Loading...
2006-06-20 Trail Construction June 20, 2006 Mr. Adam Nafstad City of Albertville 5975 Main Ave. NE P.O. Box 9 Albertville, MN 55301 3030 Centre Pointe Drive Suite 800 Roseville, Minnesota 55113 telephone 6 5 1 . 5 5 6 . 4 5 5 0 facsimile 6 5 1 . 5 5 6 . 4 5 5 1 Re: Trail Construction - Towne Lakes 5th Dear Adam: Just a follow up from last night's City Council meeting regarding the trail proposed between Lots in Blocks 4 and 5. It is my understanding, per the city council, that the trail will go as originally proposed with flexibility granted for the slope of the trail. The City will allow slopes that will exceed handicap accessibility requirements (ADA), and that the city may sign the trail accordingly. The City also discussed the options of allowing the trail to be reduced in width to a 6 foot wide bituminous or 5 ft concrete walk to minimize impacts to existing and future homes adjacent the trail. We will explore these options from a construction and cost stand point. CPDC will begin scheduling the installation of the path from the park through Lots 5 and 6, Block 5. We met on site with the owner of Lot 6, "Joe" regarding construction of his fence and indicated he needed to stay off the city's trail easement which he agreed to. There will be some small utility pedestals that we will need to relocate in this area to continue the trail out to the sidewalk. I want to thank you for your assistance in this matter. I am also sorry to have brought this item before the council and put you thought the brain damage however, I do believe it was worth the exercise so future considerations by the council at the last minute hopefully will be avoided without the proper engineering analysis. I am confident with the above flexibility we can build a trail that will appease all. Sincerely ~ Cc Larry Kruse, City Administrator / John Becker, WSB