1993-08-26 Utility Permit Special Provisions
WRIGHT COUNTY HIGHWAY DEPARTMENT
PERMI T NO.
193-/~~ ,
UTILITY PERMIT SPECIAL PROVISIONS
On May 8, 1990, the
Utility Permit Policy.
special provisions set
utility permit.
tJ
[]
Wright County Board of Commissioners adopted a
The provisions of that policy along with the
forth here shall be in effect on the attached
36 " ( +
6") Depth on Longitudinal Installation.
48" (+
6") Depth or, P'.lblic Rc.ad Crossing.
[J Longitudinal Placement to be (+ -) l' from Specified Location.
[]
[/
r/
[/
[J
[~
[/
Guy Wires to be Placed
Feet from Centerline.
Return Completion Form within 1 Week of Restoration.
Call 682-7391 to Notify County Prior to Start of Work.
Traffic Control for LANE CLOSURE in accordance with the MMUTCD
Append i x "B" Low Speed 0-35 MPH, Layc.ut 2, Pa~e 2-3.
Traffic Control for LANE CLOSURE in accordance with the MMUTCD
Appendix "B" High Speed 40-55 MPH, Layout 12, Page 3-2.
Submit Traffic Control Plan to County Permit Office 48 Hours
Prior to Start of Work.
Open Cutting -(Where such Work is Allowed) BITUMINOUS RESTORATION
SHALL BE COMPLETED WITHIN 2 DAYS After Uitilty Work has been
Completed and Excavation has been Backfilled. Open Cutting SHALL
NOT BE ALLOWED Before May 1 or After November 15 of the Current
Year. When Removing the Existing Bituminous it SnaIl Be Sawcut to
Neat Lines.
[~ SPECIAL CONCERNS: ?~o t'SiL u S ~ 6.c: 4'5dvr:=:-
"7.e,.,~,....-c c-=-v- ?)f? d..... .s .
'XO"f<i<-V7 :' S ~.-e.~ C'c:.-~~ u-s, rv (... ,q /5 c:. ~(..:~ <:(J /3~ocr--"
Date
8' /,J.(, /"}...3
Si gned ;:, c:::-.