2001-05-09 Street & Utilites Plan Review "'SeH MEMORANDUM 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 800.572.0617 320.229.4301 FAX TO: Linda Goeb City Administrator Albertville, Minnesota FROM: Peter J. Carlson, P.E. City Engineer DATE: May 9, 2001 RE: 2001 Towne Lakes Development Street and Utilities Plan Review Albertville, Minnesota SEH No. A-ALBEV 0009.00 14 I reviewed the plans and specifications dated 04/25/01, for the above referenced project and have the following comments: PLANS Sheet 2 1. As currently configured, Lake Towne Drive would cause confusion for emergency response personnel. The street names should be revised for example - existing East Lake Towne Drive and West Lake Town Drive. Sheet 4 2. Add a 12-inch gate valve at Station 9+00. Sheet 5 3. Add a 12-inch gate valve at Station 42+40. 4. The site work around the lift station shall be in accordance with the plan as prepared by our office. A copy of that plan sheet is attached. 5. All water services that are installed for irrigation purposes will need a meter. This meter can be installed at the time the irrigation system is installed. A note indicating the meter requirement shall be added in the appropriate locations on the plan sheets. Sheet 6 6. Add an 8-inch gate valve at approximately Station 30+85. 7. All water services that are installed for irrigation purposes will need a meter. This meter can be installed at the time the irrigation system is installed. A note indicating the meter requirement shall be added in the appropriate locations on the plan sheets. Short Elliott Hendrickson Inc. Your Trusted Resource Equal Opportunity Employer Street and Utilities Plan Review May 8, 2001 Page 2 Sheet 7 8. Move hydrant from the east lot line of Lot 1, Block 5, to the common lot line of Lots 2/3, Block 5. 9. Move water main high point to the hydrant location identified above. Sheet 9 10. Revise street elevation shown on typical section to match proposed street profile. Sheet 11 11. Add 25 feet of drain tile to upstream side of catch basins 96 and 97. Sheet 12 12. Add 50 feet of drain tile to upstream side of catch basins 58 and 59. Sheet 13 13. Add 25 feet of drain tile to each side of catch basin 78. SPECIFICA TIONS 1. The developer should be aware that the City Engineer's office provides full time on-site inspection for all projects within Albertville. Page SC-4 2. Add SEH as additional insured. Page SPV-6 3. The City requires all new sanitary sewer to be televised when construction is completed. This shall be added. Page SPU-I0 4. There are several water main specification revisions required. I have enclosed a standard specification that should be used as reference. 5. Also enclosed is a set of the City's standard details. These details shall be included with the finalized specification. Please call me if you have any questions (320.229.4320). Enclosures djg c: Mike Couri, City Attorney Cindy Sherman, City Planner Fran Hagen, Westwood (w/enclosures) Wayne Stark, SEH w:lalbevlOOO9lcorrl050701-city-m.doc