1994-11-14 Prof Services Rendered
.
.
MEYER-ROHLIN, INC.
ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn. 55313 Phone 612 - 682-1781
City of Albertville
c/o Linda Houghton, Clerk
Box 131
Albertville, MN 55301
PROFESSIONAL SERVICES RENDERED:
Re: Hardwood Ponds Second Addition
Feasibility Report
Engineering Staff Time:
- Engineer I: 6.5 hrs @ 24.04 x 2.75 =
$429.72
- Draftsman: 3.75 hrs @ 18.50 x 2.75 =
190.78
TOTAL TO DATE........... .$~~~~~~
E-9301-B
Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor
June 30, 1993
.~.
.,
MEYER-ROHLIN, INC.
ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612- 682-1781
City of Albertville
c/o Linda Houghton, Clerk
Box 131
Albertville, MN 55301
RE: 1993-1 utilities & street Improvement Project
Hardwood Pond 2nd Addition
Partial Payment Request No.4 (Final)
Honorable Mayor and City Council:
November 14, 1994
The contractor for the above-referenced project has requested partial
payment for work completed to date. Below you shall find the
quantities for the work performed.
"
.~ page 2
9. Raise manhole casting 6 6 each $ 200.00 $ 1,200.00
10. Density tests 80 27 each $ 30.00 $ 8l0.00
l1. Crushed rock 30 30 c.y. $ ll.OO $ 330.00
TOTAL BID "A" $~~4:~~~~~~
ALTERNATE BID "B" - WATERMAIN
1. 6" PVC, C-900 l440 1440 1. f. $ 10.l3 $l4,587.20
2. 6" llio DIP bend 2 2 each $ 85.00 $ l70.00
3. 6" 900 DIP bend 1 1 each $ 90.00 $ 90.00
4. 8" x 8" x 6"
DIP Tee 1 1 each $ 165.00 $ l65.00
5. 6" x 6" x 6"
DIP tee 4 4 each $ l25.00 $ 500.00
6. 8" sleeve 1 1 each $ 85.00 $ 85.00
7. Hydrants 4 4 each $l175.00 $ 4,700.00
8. 6" resilient seat gate
valve, valve box
and riser 6 6 each $ 351.00 $ 2,106.00
9. Water service
connection 27 27 each $ lOO.OO $ 2,700.00
lO. 1" copper service
pipe l3l5 l270 1. f. $ 6.22 $ 7,899.40
l1. Bacteriological test 3 1 each $ 65.00 $ 65.00
l2. Density tests 80 2l each $ 30.00 $ 630.00
l3. Crushed rock lO 10 c. y. $ 11. 00 $ llO.OO
l4. Raise gate valve 2 2 each $ l50.00 $ 300.00
TOTAL ALTERNATE BID liB" $~~4:~~Z~~~
BID "C" STORM SEWER
l. l2" Rep, CL. III l70 l70 1.f. $ l7.00 $ 2,890.00
c
'+.,
.~
2. l5" RCP, eL. III 345 344 1.f. $ l8.00 $ 6,l92.00
3. l8" RCP, eL. III 413 416 1.f. $ 20.00 $ 8,320.00
4. Catchbasin, 30" dia.
(CBl) 1 1 each $ 700.00 $ 700.00
5. eatchbasin, 48" dia.
(eB7, eB8) 2 2 each $ 950.00 $ l,900.00
6. Catchbasin 27" dia.
(CB4, CB6, CB9) 3 3 each $ 775.00 $ 2,325.00
7. Catchbasin, Special
(CB2, eB3, CB5) 3 3 each $ 825.00 $ 2,475.00
8 . l8" Rep flared end section
w/galvanized trash
guard 2 2 each $ 585.00 $ l,l70.00
9. Remove existing CB
salvage casting,
remove l8" RCP lOO% lOO% 1. s. $ 210.00 $ 2l0.00
lO. Random rip-rap
elass III 3.6 3.6 c.y. $ 55.00 $ 198.00
l1. Filter blanket 1.8 0 c.y. $ 8.00 $ 0.00
l2. elearing & grubbing lOO% lOO% 1. s. $2000.00 $ 2,000.00
l3. Pond grading lOO% lOO% 1. s. $l200.00 $ l,200.00
l4. Density tests 20 2 each $ 30.00 $ 60.00
l5. Crushed rock lO lO c.y. $ ll.OO $ llO.OO
TOTAL BID "C" $~~4:Z~~~~~
BID "D" STREET
l. Subgrade preparation 7150 7065 s.y. $ .50 $ 3,532.50
2. Aggregate base
placed, Class 5 2375 2375 c.y. $ lO.35 $24,58l.25
3. Remove concrete curb
and gutter 66 66 l.f. $ 2.00 $ l32.00
4. Type 3l base
eourse mixture 9350 908l sy-in $ 1.48 $l3,439.88
page 4
5. Type 4l wear
course mixture 9350 908l sy-in $ l.48 $l3,439.88
6. Surmountable concrete
curb & gutter 2630 2910 1.f. $ 5.35 $l5,568.50
7. Density test l5 0 each $ 40.00 $ 0.00
EXTRA WORK
Sidewalk repair
Seed & Mulch
TOTAL BID "D" $Z~4:~~~~~~
7150 7065 s.y. $ .85 $ 6,005.25
600 630 c.y. $ lO.35 $ 6,520.50
TOTAL CHANGE ORDER NO. 1 $~~4:~~~~Z~
0 64 s.f. $ 3.l6 $ 202.24
0 1 1. s. $ l,lOO.OO $ l,lOO.OO
TOTAL EXTRA WORK $ =~4:~~~~~~=
CHANGE ORDER NO. 1
Geotextile fabric
Aggregate base,
placed, Class 5
TOTAL COMPLETED WORK
LESS PREVIOUS PAYMENTS
$189,325.60
$l62,338.04
PARTIAL PAYMENT #4 (Final)
$ 26,987.56
We therefore recommend Partial Payment No. 4 (Final) be made to
Annandale Contracting, Inc., 6646 eo. Rd. 5 NW, Annandale, MN 55302,
in the amount of $26,987.56. Upon payment of this final request, we
recommend the city accept the project and initiate the two (2) year
warranty period. The two-year warranty will be covered by the
contractor's Performance Bond which shall be kept effective and in
force for two (2) years after acceptance by the City of Albertville.
If you have any questions, please don't hesitate to contact me.