Loading...
1997-01-30 WSWCD Review .RIGHT SOIL AND WATER .SERVATION DISTRICT 306e Brighton Avenue Buffalo, Minnesota 55313 Telephone (612) 682-1933 682-1970 January 30, 1997 ., - Gary Elftmann u.s. Corps of Engineers St. Paul District 190 East Fifth Street Saint Paul, MN 55101 Dear Mr. Elftmann, The following comments are in reference to Parkside Fourth Addition proposed in Section 2, T.120N, R.24W in Wright County. The applicant is proposing considerable wetland fill to be mitigated by the construction of': wetland/stormwater ponds. Although we are not strictly opposed to stormwater ponds being used for mitigation it does draw considerable attention. Further the submitted material showing alternative plans to address the sequencing requirements is very difficult to understand. For this reasons we feel that questions pertaining to sequencing requirements of both our respective jurisdictions need to be better addressed. We are suggesting that a nation wide permit not be issued on this project and that Corp work with our office with authorities under the state Wetland Conservation act and the City of Albertville to f~rthei7 review this proj ect. In this way we feel we can coordinate our efforts which will better serve the applicant while meeting our respective responsibilities under the law. -~~~~ Kerry Saxton, Office Manager cc Garrison Hale, City Administrator Albertville Michael Wepurg, Section Chief Corp of Engineers . . PARKS IDE 4th ADDITION ALBERTVILLE, MINNESOTA WETLAND IMPACT AND REPLACEMENT SUMMARY Wetland delineation for this project was performed by Eco Systems Engineering, Inc. Wetland mitigation proposed complies with the 1996 amendments to the Wetland Conservation Act. Data on this sheet corresponds to the Wetland Mitigation plan sheet 1 of 1. Impacted Wetlands: Type II Wetland Diminimus Exemption Total Impact 26,828 sf 2,000 sf 24,828 sf Replacement Wetland by Excavation: (See Wetland Mitigation Plan) 4,237 sf 7,265 sf 24,122 sf 35,624 sf Replacement wetland by upland/buffer area conservation easement: (See Wetland Mitigation Plan) 6,265 sf 2,777 sf 1,860 sf 4,055 sf 4 ,418 sf 19,375 sf SUMMARY: Required Replacement (24828 @ 2:1) 49,656 sf Total Replacement (35624 + 19375) 54,999 sf Resulting public value credits remaining (Total replacement less required replacement) = 5,343 sf