Loading...
1993-08-26 Utility Permit Special Provisions WRIGHT COUNTY HIGHWAY DEPARTMENT PERMI T NO. 193-/~~ , UTILITY PERMIT SPECIAL PROVISIONS On May 8, 1990, the Utility Permit Policy. special provisions set utility permit. tJ [] Wright County Board of Commissioners adopted a The provisions of that policy along with the forth here shall be in effect on the attached 36 " ( + 6") Depth on Longitudinal Installation. 48" (+ 6") Depth or, P'.lblic Rc.ad Crossing. [J Longitudinal Placement to be (+ -) l' from Specified Location. [] [/ r/ [/ [J [~ [/ Guy Wires to be Placed Feet from Centerline. Return Completion Form within 1 Week of Restoration. Call 682-7391 to Notify County Prior to Start of Work. Traffic Control for LANE CLOSURE in accordance with the MMUTCD Append i x "B" Low Speed 0-35 MPH, Layc.ut 2, Pa~e 2-3. Traffic Control for LANE CLOSURE in accordance with the MMUTCD Appendix "B" High Speed 40-55 MPH, Layout 12, Page 3-2. Submit Traffic Control Plan to County Permit Office 48 Hours Prior to Start of Work. Open Cutting -(Where such Work is Allowed) BITUMINOUS RESTORATION SHALL BE COMPLETED WITHIN 2 DAYS After Uitilty Work has been Completed and Excavation has been Backfilled. Open Cutting SHALL NOT BE ALLOWED Before May 1 or After November 15 of the Current Year. When Removing the Existing Bituminous it SnaIl Be Sawcut to Neat Lines. [~ SPECIAL CONCERNS: ?~o t'SiL u S ~ 6.c: 4'5dvr:=:- "7.e,.,~,....-c c-=-v- ?)f? d..... .s . 'XO"f<i<-V7 :' S ~.-e.~ C'c:.-~~ u-s, rv (... ,q /5 c:. ~(..:~ <:(J /3~ocr--" Date 8' /,J.(, /"}...3 Si gned ;:, c:::-.