Loading...
2026-04-27 Joint Power Water Board Agenda Joint Powers Water Board AGENDA Regular Meeting of April 27, 2026 Joint Powers WTP 11100 50th Street NE Albertville, MN 6:00 PM Chairperson Engineer Mike Amery, City of Hanover Chris Larson, SEH Board Members Operations Rob Olson, City of Albertville John Seifert, Veolia Gretchen Barrett, City of Hanover Ruth Klick, Veolia Joe Hagerty, City of St Michael Dustin Carlson, Veolia Zach Schoen, City of St Michael Bob Zagorski, City of Albertville 1. Call to Order / Roll Call 2. Approve Agenda 3. Consent Agenda 3.1. Approval of Previous Regular Board Meeting Minutes – Page 2 3.2. Approval of List of Claims – Page 3 3.3. Approval of Monthly Operations Report – Page 4 3.4. Approval of Mag Meter Replacement Memorandum of Understanding - Page 3.5. Approval of 2025 Reconciliation Limit Budget (Invoice Credit) - Page 4. General Business 4.1. Dan Zachman Insurance Renewal LMCIT - Page 4.2. Website Upgrade - Page 5. Engineer 5.1. Review Letter to Wright County Highway Department on County Road 18 Reconstruct - Page 6. Operations - None 7. Other Business / Announcements / Correspondence 7.1. Received Xcel Energy Rebate - Page 8. Adjourn Joint Powers Water Board Regular Meeting Minutes March 23, 2026 1. Call to Order. The regular meeting of the Joint Powers Water Board was called to order by Chairperson Amery, on Monday, March 23, 2026 at 6:01 p.m. at the Joint Powers Water Board Water Treatment Plant, 11100 50th St NE, Albertville, MN 55301. Board present: Mike Amery Gretchen Barrett Joe Hagerty Rob Olson Zach Schoen Bob Zagorski Board absent: None Board substitute: None Staff present: John Seifert, General Manager, Ruth Klick, Project Associate Staff absent: Dustin Carlson, Plant Supervisor Engineering present: Chris Larson, Short Elliott Hendrickson, Inc. (SEH) 2. Agenda: Hagerty moved, Schoen seconded to adopt the Agenda as presented with the Correction that it is for the March 23rd meeting, not February. Motion to approve carried 6-0. 3. Consent Agenda Barrett moved, Olson seconded to approve the Consent Agenda as presented. Motion to approve carried 6-0. 4. General Business: Hagerty moved, Barrett seconded to authorize staff to solicit for GSR Generator Package. Motion to approve carried 6-0. 5. Engineer: None 6. Operations: None 7. Other Business: Board discussed presented material regarding the 2025 DNR Pumping Report. No motion needed. 8. Adjournment: Barrett moved, Zagorski seconded to adjourn the meeting at 6:34 PM. Motion carried 6-0. JOINT POWERS WATER BOARD CHECK REGISTER SUMMARY MEETING DATE: 4/27/26 Vendor Check Date Amount Comments CITY OF ST MICHAEL 4/27/2026 $404,840.46 March 2026 Receipt by Charge CENTERPOINT ENERGY 4/28/2026 $1,298.77 March 2026 Invoices MN DEPT OF REVENUE 4/13/2026 $1,871.00 March 2026 Sales Tax Xcel Energy 4/1/2026 $14,823.10 Feb Electricity Payment Services Network 4/27/2026 $6,448.81 March Credit fees Brianna Buege 4/27/2026 $199.84 Ref cr bal on 13575 45th Ct Cheryl Aaserud 4/27/2026 $160.84)Ref cr bal on 13376 43rd Bay NE Christopher/Michelle Colburn 4/27/2026 $94.16)Ref cr bal on 10706 28th Ct NE City of Hanover 4/27/2026 $74,070.23 March 2026 Receipt by Charge Dennis Lee 4/27/2026 $147.88)Ref cr bal on 407 Paradise Dr SE E.H. Renner & Sons 4/27/2026 $27,431.25 Observation Wells Invoice 9325 Eric/Gina Jenkins 4/27/2026 $200.74 Ref cr bal on 3806 Mason Ave NE Hoff Barry, P.A.4/27/2026 $1,264.00 Invoice 19376 In Control 4/27/2026 $2,123.00 Testing Radio Signal Invoice S-INV03433 In Control 4/27/2026 $386.00 Flow transmitter Invoice S-INV03171 Joshua/Nicole Hobbs 4/27/2026 $75.00) Ref cr bal on 1158 Jambor Ave NE Kalley Johnson 4/27/2026 $81.44)Ref cr bal on 1813 Lachman Ave NE Melissa Kirchderg 4/27/2026 $214.17 Ref cr bal on 911 Ridge Dr SE Mike/Jaclyn Friedley 4/27/2026 $184.18 Ref cr bal on 2348 Kester Ave NE Municipal Builders, Inc 4/27/2026 $1,360.00 Invoice 552-7007 Nancy Backhaus 4/27/2026 $156.66)Ref cr bal 30 3rd St NW Randall Harris 4/27/2026 $180.57 Ref cr bal on 3571 Kadler Ave NE Short Elliott Hendrickson, Inc 4/27/2026 $723.10)JPAHS Scada System Upgrades Invoice 504375 Short Elliott Hendrickson, Inc 4/27/2026 $8,538.01 JPAHS 2025 General Engineering Invoice 503346 Short Elliott Hendrickson, Inc 4/27/2026 $466.32 JPAHS Oberservation Wells Invoice 506354 Short Elliott Hendrickson, Inc 4/27/2026 $2,392.47 JPAHS 2025 General Engineering Invoice 506355 Tegrete 4/27/2026 $474.00 May Monthly bill Invoice 121256 Tegrete 4/27/2026 $474.00 April Monthly Invoice 120877 Timothy/Haley Wolford 4/27/2026 $1,109.04 Ref cr bal on 2580 Kendall Ave NE Veolia Water 4/27/2026 $109,115.50 May Monthly bill Water Conservation Services 4/27/2026 $512.37 Water Leak Locate WSB 4/27/2026 $482.00 March GIS Fees $661,898.91 Mike Amery Rob Olson Gretchen Barrett Bob Zagorski Joe Hagerty Zach Schoen Monthly Operations Report March 2026 Executive Summary Joint Powers effectively produced 83,408,000 gallons of water in the report month. All bacteriological samples were negative. The average fluoride concentration was 0.71 mg/L (Limits are 0.5 & 0.9). Operations The standard operations of the facilities include: Major Activities Uncommon Operations and Major Corrective Maintenance: ❖ Lead and Copper Samples Safety & Training Each month our staff performs inspections of all safety equipment such as fire extinguishers, eyewash stations, chemical showers, and emergency lighting. We also have safety meetings during the month that consist of both routine and non-routine topics. Call-Outs (After-Hours Emergency Calls) ❖ None ❖ Daily testing of fluoride and chlorine in the system. ❖ Monthly performance inspections on wells. ❖ Monthly bacteriological sampling (25 samples). ❖ Bulk chemical deliveries. ❖ ERT missed reads/ meter checks. ❖ Chemical feed systems adjustments & maintenance. ❖ Laboratory equipment calibrations. ❖ Safety and training meetings. ❖ MC Lite meter reading routes for Hanover & St. Michael. ❖ Regularly scheduled operations & maintenance meetings. ❖ Routine daily rounds, inspections, and security checks of the water treatment plant. ❖ Routine weekly off-site facilities inspections and security checks. ❖ Regular backwashing of filters, reclaiming and pumping of backwash sludge. ❖ Monthly performance inspections of emergency generators. ❖ Monitoring & regulating access to the water towers for telecommunications companies to make repairs & upgrades. Regulatory Communications Our monthly regulatory communications were completed satisfactorily and on-time. These were: ❖ The monthly fluoridation report to the MDH ❖ The monthly bacteriological test results to the MDH ❖ The monthly injection/recovery report to the EPA Major Client / Public Relations Issues ❖ None Distribution System Statistics Total Hanover St Michael Joint Powers Comments Locates (GSOC) 296 67 228 1 Gopher State One Call, Tickets Received Hydrants Flushed 0 0 0 0 Spring/Fall (Joint Powers Are Albertville) Customer Service Visits 8 0 8 0 Including water quality issues (Albertville), water usage issues, curb stops on/off,water main operations, special locate tickets (not through GSOC) & misc. issues. Inspections 34 9 25 0 Meter/ERT Issues/Repairs 55 8 47 0 These include out-of-bounds read checks, leaking meters, bad ERTs/replacements, wiring issues, missed reads, monthly meter reading, etc. Maintenance Work Orders 40 1 0 39 These include issues/repairs & regular maintenance for the dist. systems & JP facilities. Finals 49 9 40 N/A YTD Reconcilable Limit Budget Budget Expenses Balance LIM $ 307,000 $ 36,871 $268,129 Final reconciliation will occur after year-end finances have been processed.*No updates on Actual available at time of report. Estimated Appendices Monthly Fluoride Report, Monthly Bacteriological Report, Monthly ASR EPA Report Drinking Water Protection Section P.O.Box 64975-0975 St. Paul, MN 55164-0975 Bacteriological/Disinfectant Residual Monthly Report 651/201-4700. FAX 651/201-4701 Public Water System ID (7 digits)Laboratory Certification ID (9 digits) -- NAME OF WATER SUPPLY SYSTEM LABORATORY NAME Analyst Name Joint Powers Water UC LABORATORY ADDRESS I verify that this report is accurate. 11100 50th St NE Membrane Filter MPN 10 ml CITY ZIP PHONE Albertville 763-497-3611 Colisure MPN 100 ml PHONE (507) 234-5835 *Disinfectant Residual (chlorine/chloramine) monitoring samples must be collected at the same sample points and same time as coliform samples. Sample #1 CJ's Chlorine Residual Rec Temp Deg C Sample #2 Country Inn Chlorine Residual Rec Temp Deg C Sample #3 Alb. Speedway Chlorine Residual Rec Temp Deg C Sample #4 38 Balsam Chlorine Residual Rec Temp Deg C Sample #5 Napa Chlorine Residual Rec Temp Deg C Sample #6 Kwik Trip Chlorine Residual Rec Temp Deg C Sample #7 Holiday Chlorine Residual Rec Temp Deg C Sample #8 Radzwill Chlorine Residual Rec Temp Deg C Sample #9 Millpond A.Chlorine Residual Rec Temp Deg C Sample #10 Tom Thumb Chlorine Residual Rec Temp Deg C Sample #11 Center Cut Meats Chlorine Residual Rec Temp Deg C Sample #12 Particle Ctrl Chlorine Residual Rec Temp Deg C Sample #13 Kwik T. Alb.Chlorine Residual Rec Temp Deg C Sample #14 40 Balsam Chlorine Residual Rec Temp Deg C Sample #15 Dehmer's Chlorine Residual Rec Temp Deg C Sample #16 BP Chlorine Residual Rec Temp Deg C Sample #17 Speedway West Chlorine Residual Rec Temp Deg C Sample #18 STM P.W.Chlorine Residual Rec Temp Deg C Sample #19 Han. P.W.Chlorine Residual Rec Temp Deg C Sample #20 Han. City Hall Chlorine Residual Rec Temp Deg C Sample #21 CJ's Chlorine Residual Rec Temp Deg C Sample #22 Country Inn Chlorine Residual Rec Temp Deg C Sample #23 Alb. Speedway Chlorine Residual Rec Temp Deg C Sample #24 38 Balsam Chlorine Residual Rec Temp Deg C Sample #25 Napa Chlorine Residual Rec Temp Deg C Sample #26 Kwik Trip Chlorine Residual Rec Temp Deg C Sample #27 Holiday Chlorine Residual Rec Temp Deg C Sample #28 Radzwill Chlorine Residual Rec Temp Deg C Sample #29 Millpond A.Chlorine Residual Rec Temp Deg C Sample #30 Tom Thumb Chlorine Residual Rec Temp Deg C 62 MK/MK 1 Positive for Total Coliform 7 Number of Samples Routine Samples Positive For Percent of Samples Where D.R. Monthly Average D.R. (Total Chlorine or Chloramine. Number of Sites Number of Samples 55301 Collected 0 X 61 Total Coliform Analysis Method 811 8 6 0 0 2 4 Number of SamplesReport For required Per Month Number of Samples Positive for Was Measured MM/YY (for systems required to collectmg/l) Mar/2026 Total Coliform 30 30 E Coli 30 0%0.75 0 0 40 or more samples) Coliform/E.Coli) Original Positive Samples Results (TotalDistribution Location (address or name of facility) Analysis Date Coliform/E.Coli) Analysis DateCollection Date Source/Well#(s) or Distribution Location (address or name of facility)Collection Date Repeat Samples (Lab may attach sheet with additional repeat sample locations.) 1.00.99 0.63 1.0 0.66 0.54 0.95 0.86 1.0 1.0 1.0 0.77 1.0 1.0 0.91 1.0 1.0 1.0 1.0 Results (Total 0.90 1.0 0.71 0.74 0.75 1.0 1.0 1.0 0.73 0.80 1.02 0.78 0.60 0.57 0.72 1.0 0.61 1.0 0.73 0.81 1.0 0.88 0.49 0.85 1.0 1.0 1.00.62 1.0 1.0 0.60 1.0 0.97 0.62 0.59 1.0 1.0 1.0 1.0 1.0 1.0 3/27/26 Joint Powers Water Board Filter Plant Process Mag Meter Upgrade Capital Improvement Element: Filter Rehab Project - Misc. Repairs April 27, 2026 JOINT POWERS WATER BOARD MEMORANDUM OF UNDERSTANDING (MOU) 1. Purpose This Memorandum of Understanding (MOU) establishes the roles and responsibilities of the Joint Powers Water Board (“Board”) and Veolia Water North America (“VEOLIA”) in the procurement, installation, startup, and operation of a system efficiency improvement project. 2. Project Description As part of ongoing water operations, risk assessment and maintenance initiatives, the Board and VEOLIA staff have identified a necessary system upgrade improvement involving the replacement of four (4) large-diameter magnetic flow meters (“magmeters”). The existing meters are approximately 26 years old and are no longer supported for calibration or repair. These meters are critical to plant operations, as they measure flow across each individual pressure filter within the Joint Powers Water Board (JPWB) plant. Failure of a single meter would require the associated filter to be removed from service until repairs are completed. Meter equipment lead times are estimated to be 45 days after receipt of order. To maintain operational continuity, staff recommends replacing these meters prior to failure and before peak pumping season. Veolia will provide labor to remove and assist with installation of the meters with rigging and lifting support provided from MBI Mechanical Contractor for safety. 3. VEOLIA Responsibilities VEOLIA agrees to: ● Procure and deliver replacement meters and all associated materials as identified in Exhibit “A.” ● Provide on-site personnel to assist with the removal and installation. ● Coordinate Board-approved subcontractors, including MBI Contracting and, if necessary, an integration contractor. ● Support SCADA integration and calibration required for startup. ● Utilize off-site VEOLIA technical personnel experienced in similar installations. 4. Board Responsibilities The Board agrees that: ● Project costs outlined in Exhibit “A” are not included in the 2026 Limit Budget. ● Subcontractor work will be billed on a time-and-materials basis. ● The Board will reimburse VEOLIA project costs on Exhibit “A” upon project completion paid by separate invoice. 5. Additional Terms ● Equipment includes all magmeter-related components as described in Exhibit “A.” ● VEOLIA operations staff labor is included. ● Subcontractor work will be billed at cost (time and materials). ● VEOLIA will provide startup services and establish a performance baseline. ● Manufacturer warranties will be provided and maintained by Veolia per existing contract. ● Applicable sales tax will be added to the final invoice. The undersigned acknowledge and agree to the terms of this Memorandum of Understanding. JOINT POWERS WATER BOARD By: __________________________________________ Name: Mike Avery Title: Chairperson Date: _______________________ VEOLIA WATER NORTH AMERICA By: __________________________________________ Name: John Seifert Title: General Manager Date: _______________________ Project Cost Summary (Exhibit “A”) Qty Description Cost Ext. 4 12” E&H Promag W-400 Electronic Flow Meters Model No. (5W4C3H-AAELHA0DHA1K0A+L5) $3,905.00 $15,620.00 8 New Sealing Flange Gaskets and T150 Fastener Kits $146.50 $1,172.00 1 Shipping Charges $789.00 $789.00 TOTAL $17,581.00 JOINT POWERS WATER BOARD 2025 "LIMIT" RECONCILIATION SUMMARY CATEGORY ACTUAL BUDGET BALANCE DUE REPAIR & MAINTENANCE (64,486.30)(58,000.00)6,486.30) CHEMICALS (169,553.20)(235,025.00)(65,471.80) SLUDGE DISPOSAL (12,800.90)(30,000.00)(17,199.10) FACILITY MANAGEMENT (29,466.11)(33,000.00)(3,533.89) TOTAL (276,306.51)(356,025.00)(79,718.49) Credit to Joint Powers Water Board in 2026 (79,718.49) WATER REPAIR & MAINTENANCE Date Amount Description Vendor 01/16/2025 (340.34) Ball valve Core & Main 01/16/2025 74.81 Flange kits Core & Main 02/01/2025 (927.61) 2 level sensors Vega 02/10/2025 (44.16) Lab equipment HACH COMPANY 02/11/2025 (27.46) Adaptors, union Ace of Albertville 02/10/2025 (34.36) MultiTest kit case HACH COMPANY 02/11/2025 (196.54) Scaffolding A Tool Shed 02/06/2025 (25.54) Tier II Report HSEM 02/06/2025 (1,155.00) ASR Permit Fee MN DNR 03/06/2025 (1,003.55) Meter Calibration Midwest Flo 03/07/2025 (845.42) Booster pump Dakota Supply 03/07/2025 (281.76) Batteries OSI 03/07/2025 (646.55) Bid advertisement for SCADA upgrade ECM 03/10/2025 (133.09) Heater Tractor Supply 03/10/2025 (58.40) Tube Amazon 03/10/2025 (43.94) Adapter, tubing Fleet Farm 03/10/2025 (175.47) CO2 Airgas 03/12/2025 (91.27) Pipe fittings Core & Main 03/12/2025 (966.38) Gaskets, closed cell Kurita 03/19/2025 (1,254.83) Motor Olson Electric 03/19/2025 ((29.60) HS S/S Parts Fastenal 03/19/2025 ((657.00) Refund Comfort Matters 03/28/2025 (609.00) PLC Board Replacement Automatic Systems 04/01/2025 (133.89) Parts/Tools B&D Plumbing 04/07/2025 (16.30) Blades Hardware Hank 04/07/2025 (117.03) RPZ Calibration Shopbackflow 04/08/2025 (511.08) Magnetic locator Zoro Tools 04/08/2025 (5.35) Concrete repair tube Home Depot 04/08/2025 (4.16) Parts/Tools Ace of Albertville 04/09/2025 (603.00) DR3900 Laboratory Spectrophotometer Hach 04/10/2025 (120.00) GIS Service ESRI 04/29/2025 ((36.76) Hoffman Panel Auction Masters 04/29/2025 (209.59) Heat gun Zoro Tools 04/07/2025 (5.36) 4 Pack, 1 mL Glass Eye Dropper Amazon 05/01/2025 (140.12) Washers Core & Main 05/01/2025 (36.76) Hoffman Panel Auction Masters 05/01/2025 ((209.59) Returned items Zoro Tools 05/06/2025 (1,633.17) VFD for Well 2 Custom Electric 05/08/2025 (430.54) Grinder, impact wrench Zoro Tools 05/09/2025 (21.46) Bit set Ace of Albertville 05/09/2025 (19.32) Brush sweep for door Ace of Albertville 05/13/2025 ((13.83) Heater Repair AR Engh 05/14/2025 (579.00) VFD for Well 2 all labor InControl 05/15/2025 (37.97) Repair kit Home Depot 05/15/2025 (209.59) Electric Hand Tool Zoro Tools 05/15/2025 (4,812.00) Accounting Services Lease GASB Clifton Larson Allen 05/15/2025 (3,000.00) Accounting Auditing Model Clifton Larson Allen 05/15/2025 (19.31) Cable for cubicles Target 05/22/2025 (991.50) Filter #2 emergency repair - all labor Midwest Flo 05/09/2025 (12.37) Rack Mount Kit Amazon 05/20/2025 (63.31) Fiber optic cable CDW LLC 06/01/2025 (602.50) Scada Troubleshooting Automatic Systems 06/10/2025 (160.40) Shelves, bracket, rail, driving set Home Depot 06/10/2025 (51.06) Tools Harbor Freight 06/10/2025 (18.88) Keypad Tray; Fire Cabinet Auction Masters 06/10/2025 (135.41) Cat6 cables My Cable Mart 06/11/2025 (2,285.57) Flow meter Ebay 06/16/2025 (222.80) Cable definitions and consolidations InControl 06/16/2025 (583.22) Generator Fuel Beaudry Oil 06/18/2025 ((49.78) VFD Maintenance Ideal Service 06/01/2025 (15.82) Transceiver CDW 06/01/2025 (145.21) Transceiver CDW 06/12/2025 (18.23) Rail slotted aluminum Amazon 07/10/2025 (13.95) Acid, screws Ace of Albertville 07/10/2025 (18.65) Blade Hardware Hank 07/10/2025 (104.73) Screws Ziegler Inc 07/10/2025 (104.04) Storm water City of Albertville 07/10/2025 (30.03) Keys Russell Security 07/10/2025 ((2,254.88) ABB Meter Ebay 07/10/2025 (284.54) Anchor; Dispenser Hilti 07/11/2025 (826.44) VFD Maintenance Ideal Service 07/17/2025 (108.50) Plate settler lid Fabrication Station 07/22/2025 (37.73) UPS CDW 08/01/2025 (289.91) Eaton input/output card Ideal Service 08/01/2025 (815.15) Flow meter calibrations Midwest Flo 08/01/2025 (355.90) WELL #2 Troubleshoot Midwest Flo 08/08/2025 (27.38) Gate valve keys Hardware Hank 08/08/2025 (576.56) Roof Leak BB Sheet Metal 08/08/2025 (613.65) Reservoir pump bid posting ECM Publishing 08/11/2025 (440.24) Troubleshoot CenturyLink Phone Guys 08/11/2025 (758.79) Secure Storage Locking Hardware TruDoor 08/14/2025 (965.00) Chem feed pumps to feed InControl 08/15/2025 (1,852.50) Repair VFD for Well #4 Ideal Service 08/01/2025 (396.37) UPS CDW 08/07/2025 (3,725.52) Vegascan Vega 09/01/2025 (540.00) Calibrated existing VFD Well 5 Midwest Flo 09/06/2025 (772.00) PLC Support InControl 09/06/2025 (700.00) Database assistance DataSuccess 09/09/2025 ((660.08) YSI HD SUPPLY INC 09/10/2025 (84.76) Parts Ace of Albertville 09/11/2025 (9.43) Parts for bleach tank Ace of Albertville 09/11/2025 (195.00) Freight for equipment FedEx 09/12/2025 ((19.91) Eaton input/output card Ideal Service 09/17/2025 (78.87) Electric Hand Tool Home Depot 09/17/2025 (24.81) Hand Tool WIHA Tools 09/17/2025 (250.00) Concrete Coring Machine Rental Home Depot 09/21/2025 (589.47) Well#6 Magmeter ASR magmeter Midwest Flo 09/01/2025 (1,073.75) Hydropillar East Tower UTILITY SERVICE CO INC 09/01/2025 (1,073.75) Hydropillar West Tower UTILITY SERVICE CO INC 09/10/2025 (201.97) YSI Sensors HD SUPPLY INC 09/10/2025 (241.45) YSI Probe HD SUPPLY INC 09/10/2025 (216.66) DO Sensor HD SUPPLY INC 10/01/2025 (2,500.00) Banyon update DATASUCCESS INC 10/01/2025 (644.25) LCPA PLC Support part InControl 10/01/2025 (675.50) VFD for Well 4 InControl 10/01/2025 (530.75) Well 5 level transmitter InControl 10/10/2025 (19.30) Sawzall Ace of Albertville 10/13/2025 (2,376.56) Generator Repair Ziegler Cat 10/13/2025 (93.75) Website Red Technologies 10/13/2025 (125.00) Website Red Technologies 10/13/2025 (200.00) Annual Fee GFOA 10/13/2025 (331.99) Application Fee MDH 10/17/2025 (735.00) Well #4 VFD start up Ideal Service 10/25/2025 ((56.09) Emergency Lighting Amazon 11/01/2025 (700.00) Scada upgrade review DataSuccess 11/17/2025 (1,655.72) Yagi Antenna True North Controls 11/19/2025 (150.00) Website Red Technologies 11/04/2025 (1,288.50) FCC License True North Controls 11/01/2025 (25.86) Redox solution Hach 11/04/2025 (119.11) Manganese test kit Hach 12/20/2025 (968.75) Hook up sludge press trailer Custom Electric 12/19/2025 (610.43) SCADA upgrade True North Controls 12/18/2025 (752.00) ATS maintenance Well 6/7 Modern Power 12/18/2025 (519.50) ATS maintenance ASR Modern Power 12/18/2025 (752.00) ATS maintenance water system pump Modern Power 12/15/2025 (1,684.35) Watermain parts Dakota Supply 12/15/2025 (347.09) Pump Repair Parts Northern Dewatering 12/15/2025 (252.19) Watermain parts Dakota Supply 12/15/2025 (222.24) Scada upgrade Wilson Amplifiers 12/12/2025 (85.00) Meter Test MidAmerica Meter 12/11/2025 (150.00) Website Red Technologies 12/10/2025 ((113.72) Yagi Antenna True North Controls 12/10/2025 ((88.50) FCC License True North Controls 12/17/2025 (1,416.47) Promag W 400 Endress & Hauser 12/01/2025 (103.50) Magnetic Mounting Kit Grainger 10/23/2025 (289.44) HVAC Maintenance Yale Mechanical 12/31/2025 (320.89) Fire Extinguisher Inspections Has LLC 12/31/2025 (119.81) Scada Upgrade Action Radio 12/31/2025 (5.78) Repair items Hardware Hank 12/31/2025 (775.00) Scada Upgrade MidAmerica Meter 12/31/2025 (150.00) Website Red Technologies 10/08/2025 (506.81) Scada upgrade True North Controls 12/31/2025 ((97.29) Promag W 400 Endress & Hauser 12/31/2025 (401.34) Field Luminescent Hach 12/23/2025 (900.00) Install antennas for wells Custom Electric 12/31/2025 ((34.81) Antenna True North Controls CHEMICALS Date Amount Description Vendor 01/08/2025 (4,081.97) Sodium Hypochlorite Hawkins 03/05/2025 (8,593.75) Sodium Hypochlorite Hawkins 03/18/2025 (9,141.91) LPC-4 Hawkins 03/18/2025 (1,759.77) Fluoride Hawkins 04/22/2025 (8,708.17) Sodium Hypochlorite Hawkins 05/13/2025 (8,699.99) Azone 15 Hawkins 06/01/2025 (9,141.91) LPC-4 Hawkins 06/01/2025 (2,150.83) Fluoride Hawkins 06/16/2025 (8,642.79) Azone 15 Hawkins 07/17/2025 (8,507.93) Azone 15 Hawkins 07/09/2025 (9,141.91) LPC-4 Hawkins 07/09/2025 (2,150.83) Fluoride Hawkins 08/07/2025 8720.43 Azone 15 Hawkins 08/13/2025 (8,593.75) Azone 15 Hawkins 08/13/2025 (9,141.91) LPC-4 Hawkins 08/13/2025 (2,150.83) Fluoride Hawkins 09/01/2025 (2,848.87) Azone 15 Hawkins 09/03/2025 (9,141.91) LPC-4 Hawkins 09/03/2025 (1,205.77) Fluoride Hawkins 10/01/2025 (8,610.09) Azone 15 Hawkins 11/05/2025 (9,141.91) LPC-4 Hawkins 11/05/2025 (1,707.63) Fluoride Hawkins 11/05/2025 (8,005.30) Azone 15 Hawkins 11/13/2025 (474.81) Azone 15 Hawkins 12/16/2025 (9,141.91) LPC-4 Hawkins 12/16/2025 (1,303.53) Fluoride Hawkins 12/31/2025 (8,642.79) Azone 15 Hawkins SLUDGE DISPOSAL Date Amount Description Vendor 10/01/2025 (1,020.90) Sludge Disposal Vonco II 10/14/2025 (11,780.00) Sludge Disposal Fergus Power FACILITY MANAGEMENT Date Amount Description Vendor 01/11/2025 (214.15) Emergency Lights Amazon 01/15/2025 (56.09) Air Filters Amazon 02/11/2025 (118.10) Heater Tractor Supply 02/06/2025 (153.32) Steel Rack Zoro Tools 02/06/2025 (163.53) Desk Cort Furniture 02/10/2025 (823.28) Security System Repair Wright Hennepin 02/10/2025 (320.40) Security System Repair Wright Hennepin 02/10/2025 (93.21) Storm Water City of Albertville 03/07/2025 (4.00) Storm Water Joint Powers Water Board 03/07/2025 (93.71) Storm Water Joint Powers Water Board 03/07/2025 (4.00) Storm Water Joint Powers Water Board 03/05/2025 1348.28 Heater Amazon 03/07/2025 (298.40) Rug Uline 03/07/2025 (62.22) Security System Wright Hennepin 03/07/2025 (80.81) Pest Control Plunkett's 03/07/2025 (529.40) Security System Wright Hennepin 03/19/2025 ((96.39) HVAC Maint Yale Mechanical 04/01/2025 (201.33) Rpr heating in office AR Engh 04/08/2025 (159.59) Thermostat Zoro Tools 04/08/2025 (1,400.00) Cubicles Down Payment TJ Office Furniture 04/08/2025 (80.81) Pest Control Plunkett's 04/09/2025 (102.44) Storm Water Joint Powers Water Board 04/09/2025 (40.00) Storm Water Joint Powers Water Board 04/09/2025 (40.00) Storm Water Joint Powers Water Board 04/09/2025 (4.00) Storm Water Joint Powers Water Board 04/09/2025 (4.00) Storm Water Joint Powers Water Board 04/09/2025 (62.22) Security System Wright Hennepin 04/09/2025 (63.29) Security System Wright Hennepin 04/01/2025 (5,339.00) Generator Maintenance Kodiak Power Systems 04/01/2025 (1,942.23) Crank case breather replacement Kodiak Power Systems 05/08/2025 (36.59) Cubicle cords My Cable Mart 05/12/2025 (84.04) Pest Control Plunkett's 05/12/2025 (1,363.66) Cubicles TJ Office Furniture 05/13/2025 (102.88) Storm Water City of Albertville 05/13/2025 (3,800.00) Cubicles TJ Office Furniture 05/13/2025 (63.29) Security System Wright Hennepin 05/13/2025 (62.22) Security System Wright Hennepin 05/13/2025 (121.04) Equipment removal Lakeshore Recycling 05/13/2025 (2,996.04) Gas leak on generator line Yale Mechanical 05/22/2025 (322.84) Wiring office cubicles - all labor Custom Electric 06/10/2025 (84.04) Pest Control Plunkett's 06/10/2025 (69.23) Security System Wright Hennepin 06/10/2025 (1,601.20) Security System Wright Hennepin 06/16/2025 (501.17) Clean up wiring for cubicles Phone Guys 06/16/2025 (62.22) Security System Wright Hennepin 06/16/2025 (771.22) Wire new cubicles Phone Guys 06/16/2025 (103.34) Storm water City of Albertville 07/10/2025 (322.13) Stump Removal H&K Tree Service 07/10/2025 (84.04) Pest Control Plunkett's 07/10/2025 (63.29) Security System Wright Hennepin 07/17/2025 (16.62) Ant killer Hardware Hank 07/16/2025 (105.36) Belt; Filters Grainger 08/08/2025 (104.60) Storm water City of Albertville 08/08/2025 (62.22) Security System Wright Hennepin 08/08/2025 (63.29) Security System Wright Hennepin 08/11/2025 (133.99) Secure Key Storage Cabinet Zoro Tools 08/11/2025 (166.27) Mailbox Post Salsbury Industries 09/04/2025 (362.02) Crane inspections Midwest Crane 09/11/2025 (105.37) Storm water City of Albertville 09/11/2025 (65.47) Weed killer Ace of Albertville 09/11/2025 (62.22) Security System Wright Hennepin 09/11/2025 (63.29) Security System Wright Hennepin 09/11/2025 (168.08) Pest Control Plunkett's 10/13/2025 (106.01) Storm water City of Albertville 10/13/2025 (84.04) Pest Control Plunkett's 10/13/2025 (62.22) Security System Wright Hennepin 10/13/2025 (63.29) Security System Wright Hennepin 10/13/2025 (57.79) Rugs Ace of Albertville 11/19/2025 (35.70) Building Repairs Home Depot 11/19/2025 (106.88) Storm water City of Albertville 11/19/2025 (99.10) Plant Tour Refreshments Sams Club 11/19/2025 (63.29) Security System Wright Hennepin 11/19/2025 (62.22) Security System Wright Hennepin 11/19/2025 (84.04) Pest Control Plunkett's 11/19/2025 (21.48) Bonding Tour Starbucks 12/12/2025 (107.53) Storm water City of Albertville 12/12/2025 (62.22) Security System Wright Hennepin 12/12/2025 (63.29) Security System Wright Hennepin 12/12/2025 (84.04) Pest Control Plunkett's 12/31/2025 (107.91) Storm water City of Albertville 12/31/2025 (63.29) Security System Wright Hennepin 12/31/2025 (46.98) Pest Control Ace of Albertville 12/31/2025 (84.04) Pest Control Plunkett's 12/31/2025 (319.28) Security System Wright Hennepin 12/31/2025 ((117.23) Belt; Filters Yale Mechanical TO : Joint Powers Water Board FROM : John Seifert DATE : April 27, 2026 SUBJECT : Insurance Renewal Dan Zachman with Zachman Insurance Agency will provide a 2026 insurance update to the Board and will ask for Board approval to adopt the renewal as presented. By way of communication, the 2025 insurance premium from League of Minnesota Cities Insurance Trust (“LMCIT”) was $30,240. The JPWB did not received a LMCIT dividend reimbursement for 2025 in December. The League has decided to delay until June of 2026. (See following excerpt from LMCIT communication to member cities) Program dividends for property/casualty and workers’ compensation The Trustees have decided to wait until June 2026 to make decisions about whether to return program dividends to members for the fiscal year ending in 2025. This change aligns with the Trust’s recent transition to a calendar-year fiscal schedule and allows for a more accurate assessment of financial performance across the full fiscal period. In addition, given current market uncertainty and volatility and potential changes to Federal Emergency Management Agency (FEMA) and other programs, this timing ensures the Trust can make well-informed decisions that best serve members’ long-term interests and financial stability. Recommended Motion: Staff recommends approving the 2026 LMCIT insurance renewal for JPWB in the amount of $35,861. Insurance Review By Dan Zachman Zachman Insurance Agency, Inc For Joint Powers Water Board From League of Minnesota Cities Insurance Trust Berkley Risk Services, Incorporated 145 University Avenue West St. Paul, Minnesota 55103 Policy Dates 05/17/2026 – 05/17/2027 Section I Property LOCATION 1 - 11100 50TH STREET, Albertville, MN 55301 Building 9,861,900 Contents 8,193,400 Property in the Open 35,425 LOCATION 2 - LOT 1, BLK 1, TOWER ADD'N, Albertville, MN 55301 - WATER TOWER & PUMPHOUSE Building 3,497,000 Contents 176,300 Property in the Open 11,808 LOCATION 3 - E OF NABER AVE & 50TH ST, Albertville, MN 55301 - WATER TOWER Building 6,540,500 Contents 196,100 LOCATION 4 - 3052 LANDER AVE, Albertville, MN 55301 - PUMPING BOOSTER STATION Building 278,800 Contents 29,800 LOCATION 5 - CITYWIDE, Albertville, MN 55301 – 80 Fire Hydrants Property in the Open 483,857 LOCATION 6 - 101 TERRACE ROAD E, Albertville, MN 55301 - WELL # 5 Building 278,800 LOCATION 7 - 376 IVORY AVE NE, Albertville, MN 55301 - WELL #6 Building 41,600 Contents 590,700 LOCATION 8 - 376 IVORY AVE W, Albertville, MN 55301 - WELL #7 Building 20,800 Contents 475,800 LOCATION 9 - 10690 15TH ST NE, Albertville, MN 55301 - WELLHOUSE & WELL #9 Building 1,363,700 Contents 664,200 Property in the Open 9,012 LOCATION 10 – 376 IVORY AVE W, Albertville, MN 55301 – Generator Building 237,600 Total Blanket limit 32,987,102 Replacement cost $1,000 deductible (Up 5,718,575 from last year) Section II Comprehensive General Liability Limits Each Occurrence Limit 2,000,000 Per person Limit 2,000,000 Products / Completed Operations Annual Aggregate 3,000,000 Failure to Supply Annual Aggregate 3,000,000 Fire Damage Liability 50,000 Limited Pollution Liability Aggregate 2,000,000 Land Use, Development or Franchise Litigation 1,000,000 Claims Made Forms $1,000 deductible – All Claims Section III - Comprehensive Auto Limits Uninsured motorists $200,000 Underinsured motorists $200,000 Hired and Non owned Auto $2,000,000 Section IV Commercial Comprehensive Catastrophe Liability Limits $1,000,000 with $10,000 Retained Limit Coverage to follow form, including Public Official Liability (“Does Waive” the monetary limits on Tort Liability established by Minnesota Statues 466.04 up to the limits written by the policy.) Section V Public Employees Blanket Bond Limits $250,000 Blanket Employees Dishonesty & Faithful Performance $1,000 deductible/occurrence Section VI Equipment Breakdown Coverage Limits $32,987,102 $1,000 deductible / Per Accident Fist Party Cyber Limits $250,000 $1,000 Deductible Premium Recap 2013-2014 2014-2015 2015-2016 2016-2017 Section I Property 12,360 12,571 12,187 11,847 Section II Municipal Liability 1,618 1,295 1,101 850 Section III Comprehensive Auto 78 78 78 78 Section IV Commercial Comprehensive 900 855 855 855 Catastrophe Liability Section V Public Employee’s Blanket Bond 336 336 366 400 Section VI Boiler & Machinery 2,812 2,860 2,753 2,790 Totals $18,104 $17,995 $17,310 $16,820 Premium Recap 2017-2018 2018-2019 2019-2020 2020-2021 Section I Property 11,524 11,886 12,586 11,109 Section II Municipal Liability 850 850 850 850 Section III Comprehensive Auto 78 78 78 78 Section IV Commercial Comprehensive 855 855 855 855 Catastrophe Liability Section V Public Employee’s Blanket Bond 400 380 380 342 Section VI Boiler & Machinery 2,724 2,815 2,928 3,052 Totals $16,431 $16,864 $17,677 $16,286 Premium Recap 2021-2022 2022-2023 2023-2024 2024-2025 Section I Property 11,372 15,681 22,105 23,312 Section II Municipal Liability 850 850 850 882 Section III Comprehensive Auto 82 82 83 87 Section IV Commercial Comprehensive 855 855 1200 1,200 Catastrophe Liability Section V Public Employee’s Blanket Bond 342 