Loading...
1987-12-11 Prelim Cost Estimates MEYER-ROHLIN, INC. ENGINEERS-LAND SURVEYORS 11n Hwy. 25 N., Buffalo, Minn.55313 Phone 612- 682-1781 TO: Darkenwald Real Estate FROM: Meyer-Rohlin, Inc. RE: Preliminary Cost Estimates for Proposed Development Southwest corner of County Roads 19 & 37 DATE: December 11, 1987 The following are preliminary cost estimates for the proposed Phase I development based upon the sketch plan prepared by Meyer-Rohlin, Inc. (S-87120) . I. Development of Phase I (48 lots) Estimates include construction and engineering Sanitary Sewer Water Main Storm Sewer Streets (finished) Site grading @ @ @ @ @ $1,700.00/1ot $1,350.00/1ot $1,600.00/1ot $3,000.00/lot $l,OOO.OO/lot $S-:-650:-o5/1ot x 48 lots =$415,200.00 II. Extension of Water & Sanitary Sewer to the Phase I site: a) Lift Station & Force Main assess = b) Trunk from lift station to the 37 & 19 intersection = $420.00/ac $201.00/ac $621:-00/ac x 90+ acres = $ 55,890.00 c) Water & Sewer from 37 & 19 intersection to 48 lot Phase I - possible front foot assess = $_~~L~Q.Q.:..Q.Q. $556,590.00 Tflore p. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor