2004-05-19 Punch List PUNCH LIST OWNER CONTRACTOR SEH NO. OWNER NO. PROJECT City of Albertville Hennen Construction DATE OF CURRENT ISSUE DATE OF ORIGINAL ISSUE SUBSTANTIAL COMPLETION FINAL COMPLETION 05/19/04 05/19/04 A-ALBEV 0306 N/A 2002 Towne Lakes Second Addition, Albertville, MN Below is a list of items, which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Item Date Date No. Item Reviewed Comments Accented 1 Ensure all wires tied to hydrants and touch- up hydrant paint as needed. 2 Clean storm sewer as needed. 3 Replace/repair broken curb and sidewalk prior to wear course. Adjust manholes prior to wear course. If 4 wear course not on prior to snowfall, lower as needed for snow Dlowin{!. 5 Place wear course. 6 Clean all pickholes after wear course is placed. Re-pave lift station driveway as discussed 7 with Ken Schick (Westwood)-moved from Phase 1. 8 Gate valve at Block 10, Lot 14, has no nut nser. 9 Touch up grout on catch basins and manholes as needed prior to wear course. MH 26: Something sticking out between 10 bottom 2 sections. Contractor to verify if gasket or concrete and fix if necessary. 11 GV near MH 301 needs nut riser. 12 Adjust (lower) hydrant gate valve near MH 39. 13 Hydrant near MH 37 needs tuming--not square to road. 14 Clean MH 36, which has clumps of dirt on bench. 15 Adjust hydrant gate valve near MH 33. Valve box leaning and too low. 16 Clean MH 28. Flow from MH 29 to MH 28 blocked. 17 Contractor to determine why and correct (water built up in MH 29). 1 Item Date Date No. Item Reviewed Comments Accepted Clean sanitary sewer between MH 32 to 18 MH 28. Benches need clearing and water building up. 19 Find and raise gate valve for hydrant near MH42. 20 Find and raise gate valve between MH 40 and ex. MH 39. Gate valve intersections of West Laketown 21 Drive and Lakespur Green will not open- top too tight. 22 Find and raise gate valve for hydrant near ex. MH 37. 23 Clean MH 27 and replace self-sealing gasket on manhole lid. Flush and re-televise between MH 37 to 24 MH 35, MH 33 to MH 28, and MH 29 to MH28. Remove all silt fence once sufficient 25 vegetation is established. Contact Engineer prior to removal to ensure sufficient vegetation is established. PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. REMARKS: Issued By: Russ Bly Title: RPR djg c: Pete Carlson SEH Jim Schulz, SEH Russ Bly, SEH Larry Kruse, City of Albertville John Middendorf, City of Albertville Contractor Property Developers Co. Westwood Professional Services, Inc. Curt Hennen, Hennen Construction u:\alalbev\0306OO\specslpunchlistdoc 2