342 321 321 Section VI Boiler & Machinery 3,124 3,314 3,469 3,661 First party Cyber -485 485 485 Totals 16,627 $21,609 $28,513 $29,948 Premium Recap 2025-2026 2026-2027 Section I Property 23,769 27,728 Section II Municipal Liability 850 1,288 Section III Comprehensive Auto 93 93 Section IV Commercial Comprehensive 1,200 1,200 Catastrophe Liability Section V Public Employee’s Blanket Bond 337 339 Section VI Boiler & Machinery 3,545 4,320 First party Cyber 446 893 Totals $30,240 $35,861 TO : Joint Powers Water Board FROM : Ruth Klick DATE : April 27, 2026 SUBJECT : Website Upgrade This memo recommends the Joint Powers Water Board approve an investment in a comprehensive upgrade of our company website to better serve our customers. BACKGROUND The current website has served its purpose, but it was last created over 13 years ago and no longer reflects the standards our customers expect. It was designed and has been maintained by Red Technologies. PROBLEM Presently, the visual presentation is not ready for ADA compliance in 2027, is not compatible with mobile devices, has slow load and scrolling times, and lacks modern features that allow customers to easily communicate with staff. We also are not prepared for the new federal Consumer Confidence Report (CCR) requirements coming up later this year. SOLUTION Staff recommends a full website redesign and upgrade that includes a modern, responsive design that is federally compliant with improved content management. INVESTMENT Staff have reviewed presentations from 3 different website developers for quality and ease of use. The proposals are summarized in the table below. The set-up charge is the amount to redesign and upgrade the website. The monthly fee is an additional amount to maintain and update the website on a monthly basis. Developer Set-Up Charge Monthly Fee Catalis $2,000 $182 Majirs! $3,798* $348 Red Technologies $10,800 $150 *Majirs! charges an additional $115/hr for custom form design of which the website will need at least 1. Recommended Motion: Staff recommends authorizing the website upgrade to Catalis for the sum of $2,000 for implementation and a 4 year subscription. Catalis Order Form (v0325) 1 Catalis 3025 Windward Plaza, Suite 200 Alpharetta, GA 30005 No.: 006Ph00000hMKAcIAO Order Form Date:3/5/2026 ORDER FORM CUSTOMER INFORMATION Customer: Joint Powers Water Board, MN Phone: 612-257-0356 Primary Contact: Ruth Klick Address: 11100 50th St. NE, Albertville MN 55301 System Administrator: Ruth Klick Billing Contact: Ruth Klick ACH: ☐ Billing Email: ruth.klick@veolia.com PO Required: ☐ Billing Phone: 612-257-0356 Tax Exempt: ☐ Catalis Representative: Mason Offenberger Mason.offenberger@catalisgov.com 330-324-0983 TERM Subscription Start Date: May 1st, 2026 The Subscription Start Date is the date the Software will be provisioned to the System Administrator. The Initial Term of the Subscription shall begin on the Subscription Start Date and will continue for four (4) years (“Initial Term”). Upon completion of the Initial Term, the Order Form shall automatically be renewed for a subsequent annual twelve (12) month term(s). BILLING SUMMARY 1. Software Subscription Fees and Recurring Professional Services Fees shall be billed up on the Subscription Start Date and annually in advance thereafter. 2. Invoices shall be due and payable within thirty (30) calendar days following invoice by Catalis. 3. Any Recurring Fees will increase annually by the greater six percent (6%) or by the increase in the Consumer Price Index (“CPI”) for the prior calendar year. PRICING Pricing below is valid through April 30th, 2026. 1. Software Subscription Fees Year 1 Year 2 Year 3 Year 4 Content Management System Software Subscription $2,000.00 $2120.00 $2247.20 $2382.03 Total Subscription Fees $2,000.00 $2120.00 $2247.20 $2382.03 2. One-Time Fees Content Management System Implementation $2,000.00 Total Subscription Fees $2000.00 Catalis Order Form (v0325) 2 Catalis 3025 Windward Plaza, Suite 200 Alpharetta, GA 30005 No.: 006Ph00000hMKAcIAO Order Form Date:3/5/2026 TERMS AND CONDITIONS The Agreement contains the following, listed in order of appearance: This Order Form The Master Software Subscription and Services Agreement https://catalisgov.com/master-software-subscription-and-services-agreement/ Schedule A: Software Description and Scope of Use In the occurrence of a conflict between any of the above with one another, this Order Form shall control. General Notes: 1. Capitalized terms used herein but not defined in this Order Form have the meanings given to them in the Master Software Subscription and Services Agreement. 2. The Parties agree to keep all aspects of this agreement confidential to the extent permitted by law. 3. Order Form line items represent estimates based upon initial evaluation of project complexity and duration. The actual time to complete the scope of work may vary. The Pricing listed above is estimated based on the information available to Catalis at the time of the making of this Order Form. 4. Following adoption of this Order Form, changes to the Statement of Work must be memorialized with a written Amendment or Work Order, without regard to whether the change affects costs, and must be approved in writing by Catalis and the Customer. If the changes impact cost, an estimate of the cost impact shall be included. Any cost for future Professional Services, customizations, modifications, or integrations shall be provided at the Catalis