HomeMy WebLinkAbout2026-08-24 Joint Powers Water Board MinutesJoint Powers Water Board
Regular Meeting Minutes
August 24, 2026
1. Call to Order. The regular meeting of the Joint Powers Water Board was called to order by Chairperson
Amery, on Monday, August 24, 2026 at 6:00 p.m. at the Joint Powers Water Board Water Treatment
Plant, 11100 50th St NE, Albertville, MN 55301.
Board present: Mike Amery
Rob Olson, Zach Schoen, Ryan Gleason, Bob Zagorski
Board absent: Joe Hagerty, Gretchen Barrett
Staff present: John Seifert, General Manager
Staff absent: Dustin Carlson, Plant Supervisor, Ruth Klick, Project Associate
Engineering absent: Chris Larson, Short Elliott Hendrickson, Inc. (SEH)
2. Agenda
General manager Seifert introduced an additional item to be added at the recommendation of the
JPWB TAC to consider participating in a potential Solar Subscription. Gleason moved, Schoen
seconded to adopt the Agenda as amended. Motion to approve carried 5-0.
3. Consent Agenda
For item 3.1, Member Gleason stated he will need to abstain, as he was not at the August meeting.
Zagorski moved, Schoen seconded, Gleason abstained to approve the previous regular board meeting
minutes. Motion to approve carried 4-0-1.
For items 3.2-3.5, Zagorski moved, Schoen seconded, to approve the consent agenda as presented.
Motion to approve carried 5-0.
4. General Business
General manager Seifert presented the proposed request to replace seven large meters used to
measure raw well water and booster sub-meters. The project description highlights the maintenance
effort to proactively replace and upgrade prior to critical failure of the 27 year old equipment. The
regular preventative maintenance discovered that 3 of the 7 meters are currently starting to fail as they
could not be brought back in calibration.
A formal Memorandum of Understanding for the project was presented as the additional work was not
included in the regular 2026 Limit Budget for repairs.
Approval of MOU for Well Meter Replacement Project. Gleason moved, Schoen seconded, motion to
approve carried 5-0.
5. Engineer
None
6. Operations
None
7. Other Business
7.1 - SCADA Spare Parts Sale - Radwell Check
Staff confirmed the receipt of the sales proceeds previously authorized by the JPWB of the old SCADA
technology parts sold to Radwell International, as excess property from the JPWB SCADA upgrade
project completed in 2025. The check was slightly larger than the original quote as the equipment was
in good salable order and was received in the amount of $7,494.00. No Action Required information
only.
7.2 Solar Credits Contract.
General Manager Seifert presented the solar subscription proposed savings opportunity to the Board
after receiving direction from the full JPWB Technical Advisory Committee (TAC) on the subject. The
community solar savings report exhibit was presented on the proposed power purchase agreement
highlighting an annual savings in the amount of $6,726. With a projected 25 year savings at $168,154.
After consideration, Chair Amery requested clarification on the referenced JPWB TAC. To which,
General Manager Seifert explained the purpose of the JPWB TAC that meets on a quarterly basis to
review and recommend technical and monetary recommendations for the Board’s consideration.
After further discussion by the Board, a motion was made by Gleason and seconded by Zagorski to
approve the Solar Subscription Agreement pending final review by the JPWB attorney. The motion
carried 4-1 with Gleason, Schoen, Zagorski, and Olson voting yea, and Amery voting nay.
8. Adjournment
Schoen moved, Gleason seconded to adjourn the meeting at 6:25 PM. Motion carried 5-0.