1993-06-23 Break down of Escrow Items
MEYER-ROHLIN, INC.
ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612- 682-1781
June 23, 1993
Mike Couri
Radzwill Law Office
PO Box 369
st. Michael, MN 55376
RE: Hardwood Pond Second Addition
Dear Mike:
The following is a break-down of the escrow item costs attributed to
the above-referenced project.
On- and Off-Site Improvements
Based upon the 27-1ot addition:
a) Boulevard improvements
topsoil and sodding
front lawn trees
hard surface driveway and base
b) Grading control
$200.00/1ot
30.00/1ot
200.00/1ot
50.00/1ot
$480.00 x 27 lots = $12,960.00
c) Street signs )
d) Street cleanup)
lump sum for the development
2,000.00
$14,960.00
use $15,000
If you have any questions, please contact me.
Sincerely,
cc: City of Albertville
File E-9301-B
Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor