2003-12-10 Trunk Water Over Sizing Credit 4 , WOODSIDE COMMUNITIES~ OF MINNESOTA INC .. December 10,2003 Mr. Pete Carlson - City Engineer 1200 25th Avenue South PO Box 1717 St. Cloud, MN 56302 Mr. Larry Kruse - City Administrator 5975 Main Avenue NE. Albertville, MN 55301 RE: Trunk Water over sizinl! credit for Karston Cove 3rd Addition Dear Mr. Carlson, Couri and Kruse: In November, we completed work on 64th Street which provided us access for housing starts later in 2004 and water line looping in this frontage road connection for Highway 37. The water line connection is a trunk line of 12" which creates full design pressure and water quality for the residents of Karst on Cove Town homes and single family homes along Karston Avenue. Our work in the past and discussions with staff prior to construction have recognized that the differ~nce in costs paid 8" to 12" would be recognized in development contracts as a credit against the area charges for water. Bid amounts were close to $9,960.00 Keuchle Underground has completed the work and the lines are in service. The price between the 8" and 12" lines, gate valves and fittings are attached. I have requested a confirmation of actual lineal footage and gate valy:fsinstalled, and a proration of from Jason McCarty of Westwood Engineering, the project design engineer. This amount should be recognized as a credit againstwatetllrea charges for the site. credits exceed the area charges, we are reqllestihgt~~!they be used to lower the area charges which will also be present fOI th~project. Please confirm any new fees or chargesth~tWill imp~dtStlf~lldget as we submit in early 2004. These should~l'l.~.~~q5a comment a~itoth atio of sur remaining private streets of the tO~~~TI1rs to be construct.e current letter of credit for site work, erosi~~~~~trol and misc. fee pa ..... de Albertville which will remain i~to!cc~jthroughout the project li about this request, please cont~Gtm<::' Since.. ..r. ely, .'1 );...... fku~ Donald Jensenlj Vice President of \\FSOl \LandDev\LETTERS general\Projects\ALBRTVLE\KarstonCove Utility Credit-03.doc 13736 N.E. Johnson Street. Ham LaKe, MN 55304 tel: 763.757.4052 fax: 763.757.4094 ,.........'..'.".I.1O~ ......,..........1...... ~ December 12, 2003 Peter Carlson City Engineer SEH, Inc. 1200 25th Avenue South St. Cloud, MN 56301 Re: Karston Cove 3rd Addition, Albertville MN Trunk Water Main Oversizing Credit Dear Mr. Carlson: Ref: 20031080 The following is a summary of the trunk water main oversizing credit due for this project. It is our understanding that the developer, Woodside Communities of Minnesota, would like this credit applied to future development fees for this project as it progresses with an updated site plan, and related construction activities, in 2004. As Constructed with 12" Diameter Trunk, Per Plan Item 12" PVC Water Main 12" Gate Valve Fittings Quantity 576 Linear Feet 2 Each 769 Pounds With Standard 8" Diameter Water Main Item 8" PVC Water Main 8" Gate Valve Fittings Quantity 576 Linear Feet 2 Each 558 Pounds Trunk Water Main Oversizinl! Credit Contract Unit Price $22.00/ L.F. $1,900.00/ Each $2.06/ Pound Total Cost = Contract Unit Price $15.00/ L.F. $1,100.00/ Each $2.06 / Pound Total Cost = Cost $12,672.00 $3,800.00 $1,584.14 $18,056.14 Cost $8,640.00 $2,200.00 $1,149.48 $11,989.48 $18,056.14 (12" Trunk) - $11,989.48 (8" Standard) = $6,066.66 Trunk Water Main Oversizing Credit We hope this summary adequately details the calculations used to determine the credit. Feel free to call with any questions or comments you may have at 952-906-7446. Thank you. Sincerely, WESTWOOD PROFESSIONAL SERVICES, INC. Jason M. McCarty, P.E. Project Manager Cc: Mr. Don Jensen, Woodside Communities of Minnesota l. 09/08/03 18:J8 FAX 952 937 5822 WESTWOOD PROF. SERVICES ~ 0011005 /' i Westwood Professional Services, Inc. PLANNING. ENGINEERING. SURVEYING "~ FACSIMILE TRANSMITTAL 7599 Anagram Drive Eden Prairie, MN 55344 Phone: 952-937-5150 Fax: 95Z-937-5822 Toll free: 1-888-937-5150 E-mail: wps@westwoodps.com Date: September 8, 2003 J:::D,....l ..J.8J:eme1(uechle Keuchle Underground Inc (320) 398-8889 BRAINERD lWlN CITlESIMETRO ST. CLOUD To: From: Jason McCarty Regarding: Karston Cove 3rd Addition Project No.: 20031080 Number of pages including this cover letter 5 Please call 952-937-5150 if you do not receive all pages or experience difficulty receiving this transmission. Purpose: Other (see remarks) Remarks: Don, --------" _YY....~are preparin.-9..,the contracts f9! the project. There are a few mi-nor chal'lg~s to the bid that we need unit prices for. Items are highljghted on the followin~LQages. They inclY_cte the__ __.fQ!]ow.lD.g~_~.__._____.____.___,__~__._._.____,__.______._..___._...._~..-..-,-.-.-----------.--.....-'----.---.--..-- ._~..YY....~.!?_,____p:y...9_Yi~teI~m~IQIii~!~i~Qf..QIE:~~1~r._m~I6~-_-:==~===.~~::~===::~-~~:=:.::~=-~=::=:==~=:=:::~==: ._.__._j/yJ'!'ttt!..-----.Eyg-jY~!~r.-I!}!3..i.D-.lo..~t~-~9-QtQJf-Y.!f9.1~L!!gl.in.._,__._._,.__________.,_....._,_________.___.---------.- _.__._VY.Mtt~_______~~g_~~!~L.m.?jn..llJ~1~9.P._9..tP1E.~?1~LI!IJ~j~------_.--....-.-.-..._.------------------------.--..-- WM #7 New hydrant added through City review WM #8 8" Qate valves added through City review Please add unit prices to the above reference items and return the form to our office. If the prices are acceptable, we will prepare the contracts. Feel free to call with 9.DL~stions or comments you may hay~ at 952-906-74~6. Thank you,,--_ Jason McCarty ..M__________._.____________.___.~______..__._ ._._~----~_.._----------_._~....._------ Copy to: Don Jensen, Woodside Communities (fax: (763) 757-4094) Designing the Future Today....<ince 1972 THE INFORMATION CONTAINED IN THIS FACSIMilE MESSAGE IS LEGALLY PRIVILEGED AND CONFIDENTIAL INFORMATION INTENDED SOLELY FOR THE USE OF THE PERSONS OR ENTITIES NAMED ABOVE. IF YOU ARE NOT SUCH PERSONS OR ENTITIES, YOU ARE HEREBY NOTIFIED THAT ANY DISTRIBUTION, DISSEMINATION OR REPRODUCTION OF THIS FACSIMILE MESSAGE IS STRICTLY PROHIBITED. IF YOU HAVE RECEIVED THIS MESSAGE IN ERROR, PLEASE IMMEDIATELY CALL US COLLECT AT (952) 937-5150. 09/08/03 18:19 FAX 952 937 5822 I \ WESTWOOD PROF. SERVICES 141 003/005 ( 09/08/03 18:19 FAX 952 .937 5822 WESTWOOD PROF. SERVICES @] 002/005 /- ( PROPOSAL FOR SANITARY SEWER, WATER MAIN, AND STORM SEWER CONSTRUCTION KARSTON COVE 3RD ADDITION, ALBERTVILLE, MINNESOTA Revised 8/27103 Engineer's Project No. 20031080 Proposal of: Keukle Underground Address: 20 Main Sl. N P.O. Box 509 Kimball, MN 55353 Bid is due on Thursday, the 28th day of August, Z003 at 2:00 P.M. at Westwood Professional Services, Inc., }599 Anagram Drive, Eden Prairie, MN 55344 Phone Number (952) 937-5150 Faxed bids are allowed on this project (Westwood fax number: 952-937-5822). Gentlemen: We propose to enter into a contract wilh the OWNER to furnish and deliver all material and equipment and perfonn all work, as noted in the plans and specifications prepared by Westwood Professional Services. No. Item Unit Qty. Price Price SANITARY SEWER Install Silt Fence LF 650.0 $2.00 $1,300.00 2 Remove 12" rye Existing Sanitary Sewer LF 16.0 $5.20 $83.20 3 Connect to Existing Manhole, Reform Invert EACH 1.0 $780.00 $780.00 4 8" PVC SDR 35 Sanitary Sewer (10'_12' Depth) L.F. 428.0 $21.00 $8,988.00 5 8" PVC SDR 35 Sanitary Sewer (12'-14' Depth) L.F. 394.0 $23.00 $9,062.00 6 Standard 48" Diameter Manhole (0-8' Depth) EACH 4.0 $1,700.00 $6,800.00 7 Extra Depth 48" Diameter Manhole (+8' Depth) V.F. 16.0 $64.00 $1,024.00 8 Install 8" PVC Plug EACH 5.0 $65.00 $325.00 9 Trench Stabilization Aggregate (SOO#/L.F.) TON 206.0 $0.01 $2.06 10 Televise Sanitary Sewer L.F. 822.0 $1.50 $1,233.00 Sanitary Sewer Total $29,597.26 AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE . THIS AGREEMENT is dated as of the 11 th day of September in the year 2003 by and between Woodside Communities of Minnesota Inc (hereinafter called OWNER) and Kuechle Underground, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK. 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Utilities and Streets, Karston Cove 3rd Addition, Albertville, MN ARTICLE 2. THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the part is generally described as follows: Utilities and Streets, Karston Cove 3rd Addition, Albertville, MN. ARTICLE 3. ENGINEER 3.01 The Project has been designed by Westwood Professional Services, Inc., 7599 Anagram Drive, Eden Prairie, MN 55344, who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 4. CONTRACT TIMES. 4.01 Time ofthe Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as state in the Contract Documents are of the essence of the Contract. 4.02 Days to Achieve Substantial Completion and Final Payment A. The Work will be substantially completed on or before the date stated in the Bid Proposal and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions on or before the date stated in the Bid Proposal. 4.03 Liquidated Damages A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer [mancialloss if the W o~k is not com]>leted withll the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense and difficulties involved in A-I IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in triplicate. One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions ofthe Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or identified by ENGINEER on their behalf. This Agreement will be effective onSe...fJ'Y, /1 ;)063 (which is the Effective Date of the Agreement). / ) E COM ES OF MINNESOTA 1- .#t--. Title: VI Ct ~ /J~f' A::0~ rfl K~: UNDERGROUND, me. By: ~ cc~- f1/~.d-Y: Title: By: Attest /~-Ar? ~ A-6 Sanitary Sewer Total $29,597.26 Water Main Total $34,537.66 Storm Sewer Total $35,366.46 Street Total $126,432.70 GRAND TOTAL $225,934.08