1993-11-12 Recommendation for 1994 for Completion
MEYER-ROHLIN, INC.
ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612- 682-1781
November 12, 1993
City of Albertville
c/o Linda Houghton, Clerk
Box 131
Albertville, MN 55301
RE: 1993-1 Improvement Project
utilities and street Improvements
Hardwood Pond Second Addition
Dear Linda;
We have been keeping a close eye on the construction at Hardwood
Pond to determine if the roadway will be sufficiently stable for
us to place Class 5 aggregate and concrete curb and gutter yet
this fall. In reviewing the subgrade materials at this time, we
find that it is very wet and that it will be too unstable for us
to place the gravel and curb and gutter. Without good drying
weather, we foresee that we will be unable to meet this
requirement and would recommend that the gravel and curb and
gutter be placed in 1994, after the subgrade is properly prepared.
If you should have any questions, please feel free to contact me.
Sincerely,
MEYER-ROHLIN, INC.
~~t~
Norman Gartner
Professional Engineer
cc: E-930l-B
Mr. Bob Braun
Annandale Contracting, Inc.
Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor