Loading...
1993-06-23 Break down of Escrow Items MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612- 682-1781 June 23, 1993 Mike Couri Radzwill Law Office PO Box 369 st. Michael, MN 55376 RE: Hardwood Pond Second Addition Dear Mike: The following is a break-down of the escrow item costs attributed to the above-referenced project. On- and Off-Site Improvements Based upon the 27-1ot addition: a) Boulevard improvements topsoil and sodding front lawn trees hard surface driveway and base b) Grading control $200.00/1ot 30.00/1ot 200.00/1ot 50.00/1ot $480.00 x 27 lots = $12,960.00 c) Street signs ) d) Street cleanup) lump sum for the development 2,000.00 $14,960.00 use $15,000 If you have any questions, please contact me. Sincerely, cc: City of Albertville File E-9301-B Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor