
totaled with the accessory building square footage. Extra living space on the first floor and
above the proposed garage addition is addedto the square footage of the principal building and is
viewed as a resale asset to the home.
Attached for reference:
Exhibit A:
Exhibit B:
Exhibit C:
Project Narrative
Site Plan
City Engineer Comments
ANALYSIS
Conditional Use Permit. A conditional use permit is required for a combined total floor area of
an accessory detached building and/or attached garage exceeding one thousand one hundred fifty
(1,150) square feet and for the construction of more than one accessory building and/or structure.
According to Ordinance (Section 400.2 Subd. F and Section 1000.4. Subd. B, 5 & 7), a
conditional use permit may be granted, provided that:
59
1)
The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official comprehensive plan.
.
The City Comprehensive Plan designates the property for low density residential uses.
The Comprehensive Plan also encourages reinvestment in single-family homes. The
application is consistent with these Comprehensive Plan objectives.
2) The proposed use is or will be compatible with present andfuture uses of the area.
The total accessory floor space is one thousand seventy six (1,176) square feet, slightly
above that allowed by Ordinance. The site is one (1) acre in size and all buildings meet
required setbacks. The new addition will be compatible with surrounding land uses of
the area and the will match the exterior materials of the exiting home.
The applicant indicates that the purpose of the additional attached garage is to house
personal automobiles and add living space on the upper and lower levels. The detached
garage would remain on the property and continue as an accessory building. Access to
the attached garage will be from the driveway to the west. Our staff believes this is an
acceptable arrangement and is characteristic of other homes in the area.
According to submitted project narrative, the applicant's parcel is one (1) acre in size.
This parcel acreage is ample for the construction of an attached garage. In addition,
several residential properties on 50th Street are arranged with an attached garage and .
accessory detached garage, demonstrating that the applicant's request is contextually
characteristic. The site plan indicates that the property slopes approximately fourteen
feet (14') from the principal structure to the existing accessory garage, indicating that the
accessory structure will not be visible from 50th Street.
3) The proposed use conforms with all performance standards contained herein.
According to Zoning Ordinance the lot setback requirements for the R-IA: Residential
Low Density Single Family District are as follows:
Front Yard Side Yard Rear Yard
Not less than thirty feet Lot less than fifteen feet (15') Twenty five feet
(30') each (25 ')
The applicant has indicated that the north front yard setback will be fifty six (56') feet
and side yard setbacks will be eighteen (18') feet to the east property line and fifty nine
(59') feet to the west property line. Rear yard setback is indicated as two hundred twenty
nine (229') feet to south property line.
All buildings on the site meet R-IA setback standards.
.
60
.
.
.
4)
The proposed use will not tend to or actual depreciate the area in which it is proposed.
The new house addition will increase the value of the house.
5) The proposed use can be accommodated with existing public service and will not
overburden the city's service capacity.
The new house addition will not increase the demand on City services or utilities.
6) Traffic generated by the proposed use is within capabilities of streets serving the
property.
The home expansion will not increase the traffic generation from the site.
7) There is a demonstrated need and potential for continued use of the structure and the
purpose is stated.
8)
The building has an evident re-use function related to the principal use and will be
utilized solely as storage with no business or home occupation activity.
-and-
Accessory building shall be maintained in a manner that is compatible with the
adjacent residential uses and does. not present a hazard to public health, safety and
general welfare.
Applicant has indicated that the accessory building will be utilized exclusively for the
storage of personal vehicles and items related to the single family home. As condition of
approval, staff would recommend prohibiting the use of either the attached garage or the
detached accessory building for commercial use or home occupation.
CONCLUSION
Planning staff recommends approval of the CUP. The garage appears to be consistent with the
City's regulations relating to such structures and is contextually reasonable with regard to
surrounding structures of similar construction and use.
This recommendation would include the following conditions:
1. Garage construction is consistent with the architecture and materials of the existing
home.
2. Garage or existing accessory building will not be used for business or home occupation.
cc:
Jon Sutherland
Mark Kasma
Mike Couri
Tim and DarIa Guimont
11641 50th Street
Albertville, MN 55301
61
.
.
.
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO. 2005-52
RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR THE
PROPOSED ATTACHED GARAGE LOCATED AT 11641 50th STREET NE
WITHIN THE CITY OF ALBERTVILLE
WHEREAS, Tim and DarIa Guimont have submitted an application for a conditional
use permit to construct a proposed attached garage to their property located at 11641 50th Street
within the City of Albertville.
WHEREAS, City staffhas reviewed submitted plans and prepared a planning report dated
November 3,2005; and
WHEREAS, the Albertville Planning Commission met and held a public hearing on November
9,2005 to consider the Guimont conditional use permit application; and
WHEREAS, upon review of the staff reports and hearing public testimony, the Planning
Commission closed the public hearing and recommended that the City Council approve the
conditional use permit with the conditions outlined in the November 3, 2005 planning report
with additional conditions recommended by the Planning Commission; and
WHEREAS, the Albertville City Council has received the Guimont conditional use permit
application, staff review documents, and the Planning Commission recommendation, and agrees
with the findings and recommendation of the Planning Commission.
NOW, THEREFORE BE IT RESOLVED, that the City Council of Albertville, Minnesota
hereby approves the amended CUP for the proposed attached garage subject to the attached
Findings of Facts and Decisions.
Findings of Fact: Based on review of the evidence received, the City Council now makes the
following finding of fact and decision:
A. The property is located at 11641 50th Street.
B. The planning report dated November 3, 2005 from Northwest Associated
Consultants as well as the engineering report dated September 26, 2005 from Bolton
& Menk were reviewed and presented to the Planning Commission.
63
C. The proposed use can be accommodated with existing public services and will not .
overburden the City's service capacity.
D. Traffic generated by the proposed use is within capabilities of streets serving the
property as proposed.
E. The requirements of the Albertville Zoning Ordinance have been reviewed In
relation to the proposed use.
F. The proposed actions have been considered in relation to the specific policies and
provisions of and have been found to be consistent with the Comprehensive Plan.
G. The proposed use will be compatible with present and future land uses of the area.
H. The proposed use conforms to applicable Zoning Ordinance performance standards
and approved planned unit development standards.
I. The proposed use will not tend to or actually depreciate the area in which it is
proposed.
Decision: Based on the foregoing information and applicable ordinances, the City Council
APPROVES the conditional use permit based on the most current plans dated August 20, 1997
and information received to date subject to the following conditions:
.
1. Garage construction is consistent with the architecture and materials of the existing home.
2. Garage or existing accessory building will not be used for business or home occupation.
Adopted by the Albertville City Council this 5th day of December, 2005.
Donald Peterson, Mayor
Bridget Miller, City Clerk
.
64
.
.
.
NORTHWEST ASSOCIATED CONSULTANTS, INC.
4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422
Telephone: 763.231.2656 Facsimile: 763.231.2661 planners@nacplanning.com
PLANNING REPORT
TO:
Larry Kruse
FROM:
Ann Rexine / Alan Brixius
DATE:
November 3, 2005
RE:
Albertville: Coborn's Little Dukes Gas Station
Site and Building Plan Review / Conditional Use Permit
FILE NO:
163.06 - 05.32
BACKGROUND
Coborn's Incorporated is seeking site and building plan review and conditional use permit
amendment to add a fifth gasoline pumping station at their location of business at 5398 LaCentre
Avenue. The property is currently zoned B-3: Highway Commercial.
Applicant has indicated that they intend to demolish a seven hundred twenty (720) square foot
section of concrete and asphalt and install a seven hundred twenty (720) square foot fueling pad,
forty- (40) square-foot island and gasoline pumping station. The canopy addition will include
lighting and motor fuel dispensers.
Attached for Reference:
Exhibit A:
Exhibit B:
Exhibit C:
Contextual Site Plan
Detail Site Plan
City Engineer's Comments
ANALYSIS
Conditional Use Permit. The applicant is seeking an amendment to a conditional use permit to
expand their gas sales in the B-3: Highway Commercial District. Motor fuel stations in
Albertville are allowed, subject to specific zoning ordinance regulations regarding location, lot
size, site access, parking, surfacing, lighting and grading.
Location. The submitted application material has indicated that one (1) additional gasoline
pumping station be attached to the eastern end of the existing four (4) gasoline pumping stations.
65
Lot Size. Motor fuel stations are required to have a minimum lot size of twenty thousand .
(20,000) square feet and a minimum lot width of one hundred fifty feet (150'). Subject site is
part of the larger Cobom's site measuring 6.12 acres which exceeds the lot size standard for gas
sales. The subject site lot size will neither increase nor decrease with the expansion of one
gasoline pumping station.
Site Access. Access to the motor fueling stations are gained from two (2) points of entry from
57th Street Northeast. Larger vehicles with prohibitive turning radiuses gain access to the site
from 57th Street Northeast and exit onto Frontage Avenue. According to the contextual site plan
(Exhibit A), site circulation will not be compromised with the introduction of an additional
fueling station and adequate space is provided to access fuel pumps and allow maneuverability
around fuel pumps.
The City Engineer makes the following findings related to site access:
1. The proposed expansion will not impact traffic entering or exiting from the easterly
entrance.
2. The proposed expansion will not impact the easterly service drive.
3. The proposed expansion will not impact the existing easterly loading docks.
Parking. Currently, the convenience store building provides seventeen (17) parking stalls for its .
customers. The number of parking stalls will not be reduced with the expansion of the additional
fueling station. The gas pump island will off two (2) automobile stacking spaces in addition to
existing parking.
The City Engineer makes the following findings related to site parking:
1. The proposed expansion will not impact the existing parking stalls.
Surfacing. As indicated by the submitted site plan, the fueling station addition area is to be
surfaced in concrete. This is an acceptable surfacing treatment.
The City Engineer makes the following findings related to surfacing:
1. Presently, the location of the proposed improvements is a gently sloped paved surface.
The improvements will not require any grade change.
2. The proposed improvements will not generate additional stormwater runoff and will not
impact the existing drainage patterns.
Fueling Stations. Applicant has not indicated fueling station island and canopy details in the
submitted application materials. According to Ordinance, pump islands shall be elevated six
inches (6") above the traveled surface of the site. The canopy shall not exceed eighteen feet .
66
.
.
.
(18') in height and must provide a minimum of fourteen feet (14') of clearance to accommodate
a semi trailer truck passing underneath. The canopy fascia shall not exceed three feet (3') in
vertical height. Conditional use permit is conditional upon submittal of these details and review
and approval by the City.
Setbacks. The site plan indicates that the fuel station island setback is forty-five feet (45') from
the north property line and the canopy setback measures thirty-five feet (35') from the north
property line. According to Ordinance, all pump islands shall be set back at least thirty (30') feet
back from any property line and the outer edge of any canopy shall be set back at least twenty
feet (20') from any property lines. The submitted application materials meet setback standards.
Lighting. Canopy lighting details have not been provided by the applicant. According to
Ordinance, canopy lighting shall consist of canister spotlights recessed into the canopy and no
portion of the light source or fixture may extend below the bottom face of the canopy. Applicant
must submit canopy lighting details and site photometric demonstrating intensity on public
streets not exceeding one foot-candle as measure from the right of way line of said street.
Conditional use permit is conditional upon submittal of these details and review and approval by
the City.
ACTION REQUESTED
The Zoning Ordinance establishes a standard for reviewing conditional use permits which may
include the nature of the adjoining land or buildings, the effect upon traffic into and from the
premises or on any adjoining roads, and all other or further factors as the City shall deem a
prerequisite of consideration in determining the effect of the use on the general welfare, public
health and safety. Following a public hearing, the Planning Commission may consider one of
the following actions:
Conditional Use Permit
1. Approval of the CUP, based on a finding that the proposed outdoor storage is
consistent with the requirements of the zoning ordinance.
2. Denial of the CUP, based on a finding that the proposed location is inconsistent with
the requirements of the zoning ordinance.
STAFF RECOMMENDATION
Planning staff recommends approval of the CUP. The fueling station addition appears to be
consistent with the City's regulations relating to such areas.
This recommendation would include the following conditions:
1.
Fuel station island and canopy details are submitted by the applicant and subject to the
approval of the City.
67
2.
Canopy lighting details are submitted by the applicant and subject to the approval of the
City.
3. Lighting photometric is submitted and subject to the approval by the City.
4. City Engineers comments are reviewed and addressed by the applicant.
cc:
Jon Sutherland
Mark Kasma
Mike Couri
Coborn'sIncorporated
1445 East Highway 23
St. Cloud, MN 56304
68
.
.
.
.
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO. 2005-51
RESOLUTION APPROVING COBORN'S INCORPORATED
CONDITIONAL USE PERMIT AND SITE AND BUILDING PLAN REVIEW
FOR GAS SALES LOCATED AT 5398 LACENTRE AVENUE NE WITHIN
THE CITY OF ALBERTVILLE
WHEREAS, Cobom's Inc. has submitted an application for a conditional use permit and site
and building plan review to add a fifth gasoline pumping station at their location of business at
5398 LaCentre Avenue within the City of Albertville.
WHEREAS, City staff has reviewed submitted plans and prepared a planning report dated
November 3, 2005; and
WHEREAS, the Albertville Planning Commission met and held a public hearing on
November 9,2005 to consider the Guimont conditional use permit application and site and
building plan review; and
.
WHEREAS, upon review of the staff reports and hearing public testimony, the Planning
Commission closed the public hearing and recommended that the City Council approve the
conditional use permit and site and building plan review with the conditions outlined in the
November 3, 2005 planning report with additional conditions recommended by the Planning
Commission; and
WHEREAS, the Albertville City Council has received the Cobom's Incorporated conditional
use permit and site and building plan review application, staff review documents, and the
Planning Commission recommendation, and agrees with the findings and recommendation of the
Planning Commission.
NOW, THEREFORE BE IT RESOLVED, that the City Council of Albertville, Minnesota
hereby approves the amended CUP for the proposed addition of a fifth pumping station subject
to the attached Findings of Facts and Decisions.
Findings of Fact: Based on review of the evidence received, the City Council now makes the
following finding of fact and decision:
A. The property is located at 5398 LaCentre Avenue.
B. The planning report dated November 3, 2005 from Northwest Associated
Consultants as well as the engineering report dated October 13,2005 from Bolton &
. Menk were reviewed and presented to the Planning Commission.
69
C. The proposed use can be accommodated with existing public services and will not .
overburden the City's service capacity.
D. Traffic generated by the proposed use is within capabilities of streets serving the
property as proposed.
E. The requirements of the Albertville Zoning Ordinance have been reviewed In
relation to the proposed use.
F. The proposed actions have been considered in relation to the specific policies and
provisions of and have been found to be consistent with the Comprehensive Plan.
G. The proposed use will be compatible with present and future land uses of the area.
H. The proposed use conforms to applicable Zoning Ordinance performance standards
and approved planned unit development standards.
I. The proposed use will not tend to or actually depreciate the area in which it is
proposed.
Decision: Based on the foregoing information and applicable ordinances, the City Council
APPROVES the conditional use permit based on the most current plans dated September 27,
2005 and information received to date subject to the following conditions:
.
1. Fuel station island and canopy details are submitted by the applicant and subject to the
approval of the City.
2. Canopy lighting details are submitted by the applicant and subject to the approval of the
City.
3. Lighting photometric is submitted and subject to the approval by the City.
4. City Engineers comments are reviewed and addressed by the applicant.
Adopted by the Albertville City Council this 5th day of December, 2005.
Donald Peterson, Mayor
Bridget Miller, City Clerk
.
70
.
.
.
'1\
ElC:::>L ~ 8.. ~.e:1"J I< ,
Consulting Engineers. SUrveyors
1960Pt'erTWDrive · Mankoto. MN 56001-5900
Phone (507) 625-4171 · FAX (&)1) 625-4177
II'-JC:.
~(
.ft1#'.
c
MEMORANDUM
TO:
The Honorable Mayor and City Council
Mark D. Kasma, P.E., Albertville City Engineer
Bolton & Menk, Inc.
November 29, 2005
Project Status Update
FROM:
DATE:
RE:
The following is a brief project status update:
1. Outdoor Hockey/Skating Rink
The finish grading of the disturbed turf areas, turf restoration and placement of the
aggregate surface over the free skating rink have yet to be completed. The Contractor
has stated that the aggregate surfacing and finish grading will be completed this week
and that the turf restoration will be completed in the spring.
2. Towne Lakes 6th Addition
The first lift of pavement has been placed on Linwood Drive and 68th Street N.E. and
private utility work is expected to begin by the end of the month. Other than the
private utility work, construction will be very limited through the winter and early
spring months.
3. Hunter's Pass Estates
Paving of the easterly roadways has been completed and the private utility work will
begin by the end of the month. The Developer has indicated that minor grading
operations will continue into the winter months. Two building permits for model
homes have been released and construction of the two homes has begun. Start-up of
the lift station will take place upon installation of the electrical service.
4. Municipal State Aid (MSA) Routes
The Needs Review for the designated MSA roadways has been completed and
submitted to the State. The City Council needs to pass the resolution included in this
council packet to officially designate the routes.
71
.
.
.
70th Street NE Access Plan
Mr. Larry Kruse,_City Administrator
City of Albertville
5975 Main Avenue NE
Albertville, MN 55301
Re: 70th Street Access Report
Dear Mr. Kruse,
Weare pleased to present the following scope of work, schedule, and fee estimate for the
referenced work:
Scope of Work
Task Description
1) Data Collection
Bolton & Menk will assemble available traffic data from prior studies. City ofOtsego data
along with Albertville information will be assembled for inclusion in a summary report.
Wright County will be contacted to provide information relative to expectations regarding
development and access if70th Street is considered for jurisdictional change to a County
Road_as described in the NE Wright county Sub-area Study. This effort will describe
differences in perceptions and realities regarding existing, pending, and proposed
development access.
2) Facilitate Meetings with County. Otsego. and Albertville
Bolton & Menk will coordinate and facilitate two meetings between the three agencies. The
first meeting will be to provide a forum for exchange of issues and policies regarding
development and access along 70th Street. The second meeting will be to review study
recommendations and to develop consensus between the three agencies.
3) RecommendationslMemorandum of Understanding
Bolton & Menk will prepare a report with recommendations regarding cross-street locations
and access along 70th Street NE between Kadler Avenue NE and MacIiver Avenue NE. This
report will illustrate the existing, pending, and proposed cross-street locations for this
roadway. The report will document issues identified at the meeting between the agencies and
will recommend action to address the concerns.
Bolton & Menk will prepare a Memorandum ofUnderstandin!tMOU. The MOU will clarify
and document a common understanding of issues and the intent of each agency in addressing
the issues. Specifically, this document will acknowledge the conditions along 70th Street and
a process for roadway development in which the agencies can agree. The MOU process is
suggested to help create a common vision that can be used to guide development decisions
73
and roadway improvement decisions. The draft MOU will be provided to all three agencies .
for approval/acknowledgement by their respective officials.
Proposed Fee
We propose to complete the above listed tasks on an hourly basis with a not to exceed cost of
$5,832. The following project table shows estimated staff hours and costs for each task.
Budgeted Staff Hours
70th Street Access Report
Task Senior Traffic Transportation Total
Associate Specialist Planner
1) Data Collection 4 2
2) Facilitate Meetin~s 12 12 8
3) Recommendations 4 8 2
Hourly Rate $126.00 $114.00 $90.00
Total Estimated Staff Hours 16 24 12
Estimated Cost $2,016 $2,736 $1,080 $5,832
Thank you for the opportunity to provide these engineering services to the City of Albertville. .
As always, please feel welcome to contact me if you have any questions.
Sincerely,
Bolton & Menk, Inc.
Mark D. Kasma, P.E.
Albertville City Engineer
cc: Jon Huseby, P.E., Transportation Department Manager
.
74
.
.
.
CSAH 37 Access Plan
Weare pleased to present the following scope of work, schedule, and fee estimate for the
referenced work:
Scope of Work
Task Description
143) Current Conditions Analysis
Bolton & Menk will collect traffic data and road condition information along CSAH 37.
Wright County will be contacted to provide guidelines and recommendations regarding
existing and future conditions for CSAH 37 in this area. A drawing will be made
illustrating issues regarding the existing conditions and issues to consider as properties
develop.
~) Facilitate Meetings between Wright County. Otsego. and Albertville
Bolton & Menk will coordinate and facilitate a meeting with Wright County and the
cities of Otsego and Albertville to discuss issues regarding potential development and
access to properties along CSAH 37 between 1-94 and MacIver Avenue NEIMackenzie
Avenue NE. It is recognized that all three agencies have vested interests in development
along this roadway. The purpose of this meeting will be to share concerns and develop
consensus on a short term and long term vision. It is recognized that two meetings may
be necessary to exchange information, gather input, and to state concerns. Additional
contact may be necessary with individual property owners to gather input and share
information. This process may become necessary in order to consider all issues raised by
affected interests.
314) RecommendationslMemorandum of Understanding
Bolton & Menk will prepare a summary report with recommendations regarding
development and access to the parcels along CSAH 37 between 1-94 and MacIver
Avenue NE/Mackenzie Avenue NE. This report will document the issues
identified at the meeting between the agencies and will recommend action to
address the concerns.
Bolton & Menk will prepare a Memorandum ofDnderstanding (MOD). The
MOD will clarify and document a common understanding of issues and the intent
of each agency in addressing the issues. Specifically, this document will
acknowledge the conditions along CSAH 37 and a process for roadway
development in which the agencies can agree. The MOD process is suggested to
help create a common vision that can be used to guide development decisions and
roadway improvement decisions. The draft MOD will be provided to all three
agencies for approval/acknowledgement by their respective officials.
75
Proposed Fee
We propose to complete the above listed tasks on an hourly basis with a not to exceed cost of .
$5,988. The following project table shows estimated staff hours and costs for each task.
Budgeted Staff Hours
CSAH 37 Access Plan
Task Senior Traffic Transportati Eng. Total
Associat Speciali on Tech.
e st Planner
1) Current Conditions 4 2 8
Analysis
2) Coordinate Meetings 10 10
3) Recommendations 4 12 2 4
Hourly Rate $126.00 $114.00 $90.00 $75.00
Total Estimated Staff 14 26 4 12
Hours
Estimated Cost $1,764 $2,964 $360 $900 $5,988
Thank you for the opportunity to provide these engineering services to the City of Albertville.
As always, please feel welcome to contact me if you have any questions.
.
cc: Jon Huseby, P.E., Transportation Department Manager
.
76
.
.
.
Hotel-Waterpark Traffic Study
November 10, 2005
Mr. Larry Kruse, City Administrator
City of Albertville
5975 Main Avenue NE
Albertville, MN 55301
Re: Albertville Hotel/Waterpark Development
Area Traffic Study
Dear Mr. Kruse,
Weare pleased to present the following scope of work, schedule, and fee estimate for the
referenced study:
Scope of Work
Task Description
5)
Data Collection
Bolton & Menk will assemble available traffic data from prior studies, City, County,
and MnDOT records. We will perform two 48-hour tube counts along La Beaux
Avenue north ofI-94 and a PM peak hour turning movement count on La Beaux
Avenue at the Albertville Mall Outlet Driveway. These data will be necessary to
evaluate current conditions.
6)
Hotel/Waterpark Site Traffic Analysis
Bolton & Menk will perform site analysis to calculate the traffic generated by the proposed
development. The traffic analysis will be consistent with ITE Trip Generation guidelines and
will consider new trips, pass-by trips, and internal capture trips. The influences of the
adjacent developments will be considered. The impacts will be evaluated to current
conditions.
5) Estimate Build-out Traffic from Surrounding Properties
Bolton & Menk will evaluate the adjacent undeveloped parcels for possible build-
out conditions to estimate traffic generation surrounding the
HoteVWaterpark development. This process will use acreage available for
development and assign possible commercial uses. The traffic will be
assigned to the road network planned for the area. The area profosed to
evaluate include the parcels east of Kadler Avenue, south of 70 Street,
along La Beaux Avenue, and north of 1-94. This data will be added to the
77
traffic calculated from 2) above, and compared to the traffic forecast for the .
road network shown in the Northeast Wright County Sub-Area
Transportation Study to estimate future traffic conditions on the road
network in this area.
6) Recommendations
Bolton & Menk will prepare a report with recommendations regarding impacts and future
conditions in the proposed Albertville HotellWaterpark Development. Synchro/Sim Traffic
(traffic modeling software) will be used to evaluate and demonstrate impacts of alternatives
proposed for consideration. The report findings and recommendations, as well as a traffic
modeling demonstration (La Beaux at Mall Drive), will be presented to the City Council.
Proposed Fee
We propose to complete the above listed tasks on an hourly basis with a not to exceed cost of $
7,908. The following project table shows estimated staff hours and costs for each task.
Budgeted Staff Hours
Albertville Hotel/W aterpark Development Traffic Study
Task Senior Traffic Transportation Eng. Total
Associate Specialist Planner Tech.
1) Data Collection 4 2 12
2) Site Analvsis 12 8
3) Adiacent Parcel Analysis 12 16
4) Recommendations 4 8 2
Hourly Rate $126.00 $114.00 $90.00 $75.00
Total Estimated Staff Hours 4 36 20 20
Estimated Cost $504 $4,104 $1,800 $1,500 $7,908
.
Thank you for the opportunity to provide these engineering services to the City of Albertville.
As always, please feel welcome to contact me if you have any questions.
Sincerely,
Bolton & Menk, Inc.
Mark D. Kasma, P.E.
Albertville City Engineer
cc:
Jon Huseby P.E., Transportation Department Manager
.
78
.
.
.
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO. 2005-57
RESOLUTION ESTABLISHING MUNICIPAL STATE AID STREETS
WHEREAS, it appears to the City Council of the City of Albertville that the streets hereinafter
described should be designated Municipal State Aid Streets under the provisions of Minnesota
Law.
NOW THEREFORE, BE IT RESOLVED, by the City Council of the City of Albertville that
the roads described as follows, to-wit:
. 50th Street NE - LaBeaux Avenue NE (CSAH 19) to Main Avenue NE
. 51 st Street NE - LaBeaux Avenue NE (CSAH 19) to Marlowe Avenue NE
. 53rd Street NE - LaBeaux Avenue NE (CSAH 19) to Main Avenue NE
. 52nd Street NE - Barthel Industrial Drive to Marlowe Avenue NE
. 55th Street NE - Main Avenue NE to Barthel Industrial Drive NE
. 57th Street NE- LaBeaux Avenue NE (CSAH 19) to Barthel Industrial Drive NE
. 55th Street NE - LaBeaux Avenue NE (CSAH 19) to LaCentre Avenue NE
. 60th Street NE - CSAH 37 to Main Avenue NE
. 59th Street NE - Main Avenue NE to Barthel Industrial Drive
. LaCentre Avenue NE - 50th Street NE to 57th Street NE
. Lambert Avenue NE - 50th Street NE to 51 st Street NE
. Main Avenue NE - 50th Street NE to CSAH 37
. Barthel Industrial Drive NE - 51 st Street NE to 59th Street NE
. Marlowe Avenue NE - 51 st Street NE to 52nd Street NE
. Lander Avenue NE - 60th Street NE to CSAH 37
. Large Avenue NE- 59th Street NE to CSAH 37
Be, and hereby are established, located, and designated as Municipal State Aid Streets of said
Albertville, subject to the approval of the Commissioner of Transportation of the State of
Minnesota.
BE IT FURTHER RESOLVED, that the City Clerk is hereby authorized and directed to
forward two certified copies of this resolution to the Commissioner of Transportation for her
consideration, and that upon her approval of the designation of said roads or portion thereof, that
same be constructed, improved and maintained as Municipal State Aid Streets of the City of
Albertville.
ADOPTED
,20_.
79
CERTIFICATION
I hereby certify that the above is true and correct copy of a Resolution duly passed, adopted and
approved by the City Council of the City of Albertville on , 20_"
City of Albertville
(SEAL)
City Clerk
80
.
.
.
.
.
.
DRAFT DATED December 1, 2005
CITY OF ALBERTVILLE
DEVELOPER'S AGREEMENT
T-SQUARE BUSINESS PARK
THIS AGREEMENT, entered into this _ day of ~ 2005 by and between Nelson
Building & Development~ Inc.~ collectively referred to herein as "Developer~; and the CITY OF
ALBERTVILLE~ County ofWrigh~ State ofMinneso~ hereinafter referred to as "City";
WITNESSETH:
WHEREAS, Developer is the fee owner of the real property described in the attached
Exhibit A, which real property is part of property proposed to be subdivided and platted for
development, and which subdivision, which is the subject of this Agreemen~ is intended to bear the
name ''T -Square Business Park." The property described on Exhibit A shall hereinafter be referred
to in its entirety as "Said Plat" or "Subject Property"; and
WHEREAS, Robert and Christine Heuring are the owners of additional property within the
T-Square Business Park and have executed a companion but separate Developer's Agreement
covering Lot 2, Block 1 and Outlot A in T -Square Business Park; and
WHEREAS, T -Square Business Park has received final plat approval for 3 lots; and
WHEREAS, this Agreement is entered into for the purpose of setting forth and
memorializing for the parties and subsequent owners, the understandings and covenants of the
parties concerning Said Plat and the conditions imposed thereon; and
WHEREAS, the City has given final approval of Said Plat contingent upon compliance
with certain City requirements including, but not limited to, matters set forth herein; and
WHEREAS, the City requires that certain on- and off-site improvements be installed by the
Developer within Said Plat, which improvements consist of boulevards, top soil and sod, grading
control per lot, bituminous or concrete driveways, parking lots, drainage swales, berming, street
signs~ street lights, street cleanup during project development, erosion control, and other site-related
items; and
NOW, THEREFORE, IT IS HEREBY AND HEREIN MUTUALLY AGREED, in
consideration of each party's promises and considerations herein set forth, as follows:
1. Assienment of Prior Development Agreement Obligations.
A. Developer acknowledges that Said Plat is part of a Developer's Agreement titled
" " between the City and Robert and Christine Heuring dated
81
and recorded as document number in the office of the
Wright County Recorder's Office ("Prior Development Agreement"). The City hereby .
consents to and the Developer accepts the assignment of the rights and obligations of the
Developer under the Prior Development Agreement, but only to the extent that such
agreement pertains to that property which is contained within Said Plat.
B. It is the intent of the parties that this Developer's Agreement supplement the Prior
Development Agreement as to the specific development issues related to T -Square
Business Park, and that these two documents be read together to determine the rights
and obligations of the parties with respect to the property contained within the T -Square
Business Park. In the event of a conflict between the terms of the Prior Development
Agreement and this Developer's Agreement, the terms of this Developer's Agreement
shall control with respect to any conflicting issues within T -Square Business Park, but
any such conflicts shall not alter the terms of the Prior Development Agreement as they
apply to other plats, now existing or to be platted in the future, within the remaining land
area subject to the Prior Development Agreement.
2. Use of Property. Developer agrees that the property on Said Plat shall comply with the
following terms:
A. Developer agrees that all building on Lot 1, Block 1 shall be constructed in the location
shown on the attached Exhibit B. For all lots in Said Plat, the Developer shall comply
with all site plan approvals set by the City Council except where specifically set out in
this agreement. .
B. Developer shall construct the number of parking stalls on Lot 1, Block 1 of Said Plat in
the locations and dimensions as shown on the attached Exhibit B.
C. Developer shall maintain the infiltration plantings shown on Exhibit C in good working
order at all times.
D. Developer shall develop Lot 1, Block 1 of Said Plat consistent with the site plan attached
as Exhibit B.
E. All grading, drainage, utility, wetland mitigation, and transportation issues that arise
during development of Said Plat shall be subject to review and approval by the City
Engineer.
F. Trees, shrubs, berms and screening are to be planted and installed as shown on the
landscape plan attached as Exhibit C. The Developer shall guarantee that all new trees
shall survive for two full years from the time the planting has been completed or will be
replaced at the expense of the Developer. All landscaping as shown on attached Exhibit
C shall be installed prior to the issuance of a certificate of occupancy.
G. Developer shall replace, at its own expense, any plantings as shown on attached Exhibit
C that might be damaged during the construction of any future buildings on Said Plat. .
82
.
.
.
Developer shall guarantee that all plantings replaced pursuant to this paragraph shall
survive for two full years from the date of planting.
H. At the time of the recording of this Agreement at the Wright County Recorder's Office,
Developer shall record a cross-access easement which will allow mutual. cross-access
between Lots 1 and 2, Block 1 in T -Square Business Park.
I. Signs of any size or material shall be prohibited from placement in windows of any and
all buildings constructed within Said Plat.
J. Any ground, building or pylon signage on Said Plat must comply with the City's sign
ordinance and be approved by the City Council.
3. Construction of On- and Off-Site Improvements.
A.
Developer shall construct all on- and off-site improvements including installation of
curb and gutter, sidewalks, boulevards, traffic signs, yard top soil, sod and seed in all
yards, grading control per lot, bituminous or concrete driveways and parking lots,
drainage swales, berming, and like items as necessary, street cleanup during project
development, and erosion control, all as required by City ordinance. All yard areas
shall be sodded with grass or landscaped in accordance with the attached
Landscaping Plan. In all cases permanent turf or grass must be established over all
areas of the lot not covered by a hard or impervious surface. Said on- and off-site
improvements shall be installed no later than October 31, 2006, with the exception
of erosion control, drainage swales and berming, which shall be installed upon initial
grading of Said Plat.
B. The Developer shall, at its own expense, cause street signs to be of such type and to
be installed at such locations as required by the City Engineer and in conformance
with the Manual on Uniform Traffic Control Devices.
C. Developer has submitted a utility plan for Said Plat showing all existing and
proposed utility lines and easements, attached hereto and incorporated herein as
Exhibit D. Developer agrees to have all utilities installed according to this Exhibit
D.
D. Developer shall abide by the City Engineer's requirements for silt fencing of the lots
and access to the lots during building construction.
E.
Notwithstanding the requirements of subparagraph 3A above, the Developer shall
install to the City's satisfaction improvements for each lot or parcel prior to the date
that a certificate of occupancy (temporary or permanent) is issued by the City for a
building located on the lot, unless the certificate of occupancy is issued after October
1 st and before March 30th in any given year, in which case a certificate of
occupancy may be issued if all on- and off-site improvements except landscaping
and sod have been installed. In such cases, the Developer shall cause the required
83
landscaping and sod to be installed by the first June 30th following the issuance of
the occupancy permit. .
4. Surety Requirements.
A. Developer will provide the City with an irrevocable letter of credit (or other surety as
approved by the City Attorney) as security that the obligations of the Developer
under this contract shall be performed. Said letter of credit or surety shall be in the
amount of $ representing the sum of 150% of the estimated cost for
landscaping/screening materials ($ ). Said letter of credit or surety must
meet the approval of the City attorney as to form and issuing bank.
B. The City may draw on said letter of credit or surety to complete work not performed
by Developer (including but not limited to on- and off-site improvements, erosion
control, and other such measures), to pay liens on property to be dedicated to the
City, to reimburse itself for costs incurred in the drafting, execution, administration
or enforcement of this Agreement, to repair or correct deficiencies or other problems
which occur to the landscaping during the warranty period, or to otherwise fulfill the
obligations of Developer under this agreement.
C.
In the event that any cash, irrevocable letter of credit, or other surety referred to
herein is ever utilized and found to be deficient in amount to payor reimburse the
City in total as required herein, the Developer agrees that upon being billed by the
City, Developer will pay within thirty (30) days of the mailing of said billing, the
said deficient amount. If there should be an overage in the amount of utilized
security, the City will, upon making said determination, refund to the Developer any
monies which the City has in its possession which are in excess of the actual costs of
the project as paid by the City.
.
D. Developer hereby agrees to allow the City to specially assess Developer's property
for any and all costs incurred by the City in enforcing any of the terms of this
agreement should Developer's letter of credit or surety prove insufficient or should
Developer fail to maintain said letter of credit or surety in the amount required above
within 30 days of mailing of written request by the City
5. Surety Release.
A.
Periodically, as payments are made by the Developer for the completion of
landscaping improvements, and when it is reasonably prudent, the Developer may
request of the City that the surety be proportionately reduced for that portion of the
landscaping improvements which have been fully completed and payment made
therefore. However, the City shall retain the letter of credit or surety in the amount
of 40% of the estimated construction price of the landscaping during the first year of
the landscape warranty period and 20% of the estimated construction price of the
landscaping during the second year of the landscape warranty period. All such
decisions shall be at the discretion of the City Council. The City's cost for
.
84
.
.
.
processing reduction request(s) shall be billed to the Developer. Such cost shall be
paid to the City within thirty (30) days of the date of mailing of the billing.
B.
The Developer may request of the City a reduction or release of any surety as
follows:
1. When another acceptable letter of credit or surety is furnished to the City to
replace a prior letter of credit or surety.
11. As to all requests brought under this paragraph, the City Council shall have
complete discretion whether to reduce or not to reduce said letter of credit or
surety.
C. The costs incurred by the City in processing any reduction request shall be billed to the
Developer and paid to the City within thirty (30) days of billing.
6. Abandonment of Project - Costs and Expenses.
In the event Developer should abandon the proposed development of the said Plat, the City's
costs and expenses related to attorney's fees, professional review, drafting of this Agreement,
preparation of the feasibility report, plans and specifications, and any other expenses undertaken
in reliance upon Developer's various assertions shall be paid by said Developer within thirty
(30) days after receipt of a bill for such costs from the City. In addition, in the event the
Developer abandons the project, in whole or in part, ceases substantial field work for more than
nine (9) months, fails to provide sufficient ground-cover to prevent continuing soil erosion from
Said Plat, or fails to leave the abandoned property in a condition which can be mowed using
conventional lawn mowing equipment, Developer agrees to pay all costs the City may incur in
taking whatever action is reasonably necessary to provide ground-cover and otherwise restore
Said Plat to the point where undeveloped grounds are level and covered with permanent
vegetation sufficient to prevent continuing soil erosion from Said Plat and to facilitate mowing
of Said Plat. In the event that said costs are not paid, the City may withdraw funds from the
above-mentioned surety for the purpose of paying the costs referred to in this paragraph.
7. Developer to Pay City's Costs and Expenses.
It is understood and agreed that the Developer will reimburse the City for all reasonable
administrative, legal, planning, engineering and other professional costs incurred in the
creation, administration, enforcement or execution of this Agreement and the approval of Said
Plat, as well as all reasonable engineering expenses incurred by the City in designing,
approving, installing, and inspecting said Improvements described above. Developer agrees to
pay all such costs within 30 days of billing by the City. If Developer fails to pay said amounts,
Developer agrees to allow the City to reimburse itself from said surety and/or assess the amount
owed against any or all of Said Plat without objection.
85
8. Development Related Fees and Credits.
Sanitary Sewer and Water Trunk Line Fees. Developer agrees that the City's Sanitary
Sewer Trunk Line Fee Ordinance and Water Trunk Line Fee Ordinance currently
require the Developer to pay $1,400.00 per acre and $1,200.00 per acre respectively,
upon development of said Plat. There are acres in said Plat which received
final plat approval. Therefore, the Sanitary Sewer and Water Trunk Line Fees for all
property receiving final plat approval under this Agreement is $
($ in sewer fees calculated as $1,400.00 x
$ in water fees calculated as $1,200.00 x
.
acres and
acres).
9. Erosion and Siltation Control.
Before any grading is started on any site, all erosion control measures as shown on the approved
Grading, Drainage and Erosion Control Plan shall be strictly complied with as set forth in the
attached Exhibit E. Developer shall also install all erosion control measures deemed necessary
by the City Engineer should the erosion control plan prove inadequate in any respect.
10. Ditch Cleanin~.
Developer shall comply with all requirements set forth for drainage into any county ditch or
other ditch through which water from Said Plat may drain, and shall make any necessary
improvements or go through any necessary procedures to ensure compliance with any federal,
state, county or city requirements, all at Developer's expense. .
11. Maintain Public Property Dama~ed or Cluttered Durin~ Construction.
Developer agrees to assume full financial responsibility for any damage which may occur to
public property including but not limited to streets, street sub- base, base, bituminous surface,
curb, utility system including but not limited to watermain, sanitary sewer or storm sewer when
said damage occurs as a result of the activity which takes place during the development of Said
Plat. The Developer further agrees to pay all costs required to repair the streets, utility systems
and other public property damaged or cluttered with debris when occurring as a direct or
indirect result of the construction that takes place in Said Plat.
Developer agrees to clean the streets on a daily basis if required by the City. Developer
further agrees that any damage to public property occurring as a result of construction
activity on Said Plat will be repaired immediately if deemed to be an emergency by the City.
Developer further agrees that any damage to public property as a result of construction
activity on Said Plat will be repaired within 14 days if not deemed to be an emergency by the
City.
If Developer fails to so clean the streets or repair or maintain said public property, the City may
immediately undertake making or causing it to be cleaned up, repaired or maintained. When the
City undertakes such activity, the Developer shall reimburse the City for all of its expenses
within thirty (30) days of its billing to the Developer. If the Developer fails to pay said bill .
86
.
.
.
within thirty (30) days, then the City may specially assess such costs against the lots within Said
Platandlor take necessary legal action to recover such costs and the Developer agrees that the
City shall be entitled to attorney's fees incurred by the City as a result of such legal action.
12. Temporary Easement Rights.
Developer shall provide access to Said Plat at all reasonable times to the City or its
representatives for purposes of inspection or to accomplish any necessary work pursuant to this
Agreement.
13. Miscellaneous.
A. Developer agrees that all construction items required under this Agreement are items
for which Developer is responsible for completing and all work shall be done at
Developer's expense.
B. If any portion, section, subsection, sentence, clause, paragraph or phrase of this
Contract is for any reason held invalid by a Court of competent jurisdiction, such
decision shall not affect the validity of the remaining portion of this Contract.
C.
Ifbuilding permits are issued prior to the completion and acceptance of public
improvements, the Developer assumes all liability and the costs resulting in delays
in completion of public improvements and damage to public improvements caused
by the City, Developer, its contractors, subcontractors, materialmen, employees,
agents, or third parties.
D. The action or inaction of the City shall not constitute a waiver or amendment to the
provisions of this Contract. To be binding, amendments or waivers shall be in
writing, signed by the parties and approved by written resolution of the City
Council. The City's failure to promptly take legal action to enforce this Contract
shall not be a waiver or release.
E. This Contract shall run with the land and shall be recorded against the title to the
property. After the Developer has completed all work and obligations required of it
under this Contract (including the expiration of the warranty period), at the
Developer's request, the City will execute and deliver to the Developer a release of
its obligations under this Agreement. However, all continuing obligations under this
Agreement shall remain binding upon the properties covered by this Agreement and
their owners. Said continuing obligations include, but are not limited to, paragraphs
1,2, 7, 9, 12, 13, 15, 17, 18, 19,20,21,22,23,24 and 25 of this Agreement.
F. The Developer represents to the City that Said Plat complies with all City, county,
state and federal laws and regulations, including but not limited to: subdivision
ordinances, zoning ordinances, and environmental regulations. If the City
determines that Said Plat does not comply, the City may, at its option, refuse to
87
allow construction or development work in the plat until the Developer so complies.
Upon the City's demand, the Developer shall cease work until there is compliance. .
G. Prior to the execution of this Agreement and prior to the start of any construction on
Said Plat, Developer shall provide the City with evidence of good and marketable
title to all of Said Plat. Evidence of good and marketable title shall consist of a Title
Insurance Policy or Commitment from a national title insurance company, or an
abstract of title updated by an abstract company registered under the laws of the
State of Minnesota.
H. Developer shall comply with all water, ponding and wetland related restrictions, if
any, required by the Wright County Soil and Water Conservation District and/or the
City and any applicable provisions of State or Federal law or regulations.
I. The Albertville City Council reserves the right to allocate wastewater treatment
capacity in a manner it finds to be in the best interests of the public health, safety and
welfare. Developer acknowledges and agrees that the City is currently in the process
of expanding its wastewater treatment plant capacity. Developer further
acknowledges and agrees that delay in the availability of wastewater treatment plant
capacity may occur for some lots located within Said Plat depending upon when
building permits are applied for and that such delay in capacity availability may also
delay the issuance of building permits for some lots within Said Plat.
J.
Developer shall not place any structure at an elevation such that the lowest grade
opening is less than two feet above the highest known surface water level or
ordinary high water level or less than two feet above the 1 DO-year flood level of any
adjacent water body or wetland. If sufficient data on high water levels is not
available, the elevation of the line of permanent aquatic vegetation shall be used as
the estimated high water elevation. When fill is required to meet this elevation, the
fill shall be allowed to stabilize and construction shall not begin until the property
has been approved by the Building Inspector or a professional soils engineer.
.
K. Developer shall obtain all required driveway, utility and other permits as required by
either the City Engineer, Wright County and/or the State of Minnesota
14. Draw on Expiring Letter of Credit.
In the event a surety referred to herein is in the form of an irrevocable letter of credit, which
by its terms may become null and void prior to the time at which all monetary or other
obligations of the Developer are paid or completed, it is agreed that the Developer shall
provide the City with a new letter of credit or other surety, acceptable to the City, at least
forty-five (45) days prior to the expiration of the expiring letter of credit. If a new letter of
credit is not received as required above, the City may, without notice to Developer, declare a
default in the terms of this Agreement and thence draw in part or in total, at the City's
discretion, upon the expiring letter of credit to avoid the loss of surety for the continued
.
88
.
.
.
obligation. The form of said irrevocable letter of credit must be approved by the City
Attorney prior to its issuance. Developer shall maintain said letter of credit in the amount
required by the City at all times.
15. Violation of Agreement.
In the case of default by the Developer, its successors or assigns, of any of the covenants and
agreements herein contained, the City shall give Developer thirty (30) days mailed notice
thereof (via certified mail), and if such default is not cured within said thirty (30) day period,
the City is hereby granted the right and the privilege to declare any deficiencies governed by
this Agreement due and payable to the City in full. The thirty (30) day notice period shall be
deemed to run from the date of deposit in the United States Mail. Upon failure to cure by
Developer, the City may thence immediately and without notice or consent complete some
or all of the Developer's obligations under this Agreement, and bring legal action against the
Developer to collect any sums due to the City pursuant to this Agreement, plus all costs and
attorney's fees incurred in enforcing this agreement. The City may also specially assess all
said costs incurred upon default against the properties in Said Plat pursuant to the terms of
this agreement.
Notwithstanding the 30-day notice period provided for above, in the event that a default by
Developer will reasonably result in irreparable harm to the environment or to public
property, or result in an imminent and serious public safety hazard, the City may
immediately exercise all remedies available to it under this agreement in an effort to prevent,
reduce or otherwise mitigate such irreparable harm or safety hazard, provided that the City
makes good-faith, reasonable efforts to notify the Developer as soon as is practicable of the
default, the projected irreparable harm or safety hazard, and the intended actions of the City
to remedy said harm.
This paragraph 15 of this Agreement shall not apply to any acts or rights of the City under
paragraph 14, and no notice need be given to the Developer as a condition precedent to the
City drawing upon the expiring irrevocable letter of credit as therein authorized. The City
may elect to give notice to Developer of the City's intent to draw upon the surety without
waiving the City's right to draw upon the surety at a future time without notice to the
Developer.
Breach of any of the terms of this Contract by the Developer shall be grounds for denial of
building permits.
16. Dedications to the City.
A.
Municipal Improvement Dedications.
The Developer, upon presentation to the City of evidence of good and marketable
title to Said Plat, and upon completion of all construction work and certification
of completion by the City Engineer, shall dedicate all street right-of-ways and
drainage and utility easements to the City. Upon acceptance of dedication,
89
Developer shall provide to the City "As-Builts" of all storm sewers and other
Municipal Improvements required under this Agreement. Acceptance by City of .
any dedication shall occur upon passage of a resolution to such effect by the City .
Council.
B. Park Dedication.
The Developer is required to pay a cash contribution of $ in
satisfaction of the City's park and trail dedication requirements for Said Plat. This
charge is calculated as follows: acres x $7,500.00 per acre =
$
17. Phased Development.
Approval of this phase of Said Plat shall not be construed as approval of future phases nor
shall approval of this phase bind the City to approve future Development phases. All future
Development phases shall be governed by the City's Comprehensive Plan, Zoning
ordinance, Subdivision ordinance, and other ordinances in effect at the time such future
Development phases are approved by the City.
18. Indemnity.
Developer shall hold the City and its officers and employees harmless from claims made by
Developer and third parties for damages sustained or costs incurred resulting from the .
approval and development of Said Plat. The Developer shall indemnify the City and its
officers and employees for all costs, damages or expenses which the City may payor incur
in consequence of such claims, including attorney's fees. Third parties shall have no
recourse against the City under this contract.
19. Assi3Dment of Contract.
The obligations of the Developer under this Contract can be assigned by the Developer.
However, the Developer shall not be released from its obligations under this contract
without the express written consent of the City Council through Council resolution.
20. Limited Approval
Approval of this Agreement by the City Council in no way constitutes approval of anything
other than that which is explicitly specified in this Agreement.
21. Professional Fees.
The Developer will pay all reasonable professional fees incurred by the City as a result of
City efforts to enforce the terms of this Agreement. Said fees include attorney's fees,
engineer's fees, planner's fees, and any other professional fees incurred by the City in
attempting to enforce the terms of this Agreement. The Developer will also pay all .
90
.
.
.
reasonable attorney's fees and professional fees incurred by the City in the event an action is
brought upon a letter of credit or other surety furnished by the Developer as provided herein.
22.
Plans Attached as Exhibits.
All plans attached to this Agreement as Exhibits are incorporated into this Agreement by
reference as they appear. Unless otherwise specified in this agreement, Developer is bound
by said plans and responsible for implementation of said plans as herein incorporated.
23. Integration Clause. Modification by Written Agreement Only.
This Agreement represents the full and complete understanding of the parties and neither
party is relying on any prior agreement or statement( s), whether oral or written.
Modification of this Agreement may occur only if in writing and signed by a duly
authorized agent of both parties.
24. Allocation of Special Assessments. Developer acknowledges that there are currently
$ of special assessments levied against all properties which comprise T -Square
Business Park. Developer consents to and hereby requests that the City reallocate said
special assessments among the properties in T -Square Business Park as follows:
Lot 1, Block 1
Lot 2, Block 1
Outlot A
$
$
$0.00
Developer further waives its right under Minn. Stat. ~ 429.0_ to a public hearing for the
reallocation of said special assessments, and also waives the right to appeal said reallocation
of said special assessments to District Court pursuant to Minn. Stat. 429.081 (as well as
pursuant to any other right of appeal which may exist), provided said reallocation is
consistent with the amounts and lot allocations set forth in this paragraph.
25. Notification Information.
Any notices to the parties herein shall be in writing, delivered by hand (to the City Clerk for
the City) or registered mail addressed as follows to the following parties:
City of Albertville
c/o City Clerk
P.O. Box 9
Albertville, MN 55301
Telephone: (763) 497-3384
Nelson Building & Development, Inc.
STREET
CITY, STATE ZIP
PHONE
91
26. Agreement Effect
This Agreement shall be binding upon and extend to the representatives, heirs, successors
and assigns of the parties hereto.
CITY OF ALBERTVILLE,
By
Its Mayor
By
Its Clerk
NELSON DEVELOPMENT INC.
By
Its
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this day of
,2005, by Donald Peterson as Mayor of the City of Albertville, a Minnesota
municipal corporation, on behalf of the city and pursuant to the authority of the City Council.
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
92
.
.
.
.
.
.
The foregoing instrument was acknowledged before me this day of
, 2005, by Bridget Miller, as Clerk of the City of Albertville, a Minnesota
municipal corporation, on behalf of the city and pursuant to the authority of the City Council.
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this day of
, 2005, by , as of Nelson Building &
Development, Inc.
Notary Public
DRAFfED BY:
Couri, MacArthur & Ruppe Law Office
P.O. Box 369
705 Central Avenue East
St. Michael, MN 55376
(763) 497-1930
93
EXHmIT A TO DEVELOPER'S AGREEMENT
The legal description of Said Plat to which this Developer's Agreement applies is as follows:
Lot 1, Block 1
All said property is located in T-Square Business Park, City of Albertville, County of Wright,
Minnesota.
94
.
.
.
.
EXHmIT B
Site Plan
EXHmIT C
Landscaping Plan
EXHmIT D
Sanitary Sewer, Water Main, and Storm Sewer Plan
EXHmIT E
Grading Plan
.
.
95
.
DRAFT DATED December 1,2005
CITY OF ALBERTVILLE
DEVELOPER'S AGREEMENT
T-SQUARE BUSINESS PARK
THIS AGREEMENT, entered into this _ day of -' 2005 by and between Nelson
Building & Development, Inc., collectively referred to herein as "Developer"; and the CITY OF
ALBERTVILLE, County of Wright, State of Minnesota, hereinafter referred to as "City";
WITNESSETH:
WHEREAS, Developer is the fee owner of the real property described in the attached
Exhibit A, which real property is part of property proposed to be subdivided and platted for
development, and which subdivision, which is the subject of this Agreement, is intended to bear the
name "T -Square Business Park." The property described on Exhibit A shall hereinafter be referred
to in its entirety as "Said Plat" or "Subject Property"; and
WHEREAS, Nelson Building & Development, Inc. is the owner of additional property
within the T -Square Business Park and has executed a companion but separate Developer's
. Agreement covering Lot 1, Block 1 in T -Square Business Park; and
WHEREAS, T -Square Business Park has received final plat approval for 3 lots; and
WHEREAS, this Agreement is entered into for the purpose of setting forth and
memorializing for the parties and subsequent owners, the understandings and covenants of the
parties concerning Said Plat and the conditions imposed thereon; and
WHEREAS, the City has given final approval of Said Plat contingent upon compliance
with certain City requirements including, but not limited to, matters set forth herein; and
WHEREAS, the City requires that certain on- and off-site improvements be installed by the
Developer within Said Plat, which improvements consist of boulevards, top soil and sod, grading
control per lot, bitwninous or concrete driveways, parking lots, drainage swales, benning, street
signs, street lights, street cleanup during project development, erosion control, and other site-related
items; and
NOW, THEREFORE, IT IS HEREBY AND HEREIN MUTUALLY AGREED, in
consideration of each party's promises and considerations herein set forth, as follows:
1. Assignment of Prior Development Aereement Obligations.
.
C. Developer acknowledges that Said Plat is part of a Developer's Agreement titled
" " between the City and Robert and Christine Heuring dated
97
and recorded as document number in the office of the
Wright County Recorder's Office ("Prior Development Agreement"). .
D. It is the intent of the parties that this Developer's Agreement supplement the Prior
Development Agreement as to the specific development issues related to T -Square
Business Park, and that these two documents be read together to determine the rights
and obligations of the parties with respect to the property contained within the T -Square
Business Park. In the event of a conflict between the terms of the Prior Development
Agreement and this Developer's Agreement, the terms of this Developer's Agreement
shall control with respect to any conflicting issues within T -Square Business Park, but
any such conflicts shall not alter the terms of the Prior Development Agreement as they
apply to other plats, now existing or to be platted in the future, within the remaining land
area subject to the Prior Development Agreement.
2. Use of Property. Developer agrees that the property on Said Plat shall comply with the
following terms:
K. All grading, drainage, utility, wetland mitigation, and transportation issues that arise
during development of Said Plat shall be subject to review and approval by the City
Engineer.
L. At the time of the recording of this Agreement at the Wright County Recorder's Office,
Developer shall record a cross-access easement which will allow mutual cross-access
between Lots I and 2, Block I in T -Square Business Park. .
M. Signs of any size or material shall be prohibited from placement in windows of any and
all buildings constructed within Said Plat.
N. Any ground, building or pylon signage on Said Plat must comply with the City's sign
ordinance and be approved by the City Council.
3. Construction of On- and Off-Site Improvements.
A. Developer shall construct all on- and off-site improvements including installation of
curb and gutter, sidewalks, boulevards, traffic signs, yard top soil, sod and seed in all
yards, grading control per lot, bituminous or concrete driveways and parking lots,
drainage swales, berming, and like items as necessary, street cleanup during project
development, and erosion control, all as required by City ordinance. All yard areas
shall be sodded with grass or landscaped in accordance with the attached
Landscaping Plan. In all cases permanent turf or grass must be established over all
areas of the lot not covered by a hard or impervious surface. Said on- and off-site
improvements shall be installed no later than October 31, 2006, with the exception
of erosion control, drainage swales and berming, which shall be installed upon initial
grading of Said Plat, and except that the parking lot for Lot 2 may be constructed
when a building is constructed on such lot.
.
98
.
.
.
B.
The Developer shall, at its own expense, cause street signs to be of such type and to
be installed at such locations as required by the City Engineer and in conformance
with the Manual on Uniform Traffic Control Devices.
C. Developer shall abide by the City Engineer's requirements for silt fencing of the lots
and access to the lots during building construction.
D. Notwithstanding the requirements of subparagraph 3A above, the Developer shall
install to the City's satisfaction improvements for each lot or parcel prior to the date
that a certificate of occupancy (temporary or permanent) is issued by the City for a
building located on the lot, unless the certificate of occupancy is issued after October
1 st and before March 30th in any given year, in which case a certificate of
occupancy may be issued if all on- and off-site improvements except landscaping
and sod have been installed. In such cases, the Developer shall cause the required
landscaping and sod to be installed by the first June 30th following the issuance of
the occupancy permit.
4. Surety Requirements.
A.
Developer will provide the City with an irrevocable letter of credit (or other surety as
approved by the City Attorney) as security that the obligations of the Developer
under this contract shall be performed. Said letter of credit or surety shall be in the
amount of $5,000.00. Said letter of credit or surety must meet the approval of the
City attorney as to form and issuing bank.
B. The City may draw on said letter of credit or surety to complete work not performed
by Developer (including but not limited to on- and off-site improvements, erosion
control, and other such measures), to pay liens on property to be dedicated to the
City, to reimburse itself for costs incurred in the drafting, execution, administration
or enforcement of this Agreement, to repair or correct deficiencies or other problems
which occur to the landscaping during the warranty period, or to otherwise fulfill the
obligations of Developer under this agreement.
C. In the event that any cash, irrevocable letter of credit, or other surety referred to
herein is ever utilized and found to be deficient in amount to payor reimburse the
City in total as required herein, the Developer agrees that upon being billed by the
City, Developer will pay within thirty (30) days of the mailing of said billing, the
said deficient amount. If there should be an overage in the amount of utilized
security, the City will, upon making said determination, refund to the Developer any
monies which the City has in its possession which are in excess of the actual costs of
the project as paid by the City.
D.
Developer hereby agrees to allow the City to specially assess Developer's property
for any and all costs incurred by the City in enforcing any of the terms of this
agreement should Developer's letter of credit or surety prove insufficient or should
99
Developer fail to maintain said letter of credit or surety in the amount required above .
within 30 days of mailing of written request by the City
5. Surety Release.
A. Periodically, as payments are made by the Developer for the completion of
landscaping improvements, and when it is reasonably prudent, the Developer may
request of the City that the surety be proportionately reduced for that portion of the
landscaping improvements which have been fully completed and payment made
therefore. However, the City shall retain the letter of credit or surety in the amount
of 40% of the estimated construction price of the landscaping during the first year of
the landscape warranty period and 20% of the estimated construction price of the
landscaping during the second year of the landscape warranty period. All such
decisions shall be at the discretion of the City Council. The City's cost for
processing reduction request(s) shall be billed to the Developer. Such cost shall be
paid to the City within thirty (30) days of the date of mailing of the billing.
B. The Developer may request of the City a reduction or release of any surety as
follows:
1. When another acceptable letter of credit or surety is furnished to the City to
replace a prior letter of credit or surety.
11.
As to all requests brought under this paragraph, the City Council shall have
complete discretion whether to reduce or not to reduce said letter of credit or
surety.
.
D. The costs incurred by the City in processing any reduction request shall be billed to the
Developer and paid to the City within thirty (30) days of billing.
6. Abandonment of Project - Costs and Expenses.
In the event Developer should abandon the proposed development of the said Plat, the City's
costs and expenses related to attorney's fees, professional review, drafting of this Agreement,
preparation of the feasibility report, plans and specifications, and any other expenses undertaken
in reliance upon Developer's various assertions shall be paid by said Developer within thirty
(30) days after receipt of a bill for such costs from the City. In addition, in the event the
Developer abandons the project, in whole or in part, ceases substantial field work for more than
nine (9) months, fails to provide sufficient ground-cover to prevent continuing soil erosion from
Said Plat, or fails to leave the abandoned property in a condition which can be mowed using
conventional lawn mowing equipment, Developer agrees to pay all costs the City may incur in
taking whatever action is reasonably necessary to provide ground-cover and otherwise restore
Said Plat to the point where undeveloped grounds are level and covered with pennanent
vegetation sufficient to prevent continuing soil erosion from Said Plat and to facilitate mowing
.
100
.
.
.
of Said Plat. In the event that said costs are not paid, the City may withdraw funds from the
above-mentioned surety for the purpose of paying the costs referred to in this paragraph.
7. Developer to Pay City's Costs and Expenses.
It is understood and agreed that the Developer will reimburse the City for all reasonable
administrative, legal, planning, engineering and other professional costs incurred in the
creation, administration, enforcement or execution of this Agreement and the approval of Said
Plat, as well as all reasonable engineering expenses incurred by the City in designing,
approving, installing, and inspecting said Improvements described above. Developer agrees to
pay all such costs within 30 days of billing by the City. If Developer fails to pay said amounts,
Developer agrees to allow the City to reimburse itself from said surety and/or assess the amount
owed against any or all of Said Plat without objection.
8. Development Related Fees and Credits.
Sanitary Sewer and Water Trunk Line Fees. Developer agrees that the City's Sanitary
Sewer Trunk Line Fee Ordinance and Water Trunk Line Fee Ordinance currently
require the Developer to pay $1,400.00 per acre and $1,200.00 per acre respectively,
upon development of said Plat. There are acres in said Plat which received
final plat approval. Therefore, the Sanitary Sewer and Water Trunk Line Fees for all
property receiving final plat approval under this Agreement is $
($ in sewer fees calculated as $1,400.00 x
$ in water fees calculated as $1,200.00 x
acres and
acres).
9. Erosion and Siltation Control
Before any grading is started on any site, all erosion control measures must be approved by the
City Engineer. Developer shall also install all erosion control measures deemed necessary by
the City Engineer should the erosion control plan prove inadequate in any respect.
10. Ditch Cleaning.
Developer shall comply with all requirements set forth for drainage into any county ditch or
other ditch through which water from Said Plat may drain, and shall make any necessary
improvements or go through any necessary procedures to ensure compliance with any federal,
state, county or city requirements, all at Developer's expense.
