1994-08-22 As-Built Drawings Approval
MS, ~
lMltMIGIIIIS
CiVil ENGiNEERING
ENViRONMENTAl
MUNICIPAl
PLANNING
sr,'UC7lIRAI
SUkVEYING
TRAffiC
TRANSPORfAflON
1326 Energy Pork Drive
St. Paul, MN 55108
612-644-4389
Fox: 612-644-9446
9800 SheIord Parkway
Minneapolis, MN 55441
612-546-0432
Fox: 612-544-6398
August 22, 1994
File: 745..()2()..11
Honorable Chairperson and Board
Joint Powers Water Board
P.o. Box 10
11100 - 50th Street NE
Albertville, MN 55301
RE: HARDWOOD POND 2ND ADDITION
Dear Board Members:
We reviewed the "as-built" drawings for the Hardwood Pond 2nd Addition in Albertville.
The "as-built" drawings and tie cards are in accordance with the Board's standard
requirements. This development also has passing pressure and bacteriological tests.
This development has two valve boxes that will need to be raised with the final fift of
bituminous pavement.
,
We recommend the Board approve the as-built drawings.
Sincerely,
MSA, CONSULTING ENGINEERS
;f~ ,djl/~
Brian D. Miller, P .E.
BDM:tw
020-2207.au,