1994-08-08 Drainage Plan Revised Drainage Plan
MEMORANDUM
o ST. PA UL, MN
o MINNEAPOLIS, MN
IXI ST. CLOUD, MN 0 CHIPPEWA FALLS, WI 0 MADISON, WI
FROM:
illtl~..t
City Administrator
Albertville, MN
Peter J. Carlson, P.E. 010
City Engineer 1J
TO:
DATE:
August 8, 1994
RE:
Drainage Plan
Lot 5, Block 1, Hardwood Pond 2nd Addition
SEH No. A-ALBEV 9501.00
On Friday August 5, 1994, I met with Mr. Robert Braun, the Owner/Developer of Hardwood
Pond 2nd Addition. Mr. Braun provided me with the overall preliminary grading and drainage
plan for the 2nd Addition, as prepared by John Oliver & Associates, Inc. This plan indicated
the drainage for Lot 5, Block 1 is split, with approximately half of the run-off draining to the
street and the other half draining to the rear of the lot.
The first drainage plan, for Lot 5, Block 1, submitted for review is in accordance with the
overall grading plan and is approved. A revised drainage plan, for Lot 5, Block 1, showing all
the lot drainage flowing to the street was also submitted. This drainage plan is not approved.