1998-09-02 WSWCD Proposed Replacement Plan App
WRIGHT SOIL AND WATER CONSERVATION DISTRICT
'306C Brighton Avenue
Buffalo, Minnesota 55313
Telephone (612) 682-1933
682-1970
Fax (612)682-0262
September 2, 1998
Don Jensen
Pilot Land Development
13736 NE Johnson St.
Ham Lake MN 55304
RE: PROPOSED REPLACEMENT PLAN APPLICATION FOR KARSTON COVE
Dear Mr. Jensen:
Enclosed you will find the Technical Evaluation Panel (fEP) motion/recommendation which will
be submitted to the Wright Soil and Water Conservation District Board. The TEP's motion is as
follows: Motion by Richard Marquette and Seconded by Keith Grow to allow the project proposal
with the following contingencies:
. The 841 square foot impact to basin N be eliminated
. The impact to basin K due to Block 1 Lot 21 be eliminated
. The impact due to Lot 7-8 block 3 be eliminated by shifting entire building pads north orin
other manner which eliminates the impact.
. Road placement remain as planned with impact to basin O-Q remaining the same
. The proposed replacement 75% PVC credit via stormwater ponding will not be accepted,
therefore other replacement acreage will be needed
. Must comply with all replacement requirements of Army Corp of Engineers Permits
. All delineated wetlands and replacement wetlands must be protected via restrictive covenant
drainage easement or other form of permanent protection.
This motion will be submitted to the Wright SWCD Board, for the Board meeting on Monday
September 14, 1998.
Please feel free to contact this office if you have any questions or concerns regarding this matter
Sincerely,
,41M A~l
Mark McNamara
Resource Conservationist
Wright ~WCD