Loading...
2025-06-27 Storm Water Maintenance Agreement-RecordedDOCUMENT #: A1582316 08-01-2025 at 10:30 AM Certified filed and or recorded on above date TANYA WEST WRIGHT COUNTY RECORDER WRIGHT COUNTY, MN Pages: 8 Fee Amount: $46.00 By: MF This document has been electronically recorded. Return To: First American Title Insurance Company - NCS K (Reservedfor Recording Data) STORM WATER MAINTENANCE AGREEMENT This STORM WATER MAINTENANCE AGREEMENT ("Agreement") made this )l day of tip_ , 2025, by and between the CITY OF ALBERTVILLE, a Minnesota municipal corporation (hereinafter referred to as the(°City") and ALBERTVILLE, MN (LOT 1) LLC, an Illinois Limited Liability Company (hereinafter referred to as the "Developer InSite"). WHEREAS, Developer InSite is the fee owner of certain real property situated in the City of Albertville, County of Wright, State of Minnesota known as Lot 1, Block 1, of the Albertville Plaza Third Addition (the "Developer InSite Property"), according to the plat on file at the Wright County Recorder's Office, Wright County, Minnesota, which Developer InSite has obtained the approval of the City for the development thereof; and WHEREAS, the City has required that Developer InSite make provision for the construction, maintenance and repair of the Ponds (collectively "Stormwater Ponds") located within the boundaries of the Developer InSite Property and shown on the attached Exhibit A, as the same is described and depicted in those certain construction plans drawn by ADA Architects, P.C. dated June 25, 2024 and ISG dated May 14, 2024 which are approved and permitted by the City and on file with the City Clerk (the "Approved Plans and Specifications"). WHEREAS, the City and Developer InSite desire to set forth their understanding with respect to the construction, repair and maintenance of the Stormwater Ponds and the responsibility relating to the costs of the repair and maintenance of the Stormwater Ponds. NOW THEREFORE, in consideration of the foregoing facts and circumstances, and for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereto hereby agree as follows: 1. Construction and Maintenance of Stormwater Ponds. Subject to the terms and conditions of this Agreement, Developer InSite agrees to construct the Stormwater Ponds in the manner set forth in the Approved Plans and Specifications and repair and maintain, or cause the repair and maintenance of, the Stormwater Ponds at its sole cost and expense. Maintenance of the Stormwater Ponds shall mean (i) monthly inspections of the Stormwater Ponds and, if necessary, removal of all litter and debris, and replacement of mulch, vegetation, and eroded areas to ensure establishment of healthy functioning plant life therein; and (ii) an annual inspection, and certification, by a qualified individual or company acceptable to the City that the Stormwater Ponds are functioning in accordance with the Approved Plans and Specifications and have maintained the proper operation of the stormwater treatment as Stormwater Ponds in according to this Agreement and the City's ordinances and applicable state law. If, as a result of an inspection by a qualified individual or company acceptable to the City or City staff, it is determined that the Stormwater Ponds (1) have not been maintained in accordance with the terms of this Agreement and the City's ordinances and applicable state law; or (2) are not functioning as originally designed and intended in the Approved Plans and Specifications; or (3) are in need of repair, the Developer InSite agrees to restore, or cause the restoration of, the Stormwater Ponds so that they function as they were designed and intended in the Approved Plans and Specifications. Developer InSite further agrees that it will not use the Stormwater Ponds for snow storage and will inform its snow removal contractors of this provision of the Agreement. Developer InSite, or the occupant of the Developer InSite Property, shall be solely responsible for the repair and maintenance of the Stormwater Ponds located on the Developer InSite Property, including all costs to repair and maintain said Stormwater Ponds. 2. Developer InSite's Default. In the event of default by the Developer InSite as to any of the work to be performed by it hereunder, following at least thirty (30) days prior written notice and Developer InSite's failure to cure such default within such time -frame, except in an emergency as determined by the City, the City may, at its option, perform the work and Developer InSite shall within 30 days of receipt of an invoice and reasonable substantiation of such costs, reimburse the City for any reasonable out-of-pocket expense incurred by the City to cure such default. This Agreement is a license for the City to act when so authorized under this Agreement, and it shall not be necessary for the City to seek a Court order for permission to enter the Developer InSite Property for the performance of acts when so authorized under this Agreement. The City may, in addition to its other remedies, assess the reasonable out-of-pocket cost in whole or in part against the Developer InSite Property, certify the costs against the Developer InSite Property pursuant to Minn. Stat. 366.012, or take any other action authorized by law to collect such costs from Developer InSite or its successors and assigns, as applicable. 3. Terms and Conditions. This Agreement shall run with the land and shall be binding upon Developer InSite's successors and assigns with respect to the Developer InSite Property. The terms and conditions of this Agreement shall be binding upon, and shall insure to the benefit of, the parties hereto and their respective successors and assigns. IN WITNESS WHEREOF, the parties hereto have caused this document to be executed as of the day and year first above written. z CITY OF ALBERTVILLE BY. Jillian Hendrickson, Mayor Kris Luedke, City Clerk STATE OF MINNESOTA ) 5S. COUNTY OF WRIGHT 1 The foregoing instrument was acknowledged before me this . � day of 7 A P , 2025, by Jillian Hendrickson and by Kris Luedke, the Mayor and City Clerk, respectively, of the City of Albertville, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTA Y PUBLIC 1Cp MICHAEL C. COUR1 NOTARY PUBLIC s MINNESOTA MY Commission Expires Jan. 31. 20 ALBERTVILLE, MN (Lot 1) LLC, an Illinois limited liability company le, Larissa A. Addison,Manager STATE OF ILLINOIS ) ss. COUNTY OF DU PAGE } The foregoing instrument was acknowledged before me this a-) day of 202 S by Larissa A. Addison, a Manager of ALBERTVILLE, MN (Lot 1) LLC, an Illinois limited liability company, on behalf of such limited liability company. This Instrument Drafted by: Mike Couri Couri & Ruppe Law Office P.O. Box 369 St. Michael, MN 55376 763-497-1930 NOTAR PUBLIC OFFICIAL SEAL_ EL17ABETH ANN IRVING Notary Public, State of iilinois commission: No. 190021 Icy Commission Expires November 17, 2028 4 EXHIBIT "A" Approved Grading Plan and Enumeration of All Approved Plans and Specifications See attached. ok i i P �', �v 9q z m '=A ;10 xR cs _ — 6 rrn i i P �', �v 9q z m '=A ;10 xR cs _ — 6 rrn o a a v s o um a n HIP o 3. A m o a calr=pHmm =p ; ® 9 A� Fv 5� �C m ADA Architects, Inc. A-0.l EGRESSIEVACUATION PLAN 6/25/2024 1/29/2025 ADA Architects, Inc SITE PLAN 625/2024Fi 8l1212024 ADA Architects, Inc. AS-L 1 PLAYGROUND PLAN 6/25/2024 8/12/2024 ADA Architects, Inc, AS-12 PLAYGROUNO DETAILS AND SECTIONS 612512024 8112120.24 ADA Architects, Inc, AS-1.3 PLAYGROUND DETAILS AND SECTIONS 6/25/2024 9/1212024 Architects, Inc. _,. A-1.0 FI00RPLAN; 6/2S/2024 i0114/2024 ADA Architects, Inc. A-l.l FLOOR FINISH PLAN 6/25/2024 I129/2025 ADA Architects, Inc. A-12 CASEWORK AND EQUIPMENT.PLAN 6l2SI202A 90/1412024 ADA Architects, Inc. A-1.3 ENLARGED PLANS AND CASEWORK & EQUIPMENT 6/25/2024 1/29/2025 SCHEDULES ADAArchttects`Inc A-1.4 ENLARGED PLANS 6/25/2024 701i4/2034 ADA Architects, Inc. A 2.0 REFLECTED CEILING PLAN 6/25/2024 9/12/2024 ADA Architects; Inc. A 10 ROOFPLAN : .....:: fi1512024 , 8/12/2024 ADA Architects, Inc. A 1.0 EXTERIOR ELEVATIONS 6/25/2024 8/12/2024 ADA Architects, Inc. A-5.0 G BUILDINSECTIONS 6/2S/2024 _. 9/12/2024 .; ADA Architects, Inc. A-S.I WALL SECTIONS 6/21/2024 9/12/2024 ADA.Architecis,Ipc, A=5.2 WALL:SECTIONS __.. 6/25/2024 .;} s. 8/12/2024 ),.'. ADA Architects, Inc. A-5.3 WALL SECTIONS 6/25/2024 9/12/2024 ADAArehitects,7nc. k6ff INTERIORDETALS 6125/2024 8112/2024....;f. ADA Architects, Inc. A-7.0 INTERIOR ELEVATION DETAILS 6/25/2024 8/1212024 ADA Architects, Inc A`:7.1 TNTEMOR.ELEVATIONS 9:. 6/25/2024 9/1212024 ADA Architects, Inc. A-7.2 INTERIOR ELEVATIONS 625/2024 9/12/2024 ADA Architects, Inc. A-7.3 INTERIOR ELEVATIONS 6125/2024 81I2/2024 ADA Architects, Inc. A-8.0 DOOR AND WINDOW SCHEDULES 6125/2024 10/14/2024 :ADA Architects, Inc- A'-9 0 SPECIFICATIONS 6i1512024 9/12/2024 ADA Architects, Inc. A-9, I SPECIFICATIONS 6/25/2024 8/12/2024 ADA Architects, Inc. A-9.2 SPECIFICATIONS 6/25/2024 8/12/2024 ADA Architects, Inc. A-9.3 SPECIFICATIONS 6/25/2024 8/12/2024 ADA Architects, Inc A=9.A SPECIFICATIONS. 6/25/2024 8/12/2024 ADA Architects, Inc. A-9.5 SPECIFICATIONS 6/25/2024 8/12/2024 ADA Arehitects, Inc. A .fi SPECIFICATIONS 6//25/2024 9/1212024 ADA Architects, Inc. A-9,7 SPECIFICATIONS 6125/2024 8/12/2024 ADA Architects, Inc A-9.8 _...,. SPECIFICATIONS 6/25/2024 8/12/2024 ADA Architects, Inc. A-99 SPECIFICATIONS 6/25/2024 9/12/2024 ADA Architects; Inc. A-9,10 SPECIFICATIONS 5/25/2024 8/12/2024 ADA Architects, Inc. A-9.11 SPECIFICATIONS 6/25/2024 8/12/2024 ADAArchitects,.Inc- A:9.12 SPECIFICATIONS 6/25/2024 V1212024 ADA Architects, Inc, Silo GENERAL NOTES & SPECIFICATIONS 6/25/2024 8/12/2024 ADAArchitects,Inc. S1.1 GENERAL NOTES & SPECIFICATIONS 6125/2024 ...... 8/1212024 ADA Architects, Inc. S2.0 FOUNDATION PLAN 6/25/2024 8/12/2024 ADA Aichitects; Inc $3:0 ROOF FRAMING PLAN :6225/2024 8/.12/2024 . ADA Architects, Inc. S4.0 TYPICAL FOUNDATION ➢ETAILS AND SECTIONS 6/25/2024 8A 2/2024 ADAArohttecu,Ing, _ . 55.0 TifPICALDETAILS 6/25/2024 8/12/2024 ADA Architects, Inc. S5.1 SHEARWALL DETAILS AND TRUSS PROFILES 6/25/2024 8/12/2024 ADA Architects„Inc. S6.fl SECTIONS C15/2024 8/12/2024 ADA Architects, Inc, S6.1 SECTIONS 6/25/2024 8/12/2024 ADA Architects, 46. M-03 h C14ANICAL SPECIFICATIONS '; 6/25/2024 . - 811.212024 ADA Architects, Inc. M-0.2 MECHANICAL SCHEDULES 6/25/2024 8/12/2024 ADA Architects,: Inc. M-03 MECHANICALDETAIIS 6/25/2024 8/12/2024 ADA Architects, Inc. M-DA MECHANICAL COMPLIANCE 6/25/2024 8/12/2024 ADAArchtteats,:Iuo. M=1.0 MECIIAIVICALPLAN 6/25l2024 8112/2024 _ .. ADA Architects, Inc. P-0A PLUMBING LEGENDS AND NOTES 6/25/2024 1/8/2025 ADA Architects, Inc. P-0.2 PiiINiB1NG SCHEDULES NM)2024 1/8/2023 ADA Architects, Inc. P-03 PLUMBINGDETAILS 6/25/2024 11/19/2024 ADA Arclitects, Inc. . P-0.4 PLU..MBING.DETAILS 6/25/2024 IM2025 ADA Architects, Inc. P-0.5 PLUMBING SPECIFICATIONS 612512024 1/8/2025 ADA Architects, Inc. P-1.1 SANITARYAVENT PLPLAN 6J25I2024 II812025 ADA Architects, Inc. P-L2 DOMESTIC WATER PLUMBING PLAN 6/25/2024 1/8/2025 ADA Architects, Inc. P-I.3 ROOF PLUMBING PLAN 6/25/2024 10/1411024 ADA Architects, Inc. P-4.0 SANITARY At VENT RISER DIAGRAM 6/25/2024 1/&2025 ADA Architects, Inc. P.4.1 ➢OMESTIC 4VATERItISER DIAGRAM. 6f151i024 112912025 ADA Architects, Inc. PA.2 STORM RISER DIAGRAM 625/2024 10/14/2024 ADA Architects, Inc. FP-0.1 FiRRE PROTECTION LEGENDS AND NOTES:;' . .. 6725/2024 . ' 8/12/2024 ADA Architects, Inc. FP-0.2 FIRE PROTECTION DETAILS 6/25/2024 811212024 ADA Architects; Inc. rc FP-1.0. FiitE PROTECTION PI:AN , ..... 1>J2512024 81i212024 ADA Architects, Inc. E0, I ELECTRICAL SPECIFICATIONS W25121124 8/12/2024 ADA Architects, Inc. E0.2 _ ELECTRICAL: SITE PLAN b(2S/2024 11/19.l2024 ADA Architects, Inc. E1.0 LIGHTING PLAN 6/25/2024 1/29/2025 ADA Architects; Inc. EIA POWERPLAN. 6/25/2024 I2+11f2024 ADA Architects, Inc. E1.2 COMMUNICATIONS PLAN 6/25/2024 8/12/2024 Am.Architects; Inc, f EE.3 MECHANICAL PLAN 6I2S/2024 8/12/2024 ADA Architects, Inc. F,2.0 FIRE ALARM ➢ESIGN CRITERIA 6/25/2024 8/12/2024