standard hourly services rate. The Statement of Work shall be subject to the terms of this Agreement. ACCEPTANCE By signing below, signatories represent that they are validly authorized to enter into this Order Form and accept their terms and conditions. The Order Form is dated effective and shall be considered binding upon execution (“Effective Date”) by and between both parties. Joint Powers Water Board, MN: By: _______________________________________ Name: _______________________________________ Title: _______________________________________ Date: _______________________________________ CATALIS PUBLIC WORKS & CITIZEN ENGAGEMENT, LLC: By: _______________________________________ Name: _______________________________________ Title: _______________________________________ Date: _______________________________________ Catalis Order Form (v0325) 3 Catalis 3025 Windward Plaza, Suite 200 Alpharetta, GA 30005 No.: 006Ph00000hMKAcIAO Order Form Date:3/5/2026 SCHEDULE A: SOFTWARE DESCRIPTION AND SCOPE OF USE This section provides a description of the Software Services being offered; however, it is understood that detailed Functional Specifications will also be available in separate Documentation provided for guidance on product functionality and usage. Content Management System WEBSITE SUBSCRIPTION INCLUDES: Nightly Backups Inc. Content Management Software and Maintenance Inc. SSO Inc. Administrator Dashboard Inc. Automatic Feature Updates Inc. Accessibility Development                                Inc. Responsive Designs Inc. AWS North America Hosting Inc. SSL Certificates Inc. 5 hours paid Support (no annual rollover) Inc. Joint Powers Water Board Tel. : 763-497-3611 11100 50th St NW Fax : 763-497-4908 Albertville MN 55301 www.jointpowerswaterboard.com TO : Chad Hausmann, Wright Co. Highway Engineer FROM : John Seifert, JPWB General Manager DATE : April 23, 2026 SUBJECT : Joint Powers Water Board’s staff review of Wright Co Rd 18 Improvement Project. Dear Chad Hausman, JPWB engineering and onsite staff have completed a review of the proposed County Road 18 pending improvements adjacent to the Joint Powers Water Board (JPWB) Water Treatment Plant. The following summarizes our comments and requested revisions based on the exhibits provided. Phase I Operations The “Figure 1” Exhibit illustrates Phase I operations as we currently understand the current 90% plan set. The current design will rely on staff temporarily stopping westbound traffic, closing one lane, and allowing chemical delivery vehicles to back into the site. While this approach is not ideal it is a slight improvement of the current condition that requires us to coordinate two way traffic stoppage. With this short-term solution, it is operationally feasible and safety concerns will still exist with the reliance on active traffic control and non-standard vehicle maneuvers. Future phases and onsite improvements to site circulation look to provide a long term solution. Requested Revisions to Phase I JPWB staff would respectfully request a revision to the 90% plans that pulls back the median to accommodate a potential three-quarter (3/4) access configuration in the future. This proposed future access would incorporate the current development concept that would include dedicating approximately 16.5 feet of right-of-way to JPWB to support the modified configuration. It is understood that if the development of the 20 Acres west of the JPWB plant should need access to County Road 18, the collective access control by the county and the site plan approval from the City of Albertville would have precedence. With the City of Albertville working with the site plan approval to provide future access to the JPWB site from the developers property, we would welcome the opportunity to continue to work with the City and the County to develop the final access as the development process unfolds. Joint Powers Water Board Tel. : 763-497-3611 11100 50th St NW Fax : 763-497-4908 Albertville MN 55301 www.jointpowerswaterboard.com Phase II Exhibits (Long-Term Operations) To better demonstrate long-term feasibility of the potential use of a ¾ Access to the JPWB site, staff has worked with the SEH traffic engineering to demonstrate the following turning movements that would provide long term improved site access and circulation. The following two additional Phase II exhibits show successful movements into and out of the site: ● One showing eastbound-to-northbound access into the site ● One showing westbound-to-northbound access into the site These exhibits look to demonstrate that site access can function effectively under future long term conditions. As with Phase I, these scenarios depend on whether the adjacent 20-acre development requires access in a different location further west. Summary Overall, JPWB staff would respectfully request the county consider refining the Phase I design to shorten the median in the current design to preserve flexibility for future access. Additional JPWB would request consideration in Phase II to allow the site access by way of a ¾ access to provide long-term operational viability. Again, understanding that coordination regarding the adjacent 20-acre parcel will be critical in determining the final configuration. We appreciate the opportunity to review these materials and look forward to continued coordination with Wright County. Please let us know if you have any questions or would like to discuss these comments further.