Loading...
1993-06-09 Engineering Review MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612- 682-1781 June 9. 1993 Mr. John Oliver John Oliver & Associates 580 Dodge Avenue Elk River. MN 55330 Re: Hardwood Ponds 2nd Addition Albertville. Minnesota Dear John: At the direction of the Albertville City Council. we are preparing a water. sanitary sewer. storm sewer and street construction feasibility report for council action at the June 21, 1993, meeting. We will need a revised preliminary plat and grading/drainage plan incorporating the changes outl ined in our memo of April 22, 1993, to the Planning Commission (a copy is enclosed). Also, as the lots in the wooded areas will not be graded at this time, I would suggest that a more explicit drainage pattern. together with rear lot line elevations, be shown to be more identifiable to the individual home builder when grading each site. The City Ordinance limits the minimum street grades to 0.5%. You are showing some grades at 0.44%, which should oe revised. Building sites shall be a minimum of Ii feet above cur13 elevations, which may be impacted by the revised street grades. These should be checked and corrected as necessary on the revised preliminary plat information. If you have any questions. please do not hesitate to contact me. Yours cc: Bob Braun City of Albertville ~ File E-930l-B__ Thore P. Meyer, Professional Engineer Robert Roh/in, Licensed Land Surveyor