2001-03-19 Municipal 2001 Indust Pk NW Improv.
Ms. Linda Goeb
City of Albertville
5975 Main Ave. N.E.
Albertville, MN 55301
Re: Municipal 2001 Industrial Park NW Improvements
Dear Ms. Goeb:
We have received a copy of the Feasibility Report for the above referenced project. As the
developers of the proposed planned unit development called Towne lakes we are in support
of the city authorizing this project with one request. The proposed sewer alignment through
the Vetch parcel (see attached) will impact the existing home and barn on the site. Although
we are purchasing the property the Vetch's wish to remain on the property for at least another
year and therefore we request that the city work with us and the Vetch's to revise the sewer
alignment to a mutually agreed upon alignment which will not impact the existing structures at
this time.
Should the city have reservations on authorizing all of the project proposed in the study we
would still request that at a minimum the city authorize construction of the lift station that is
located on our property. We are not opposed to installing the forcemain through our site
assuming we receive credit against our trunk utility assessments for this work.
Thank you for your consideration in this matter.
Sincerely
David Hempel
Project Manager
Cc Homer Tompkins
Pete Carlson, City Engineer (SEH)
EncL
CPDC Corporate Offices:
The Quadrant Building - 7100 Northland Circle - Suite 108 - Minneapolis, MN 55428
phone: (763)971-0477 - fax: (763)971-0576 - email: cpdc@schererbros.com