11. Maintain Public Property Damaged or Cluttered During Construction.
Developer agrees to assume full financial responsibility for any damage which may occur to
public property including but not limited to streets, street sub- base, base, bituminous surface,
curb, utility system including but not limited to watermain, sanitary sewer or storm sewer when
said damage occurs as a result of the activity which takes place during the development of Said
Plat. The Developer further agrees to pay all costs required to repair the streets, utility systems
101
and other public property damaged or cluttered with debris when occurring as a direct or
indirect result of the construction that takes place in Said Plat.
.
Developer agrees to clean the streets on a daily basis if required by the City. Developer
further agrees that any damage to public property occurring as a result of construction
activity on Said Plat will be repaired immediately if deemed to be an emergency by the City.
Developer further agrees that any damage to public property as a result of construction
activity on Said Plat will be repaired within 14 days if not deemed to be an emergency by the
City.
If Developer fails to so clean the streets or repair or maintain said public proPerty, the City may
immediately undertake making or causing it to be cleaned up, repaired or maintained. When the
City undertakes such activity, the Developer shall reimburse the City for all of its expenses
within thirty (30) days of its billing to the Developer. If the Developer fails to pay said bill
within thirty (30) days, then the City may specially assess such costs against the lots within Said
Plat and/or take necessary legal action to recover such costs and the Developer agrees that the
City shall be entitled to attorney's fees incurred by the City as a result of such legal action.
12. Temporary Easement Ripts.
Developer shall provide access to Said Plat at all reasonable times to the City or its
representatives for purposes of inspection or to accomplish any necessary work pursuant to this
Agreement.
.
13. Miscellaneous.
A. Developer agrees that all construction items required under this Agreement are items
for which Developer is responsible for completing and all work shall be done at
Developer's expense.
B. If any portion, section, subsection, sentence, clause, paragraph or phrase of this
Contract is for any reason held invalid by a Court of competent jurisdiction, such
decision shall not affect the validity of the remaining portion of this Contract.
C. Ifbuilding permits are issued prior to the completion and acceptance of public
improvements, the Developer assumes all liability and the costs resulting in delays
in completion of public improvements and damage to public improvements caused
by the City, Developer, its contractors, subcontractors, materialmen, employees,
agents, or third parties.
D. The action or inaction of the City shall not constitute a waiver or amendment to the
provisions of this Contract. To be binding, amendments or waivers shall be in
writing, signed by the parties and approved by written resolution of the City
Council. The City's failure to promptly take legal action to enforce this Contract
shall not be a waiver or release.
.
102
.
E.
This Contract shall run with the land and shall be recorded against the title to the
property. After the Developer has completed all work and obligations required of it
under this Contract (including the expiration of the warranty period), at the
Developer's request, the City will execute and deliver to the Developer a release of
its obligations under this Agreement. However, all continuing obligations under this
Agreement shall remain binding upon the properties covered by this Agreement and
their owners. Said continuing obligations include, but are not limited to, paragraphs
1,2, 7, 9, 12, 13, 15, 17, 18, 19,20,21,22,23,24 and 25 of this Agreement.
F. The Developer represents to the City that Said Plat complies with all City, county,
state and federal laws and regulations, including but not limited to: subdivision
ordinances, zoning ordinances, and environmental regulations. If the City
detennines that Said Plat does not comply, the City may, at its option, refuse to
allow construction or development work in the plat until the Developer so complies.
Upon the City's demand, the Developer shall cease work until there is compliance.
G. Prior to the execution of this Agreement and prior to the start of any construction on
Said Plat, Developer shall provide the City with evidence of good and marketable
title to all of Said Plat. Evidence of good and marketable title shall consist of a Title
Insurance Policy or Commitment from a national title insurance company, or an
abstract of title updated by an abstract company registered under the laws of the
State of Minnesota.
.
H.
Developer shall comply with all water, ponding and wetland related restrictions, if
any, required by the Wright County Soil and Water Conservation District and/or the
City and any applicable provisions of State or Federal law or regulations.
I. The Albertville City Council reserves the right to allocate wastewater treatment
capacity in a manner it finds to be in the best interests of the public health, safety and
welfare. Developer acknowledges and agrees that the City is currently in the process
of expanding its wastewater treatment plant capacity. Developer further
acknowledges and agrees that delay in the availability of wastewater treatment plant
capacity may occur for some lots located within Said Plat depending upon when
building permits are applied for and that such delay in capacity availability may also
delay the issuance of building permits for some lots within Said Plat.
J. Developer shall not place any structure at an elevation such that the lowest grade
opening is less than two feet above the highest known surface water level or
ordinary high water level or less than two feet above the l00-year flood level of any
adjacent water body or wetland. If sufficient data on high water levels is not
available, the elevation of the line of pennanent aquatic vegetation shall be used as
the estimated high water elevation. When fill is required to meet this elevation, the
fill shall be allowed to stabilize and construction shall not begin until the property
has been approved by the Building Inspector or a professional soils engineer.
.
103
K.
Developer shall obtain all required driveway, utility and other permits as required by
either the City Engineer, Wright County and/or the State of Minnesota.
.
14. Draw on Expiring Letter of Credit.
In the event a surety referred to herein is in the form of an irrevocable letter of credit, which
by its terms may become null and void prior to the time at which all monetary or other
obligations of the Developer are paid or completed, it is agreed that the Developer shall
provide the City with a new letter of credit or other surety, acceptable to the City, at least
forty-five (45) days prior to the expiration of the expiring letter of credit. Ifa new letter of
credit is not received as required above, the City may, without notice to Developer, declare a
default in the terms of this Agreement and thence draw in part or in total, at the City's
discretion, upon the expiring letter of credit to avoid the loss of surety for the continued
obligation. The form of said irrevocable letter of credit must be approved by the City
Attorney prior to its issuance. Developer shall maintain said letter of credit in the amount
required by the City at all times.
15. Violation of Agreement.
In the case of default by the Developer, its successors or assigns, of any of the covenants and
agreements herein contained, the City shall give Developer thirty (30) days mailed notice
thereof (via certified mail), and if such default is not cured within said thirty (30) day period,
the City is hereby granted the right and the privilege to declare any deficiencies governed by .
this Agreement due and payable to the City in full. The thirty (30) day notice period shall be
deemed to run from the date of deposit in the United States Mail. Upon failure to cure by
Developer, the City may thence immediately and without notice or consent complete some
or all of the Developer's obligations under this Agreement, and bring legal action against the
Developer to collect any sums due to the City pursuant to this Agreement, plus all costs and
attorney's fees incurred in enforcing this agreement. The City may also specially assess all
said costs incurred upon default against the properties in Said Plat pursuant to the terms of
this agreement.
Notwithstanding the 30-day notice period provided for above, in the event that a default by
Developer will reasonably result in irreparable harm to the environment or to public
property, or result in an imminent and serious public safety hazard, the City may
immediately exercise all remedies available to it under this agreement in an effort to prevent,
reduce or otherwise mitigate such irreparable harm or safety hazard, provided that the City
makes good-faith, reasonable efforts to notify the Developer as soon as is practicable of the
default, the projected irreparable harm or safety hazard, and the intended actions of the City
to remedy said harm.
This paragraph 15 of this Agreement shall not apply to any acts or rights of the City under
paragraph 14, and no notice need be given to the Developer as a condition precedent to the
City drawing upon the expiring irrevocable letter of credit as therein authorized. The City
may elect to give notice to Developer of the City's intent to draw upon the surety without .
104
.
.
.
waiving the City's right to draw upon the surety at a future time without notice to the
Developer.
Breach of any of the terms of this Contract by the Developer shall be grounds for denial of
building permits.
16. Dedications to the City.
A. Municipal Improvement Dedications.
The Developer, upon presentation to the City of evidence of good and marketable
title to Said Plat, and upon completion of all construction work and certification
of completion by the City Engineer, shall dedicate all street right-of-ways and
drainage and utility easements to the City. Upon acceptance of dedication,
Developer shall provide to the City "As-Builts" of all storm sewers and other
Municipal Improvements required under this Agreement. Acceptance by City of
any dedication shall occur upon passage of a resolution to such effect by the City
Council.
B.
Park Dedication.
The Developer is required to pay a cash contribution of $ in
satisfaction of the City's park and trail dedication requirements for Said Plat. This
charge is calculated as follows: acres x $7,500.00 per acre =
$
C.
Land Dedication.
Developer shell deed Outlot A to the City via warranty deed at the time this
Agreement is recorded. Developer and City agree that the deeding of Said Outlot
A to the City shall not be considered a park dedication in any respect.
17. Phased Development
Approval of this phase of Said Plat shall not be construed as approval of future phases nor
shall approval of this phase bind the City to approve future Development phases. All future
Development phases shall be governed by the City's Comprehensive Plan, Zoning
ordinance, Subdivision ordinance, and other ordinances in effect at the time such future
Development phases are approved by the City.
18.
Indemnity.
Developer shall hold the City and its officers and employees harmless from claims made by
Developer and third parties for damages sustained or costs incurred resulting from the
approval and development of Said Plat. The Developer shall indemnify the City and its
officers and employees for all costs, damages or expenses which the City may payor incur
105
in consequence of such claims, including attorney's fees. Third parties shall have no
recourse against the City under this contract.
.
19. Assignment of Contract.
The obligations of the Developer under this Contract can be assigned by the Developer.
However, the Developer shall not be released from its obligations under this contract
without the express written consent of the City Council through Council resolution.
20. Limited Approval.
Approval of this Agreement by the City Council in no way constitutes approval of anything
other than that which is explicitly specified in this Agreement.
21. Professional Fees.
The Developer will pay all reasonable professional fees incurred by the City as a result of
City efforts to enforce the terms of this Agreement. Said fees include attorney's fees,
engineer's fees, planner's fees, and any other professional fees incurred by the City in
attempting to enforce the terms of this Agreement. The Developer will also pay all
reasonable attorney's fees and professional fees incurred by the City in the event an action is
brought upon a letter of credit or other surety furnished by the Developer as provided herein.
22.
Plans Attached as Exhibits.
.
All plans attached to this Agreement as Exhibits are incorporated into this Agreement by
reference as they appear. Unless otherwise specified in this agreement, Developer is bound
by said plans and responsible for implementation of said plans as herein incorporated.
23. Integration Clause. Modification by Written Agreement Only.
This Agreement represents the full and complete understanding of the parties and neither
party is relying on any prior agreement or statement(s), whether oral or written.
Modification of this Agreement may occur only if in writing and signed by a duly
authorized agent of both parties.
24. Allocation of Special Assessments. Developer acknowledges that there are currently
$ of special assessments levied against all properties which comprise T -Square
Business Park. Developer consents to and hereby requests that the City reallocate said
special assessments among the properties in T -Square Business Park as follows:
Lot 1, Block 1
Lot 2, Block 1
Outlot A
$
$
$0.00
.
106
.
.
.
25.
26.
Developer further waives its right under Minn. Stat. ~ 429.0_ to a public hearing for the
reallocation of said special assessments, and also waives the right to appeal said reallocation
of said special assessments to District Court pursuant to Minn. Stat. 429.081 (as well as
pursuant to any other right of appeal which may exist), provided said reallocation is
consistent with the amounts and lot allocations set forth in this paragraph.
Notification Information.
Any notices to the parties herein shall be in writing, delivered by hand (to the City Clerk for
the City) or registered mail addressed as follows to the following parties:
City of Albertville
c/o City Clerk
P.O. Box 9
Albertville,~ 55301
Telephone: (763) 497-3384
Robert and Christine Heuring
STREET
CITY, STATE ZIP
PHONE
AlP"eement Effect.
This Agreement shall be binding upon and extend to the representatives, heirs, successors
and assigns of the parties hereto.
CITY OF ALBERTVILLE,
By
Its Mayor
By
Its Clerk
NELSON DEVELOPMENT INC.
By
Its
107
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
.
The foregoing instrument was acknowledged before me this day of
,2005, by Donald Peterson as Mayor of the City of Albertville, a Minnesota
municipal corporation, on behalf of the city and pursuant to the authority of the City Council.
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this day of
, 2005, by Bridget Miller, as Clerk of the City of Albertville, a Minnesota .
municipal corporation, on behalf of the city and pursuant to the authority of the City Council.
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this
, 2005, by Robert Heuring.
day of
Notary Public
.
108
.
.
.
STATE OF MINNESOTA)
) ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this
, 2005, by Christine Heuring.
Notary Public
DRAFfED BY:
Couri, MacArthur & Ruppe Law Office
P.O. Box 369
705 Central Avenue East
S1. Michael, MN 55376
763 497-1930
day of
109
EXHmIT A TO DEVELOPER'S AGREEMENT
The legal description of Said Plat to which this Developer's Agreement applies is as follows:
Lot 2, Block 1
Outlot A
All said property is located in T-Square Business Park, City of Albertville, County of Wright,
Minnesota.
110
-
.
.
.
.
.
.
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
ORDINANCE NO. 2005-09
AN ORDINANCE MODIFYING CITY CODE SECTIONS
9-1-2-1, 9-1-2-2, 9-5-4 and 10-1-3
THE CITY COUNCIL OF THE CITY OF ALBERTVILLE ORDAINS AS FOLLOWS:
Section 1. Intent. It is the intent of this Ordinance to amend the City of Albertville City Code to
reflect the increasing costs for the City associated with providing water access, sanitary sewer
access, connection charges and inspecting improvements for new residential developments.
Section 2. 9-1-2-1 Water Trunk Access Charge: The City hereby modifies Albertville City Code
Section 9-1-2-1 Paragraph D to read as follows:
D. Amount Of Charge: The municipal water trunk access charge shall be one thousand four
hundred dollars ($1,400.00) per gross acre of land, which is subdivided or connected to the
water system.
Section 3. 9-1-2-2 Sanitary Sewer Trunk Access Charge: The City hereby modifies Albertville
City Code Section 9-1-2-2 Paragraph D to read as follows:
D. Amount Of Charge: The sanitary sewer trunk access charge shall be one thousand six hundred
dollars ($1,600.00) per gross acre of land, which is subdivided or connected to the sewer
system.
Section 4. 9-5-4 Storm Sewer Trunk Access Charge: The City hereby modifies Albertville City
Code Section 9-5-4 Paragraph B to read as follows:
B. Charge Established: No person shall, directly or indirectly, discharge, drain, runoff, place or
deposit, or permit the discharging, draining, running off, placing or depositing of storm or
surface waters from his parcel of land on which new construction is to be erected into the
municipal storm sewer system, including mains, holding areas and ponds, and other
appurtenances and related facilities used for the collection and disposal of storm water or
surface water, without first paying a storm water utility connection charge (the short title of
such connection charge shall be "SWCON") at the time the building permit is issued. The
amount of the SWCON shall, for each parcel of land subject thereto, be calculated as
follows:
1. Single Family Residential new construction: $500.00 per unit.
2. Multiple Family Residential new construction: $400.00 per unit.
111
3. All other properties new construction: $1,500.00 per gross acre.
.
Section 5. 10-1-3 Improvements or Escrow for New Residential Construction: The City
hereby modifies Albertville City Code Section 10-1-3 Paragraph E to read as follows:
E. Fee Amounts:
1. Fees are as follows:
Escrow fees:
Fee per tree
Fee for sod
Fee for administration of escrow
$250.00
$2,500.00
$100.00
Additional fees on building permit or as assigned:
Review fee, engineer does survey
Review fee, engineer reviews survey
Second review as built survey review
Reinspection fee
Resurvey fee
Landscape reinspection fee
$275.00
$150.00
$100.00
$50.00
$200.00
$25.00
.
2. Fees to be escrowed are fees for sod, trees and administration of escrow.
3. Compliance fees and reinspection fees are due with the permit.
Section 6. 4-1-6: Liquor License Fees: The City hereby modifies Albertville City Code Section
4-1-6 Paragraph A to read as follows:
A. Fees Established: The annual fees for liquor licenses shall be as follows:
1. Intoxicating liquor on sale license: Three thousand three hundred dollars ($3,300.00).
2. Temporary intoxicating liquor on sale license: Two hundred twenty dollars ($220.00) per
day.
3.3.2 percent malt liquor on sale license: One hundred dollars ($100.00).
4. Temporary 3.2 percent malt liquor on sale license: Ten dollars ($10.00) per day.
5. Special Sunday intoxicating liquor on sale license: Two hundred twenty dollars ($220.00). .
112
.
.
.
6. Intoxicating liquor off sale license: Two hundred twenty dollars ($220.00) if the license
holder does not have a concurrent on sale intoxicating liquor license; no additional fee for an
intoxicating liquor off sale license if the license holder has a concurrent on sale intoxicating
liquor license.
7.3.2 percent malt liquor off sale license: One hundred dollars ($100.00).
8. On sale wine license: One hundred ten dollars ($110.00).
Section 7. 11-2-7: Fees, Charges and Expenses. The City hereby modifies Albertville City
Code Section 11-2-7 Paragraph A.5. to read as follows:
5. Park dedication fees in lieu ofland:
Residential Development
(see subsection 11-7-8-2B of this Title)
$2,650 per residential unit
Commercial development
(see subsection 11-7-8-2C of this title)
$7,500 per acre subdivided
Industrial development
$2,500 per acre subdivided
(see subsection 11-7-8-2C of this title)
Section 8. 11-2-7: Fees, Charges and Expenses. The City hereby modifies Albertville City
Code Section 11-2-7 Paragraph A. 7. to read as follows:
7. Administrative fee: Prior to the release of a final plat, the applicant shall pay an
administrative fee equal to four percent (4%) of the cost of all municipal improvements
installed in or on the plat as required by this title. Municipal improvements shall include
streets, curb, gutter, sidewalk, sanitary sewer, storm sewer, water main, storm water ponding
and other such items, which will be dedicated to the city after their installation. This
administrative fee shall be in addition to out of pocket costs incurred by the city such as
engineering, planning and attorney fees. The city may, from time to time by resolution,
change the amount of the administrative fee set out herein.
Section 9. 10-2-3: PERMITS AND FEES. The City hereby modifies Albertville City Code
Section 10-2-3 Paragraphs B.9., B.12., B.13., and B.14 to read as follows:
9. Mechanical (new residence)
$150.00
12. Fireplace (existing residence)
$25.00
113
13. Plumbing (existing residence)
$25.00
14. Mechanical (existing residence)
$25.00
Section 10. Separability. It is hereby declared to be the intention that the several provisions of this
ordinance are separable in accordance with the following: if any court of competent jurisdiction
shall adjudge any provision of this ordinance to be invalid, such judgment shall not affect any other
provisions of this ordinance not specifically included in said judgment.
Section 11. Effective Date. This ordinance shall take effect from and after its passage and
publication.
PASSED by the City Council of the City of Albertville this 5th day of December, 2005.
CITY OF ALBERTVILLE
Don Peterson, Mayor
Bridget Miller, City Clerk
114
.
.
.
~
· ~~~t!!ill€
MEMORANDUM
Date: November 30, 2005
To: City Council
From: Larry R. Kruse, City Administrator
Re: General Update
1. ARENA: Walls are up and the roof will be installed the first week of December. The
Contractor's goal is to achieve substantial completion by year-end. Enclosed in your packet
is the Architect's report for your review. Things are going well!
.
2. CITY HALL: Contracts have been signed, the garages removed and tree trunks grubbed out.
Staff is seeking a cost from Xcel to upgrade the street lighting along Main Avenue. A cost
estimate will be forthcoming.
3. KEN LINDSAY RETIREMENT: Ken has signed the Memorandum of Understanding
memorializing our exit agreement. Weare advertising and expect to get a significant amount
of interest in the position.
4. EULL CONCRETE PROPERTY: Staff continues to work with the developer and our TIF
consultant to structure a project for a 20,000 square foot office building. More information
will be forthcoming.
5. SPECIAL PRIMARY AND GENERAL ELECTION: Bridget Miller did a good job of
managing the special elections. Voter turnout was very low with 264 votes out of a total of
3253 eligible voters.
Del Hag 22
Amy Koch 164
John Deitering 78
Total 264
.
6. CITY OF OTSEGO INFORMATIONAL MEETING ON 1-94
The meeting is scheduled for 7:00 p.m., December 15th at Otsego City Hall. S.E.H. will be
putting together and presenting overview information and having a discussion about how we
115
arrived at where we are today. Following this meeting, attendees can view traffic modeling ._
in more detail if they wish.
7. EDINA DEVELOPMENT: Staffwill be presenting a settlement offer for Council
consideration on Monday. We will ask that the Council close the meeting to discuss a
possible settlement which staff negotiated.
8. ALBERTVILLE TRUTH IN TAXATION HEARING: The Truth-In-Taxation Public
Hearing is scheduled for Monday at 6:30 p.m. prior to the Council meeting. Please bring your
Proposed Property Tax Statements for 2006 as sent out by Wright County. My tax statement
showed a $2.7% increase in Albertville's levy and this includes a $25,000 increase in the
value of my home. Indications are that the City of Albertville shows a very modest increase
in light that we built the Public Works Building; are building a new City Hall, and includes a
$100,000 for the 1-94 project. I do not anticipate a significant number of residents attending.
As expected, the majority of any increases are the result of the School referendum. Call if
you have any questions.
116
.
.