Loading...
1998-10-27 WC Dept of Hwy Access Permit V~TV ()~ (lO~ ~~~ \- ! ~ ~y 7856 WRIGHT COUNTY DEPARTMENT OF HIGHWAYS Jet. T.H. 25 and C.R. 138 Telephone (612)682-7383 Facsimile (612) 682-7313 WAYNE A. FINGALSON, P.E. Highway Engineer 682-7388 VIRGIL G. HAWKINS, P.E. Assistant Highway Engineer 682-7387 RICHARD E. MARQUETTE Right of Way Agent 682-7386 Wright County Public Works Building 1901 Highway 25 North Buffalo, Minnesota 55313 October 27, 1998 Mr. Scott Dahlke, P.E. Meyer-RohIin, Inc. 1111 Hwy. 25 North Buffalo, MN 55313 RE: Karston Avenue Access to CSAH 37 - Access Permit No. 9842 City of Albertville, Minnesota Dear Scott: It has come to our attention that the turn lanes along CSAH 37 for the above mentioned access may not meet the section requirements outlined in the approved permit. Two (2) separate sources have indicated to us that there are only about two (2) inches of class 5 aggregate base material in the turn lanes. We are concerned about the structural integrity of the turn lanes because, upon completion of construction, Wright County will be responsible for maintaining these turn lanes. We have the following concerns regarding these turn lanes which will require your immediate attention prior to placing bituminous pavement. 1) Permit requires that twelve (12) inches of class 5 aggregate material be placed as a base for the turn lanes. 2) Turn lanes should have been compacted. It appears that little compaction was done on the turn lanes. (The turn lanes appeared too soft to place bituminous pavement on.) What compactive efforts were done on these turn lanes? Who inspected the work, as the City inspector from S.E.H. said he did not, nor was he required to do so. 3) The existing RCP culvert under Karston Avenue is located only 31 feet from the centerline of CSAH 37, making a 4: 1 inslope impossible to achieve. The pipe will have to be removed and reinstalled further back from the centerline of CSAH 37. It appears that it will fit at about 48 feet from centerline. The original plan (part of the permit) indicated the pipe would be 40 ft. from the centerline of CSAH 37. Equal Opportunity I Affirmative Action Employer Page Two Scott Dahlke, Meyer-RohIin October 27, 1998 As the applicant on the permit application, it is the responsibility of Meyer RohIin to make sure that the access permit requirements are met. Until such time that the above work is completed, according to the permit requirements, we will respectfully request, by copy of this letter, that the City of Albertville not issue any building permits or occupancy permits for this development. Please call me at 682-7387 if you have any questions or require further information. Sincerely, 1) - ~ Virgil G. Hawkins, P.E. Assistant County Engineer cc: vtbavid Lund, City of Albertville Pete Carlson, City Engineer (SEH, Inc.) Bill Cordell, Senior Traffic Technician Wayne Fingalson, County Engineer Steve Meyer, Maintenance Superintendent Dick Marquette, Engineering Assistant File