Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1993-12-29 Prof Services Rendered
. . MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 1111 Hwy. 25N., Buffalo, Minn.55313 Phone 612-682-1781 December 29, 1993 City of Albertville c/o Linda Houghton, Clerk Box 131 Albertville, MN 55301 FOR PROFESSIONAL SERVICES RENDERED: RE: 1993-1 Improvement Project Hardwood Ponds 2nd Addition Staking and inspection charges, As-built information Project start through December 17, 1993: September, 1993 Engineer I: 2.25 hrs @ 24.04 x 2.75 = Engineer II: 1.5 hrs @ 22.71 x 2.75 = Engineer III: 8.5 hrs @ 15.87 x 2.75 = 2-man crew: 9 hrs @ 19.70 x 2.75 = December, 1993 Engineer I: 1 hr @ 24.04 x 2.75 = Engineer II: 1.75 hrs @ 15.87 x 2.75 = 148.75 93.68 370.96 487.58 $1,100.97 214.86 265.42 = 818.30 365.68 134.75 $1,799.01 231.39 124.91 = 632.82 558.25 460.49 $2,007.86 66.11 76.37 October, 1993 Engineer I: 3.25 hrs @ 24.04 x 2.75 = Engineer II: 4.25 hrs @ 22.71 x 2.75 = Engineer III: 18.75 hrs @ 15.87 x 2.75 2-man crew: 6.75 hrs @ 19.70 x 2.75 = Inspector: 3.5 hrs @ 14.00 x 2.75 = November, 1993 Engineer I: 3.5 hrs @ 24.04 x 2.75 = Engineer II; 2 hrs @ 22.71 x 2.75 = Engineer III: 14.5 hrs @ 15.87 x 2.75 Inspector: 14.5 hrs @ 14.00 x 2.75 = 2-man crew: 8.5 hrs @ 19.70 x 2.75 = $ 142.48 TOTAL TO DATE........ $~~~~~~~~ cc: E-9301-B Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor