2001 Towne Lakes Development
Street and Utilities Plan Review
Albertville, Minnesota
SEH No. A-ALBEV 0009.00 14
I reviewed the plans and specifications dated 04/25/01, for the above referenced project and have
the following comments:
PLANS
Sheet 2
1. As currently configured, Lake Towne Drive would cause confusion for emergency response
personnel. The street names should be revised for example - existing East Lake Towne Drive
and West Lake Town Drive.
Sheet 4
2. Add a 12-inch gate valve at Station 9+00.
Sheet 5
3. Add a 12-inch gate valve at Station 42+40.
4. The site work around the lift station shall be in accordance with the plan as prepared by our
office. A copy of that plan sheet is attached.
5. All water services that are installed for irrigation purposes will need a meter. This meter can
be installed at the time the irrigation system is installed. A note indicating the meter
requirement shall be added in the appropriate locations on the plan sheets.
Sheet 6
6. Add an 8-inch gate valve at approximately Station 30+85.
7. All water services that are installed for irrigation purposes will need a meter. This meter can
be installed at the time the irrigation system is installed. A note indicating the meter
requirement shall be added in the appropriate locations on the plan sheets.
Short Elliott Hendrickson Inc.
Your Trusted Resource
Equal Opportunity Employer
Street and Utilities Plan Review
May 8, 2001
Page 2
Sheet 7
8. Move hydrant from the east lot line of Lot 1, Block 5, to the common lot line of Lots 2/3,
Block 5.
9. Move water main high point to the hydrant location identified above.
Sheet 9
10. Revise street elevation shown on typical section to match proposed street profile.
Sheet 11
11. Add 25 feet of drain tile to upstream side of catch basins 96 and 97.
Sheet 12
12. Add 50 feet of drain tile to upstream side of catch basins 58 and 59.
Sheet 13
13. Add 25 feet of drain tile to each side of catch basin 78.
SPECIFICA TIONS
1. The developer should be aware that the City Engineer's office provides full time on-site
inspection for all projects within Albertville.
Page SC-4
2. Add SEH as additional insured.
Page SPV-6
3. The City requires all new sanitary sewer to be televised when construction is completed. This
shall be added.
Page SPU-I0
4. There are several water main specification revisions required. I have enclosed a standard
specification that should be used as reference.
5. Also enclosed is a set of the City's standard details. These details shall be included with the
finalized specification.
Please call me if you have any questions (320.229.4320).