Loading...
1993-11-12 Recommendation for 1994 for Completion MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612- 682-1781 November 12, 1993 City of Albertville c/o Linda Houghton, Clerk Box 131 Albertville, MN 55301 RE: 1993-1 Improvement Project utilities and street Improvements Hardwood Pond Second Addition Dear Linda; We have been keeping a close eye on the construction at Hardwood Pond to determine if the roadway will be sufficiently stable for us to place Class 5 aggregate and concrete curb and gutter yet this fall. In reviewing the subgrade materials at this time, we find that it is very wet and that it will be too unstable for us to place the gravel and curb and gutter. Without good drying weather, we foresee that we will be unable to meet this requirement and would recommend that the gravel and curb and gutter be placed in 1994, after the subgrade is properly prepared. If you should have any questions, please feel free to contact me. Sincerely, MEYER-ROHLIN, INC. ~~t~ Norman Gartner Professional Engineer cc: E-930l-B Mr. Bob Braun Annandale Contracting, Inc. Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor