Loading...
2004-07-27 Specs Street & Utility Improv Project I I I I I I I I I I I I I I I I I I I SPECIFICATIONS FOR KARSTON COVE THIRD ADDITION STREET AND UTILITY IMPROVEMENT PROJECT ALBERTVILLE, MINNESOTA MEYER-ROHLIN, INC. ENGINEERS AND LAND SURVEYORS 1111 HIGHWAY 25 NORTH BUFFALO, MINNESOTA 5531313 JULY 27, 2004 Project No. 04137 I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Lie. No. 6218 I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS Ins t ru c t ion to B i dde r s .............................................................................. . P ropo s a 1 F 0 rm......................................................................................................... . Con t r act ........................................................................................................................ . Gene r a 1 Condi t i ons.......................................................................................... . Supplemental General Conditions.................................................... Spec i a 1 Prov is i ons.......................................................................................... . Joint Powers Water Board......................................................................... S t re e t S pe c i f i cat ion s ................................................................................. . Concret e Spe c i fica t ions........................................................................... . Standard Ut i 1 i ty Speci f icat ions ................................................. Exc a va t i on and Embankment......................................................................... pag e s 1- 2 Lawn sand G r ass e s................................................................................................ . p age s 1 - 2 pages 1-3 pages 1-2 pages 1-2 pages 1-42 pages 1-9 pages 1-9 pages 1-45 pages 1-9 pages 1-4 pages 1-59 I I I I I I I I I I I I I I I I I I I INSTRUCTIONS TO BIDDERS In 'order for proposals to be entitled to consideration, they must be m accordance with the following instructions: A. GENERAL All proposals shall be submitted on forms furnished by the Engineer. All information, lump sums and unit prices requested shall be completely fllled out by typewriter or in ink. All corporation bids shall bear the official seal of the corporation. The bid shall be submitted on the unbound proposal forms. A proposal may be withdrawn without prejudice to the bidder by written request prior to the hour of the letting. Proposals so withdrawn may be re-submitted at any time prior to the time set for opening of proposals. The Owner reserves the right to reject any or all proposals and to waive any informalities and irregularities in the bidding. B. OUALIFICA TrONS OF BIDDERS All bidders shall submit information necessary to satisfy the Owner that the bidder is adequately prepared to fulfill the contract. Such information shall include past performance records, lists of available personnel, plants and equipment, financial statements, or any other pertinent information. C. PREP ARATrON OF PROPOSAL The bidder shall submit his proposal on the forms provided by the Engineer. The blank spaces on the proposal shall be filled in correctly for every item for which a quantity is given, and the bidder shall state the prices for which he proposes to do each item of work. The bidder's proposal shall be signed correctly in ink. The signature acknowledges that the bidder is providing the information required and has received all Addenda to t.he Specifications. D. SUBCONTRACTORS The names and addresses of all subcontractors that the bidder intends to employ on the project shall be listed in the spaces provided on the proposal form. No other subcontractors shall be used on the project without the written approval of the Engineer. E. BID SECURITY Each bid shall be accompanied bv a certified check. cashier's check. or bidders bond in the amount of five (5%) of the bid. as a guarantee that the bidder will enter into the proposed contract within the time specified. Should the bidder whose proposal has been accepted by the Owner refuse, fail or neglect to execute the contract and furnish a satisfactory surety bond, it is understood and agreed between the Owner and said accepted bidder that the five (5%) percent of bid security shall be the amount of the liquidated damages occasioned by such refusal, failure, or neglect; and that thereupon said Owner shall realize on such bid security and use the proceeds in payment of said damages. The bid security accompanying rejected bids will be promptly returned to the bidders upon the execution of a contract or the rejection of bids. ", " 1 I I I I I I I I I I I I I I I I I I I F. PLANS 1illD SPECIFICATIONS Copies of proposal forms, Plans and Specifications, for use by contractors submitting a bid, may be obtained from Meyer- RoWin, Inc., 1111 Highway 25 North, Buffalo, J'v.[N' 55313, on deposit of the sum of Forty Dollars ($40.00). This deposit will not be refundable. G. EXAMINATION OF SITE AND DOCUMENTS Bidders shall satisfy themselves by a personal examination of the site as to all local conditions affecting the performance of the Contract, such as the structure of the ground, the existence of surface and ground water, availability of drainage, obstacles which may be encountered, means of approach to the site, and the manner of delivery and handling of materials. The bidder, in submitting his proposal, is deemed to accept all conditions as the same as are eventually found to e.-ust and to waive all claim for extra compensation arising from the encountering of unforeseen difficulties except as the same are expressly provided for in either the Specifications or the contract. Bidders shall also carefully examine the Plans and. read the Specifications before submitting bids on the work to be done. If any bidder contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the Plans, Specifications, or other proposed contract documents, he may submit to the Engineer a written request for an interpretation thereof. The clarification of the proposed documents will be made only by an addendum duly issued. A copy of such an addendum will be mailed, faxed, or delivered to each person receiving a copy of the Plans and Specifications or to such other prospective bidders as have requested that they be furnished with a copy of such an addendum. All addenda issued to bidders prior to the date of receipt of proposals shall become a part of the contract documents, and all proposals are to include the work therein described. Each proposal. submitted shall list all addenda by- number which have been received prior to the time scheduled for receipt of proposals. H. ADHERENCETOSPEC~CATIONS All work shall be done in strict accordance with the Specifications and Plans and such addenda as may be issued from time to time by the Engineer. Bidders shall be held strictly to the intent of the Plans and Specifications. I. REJECTION OF BIDS The right is reserved to reject any or all bids or to accept such bid, as in the opinion of the Owner will be to the best interests of the Owner. No bidder may withdraw his bid for at least thirty (30) days after the scheduled closing time for the receipt of bids. J. CONDITIONS IN BIDDER'S PROPOSAL The bidder shall not stipulate in his proposal any conditions not provided for on the proposal form. K INTERPRETATION OF ESTIMATES Bidders shall examine to their satisfaction the quantities of work to be done, as determined from the Plans and Specifications. The Engineer's estimate of quantities as shown on the proposal shall be used as a basis of calculation upon which the award of contract will be made, but these quantities are not guaranteed to be accurate and are furnished without any liability on the part of the Owner or Engineer. Bidders must rely on their own calcu1ationsaoqd shan, be thoroughly familiar with the contract documents., 2 I I L. DELIVERY OF PROPOSALS All bids shall be placed in a sealed envelope with a statement thereon showing the work covered by the bid and addressed to the address stipulated in the Request for Bids. Proposals may be mailed or submitted in person. No vroposals received via facsimile shall be accepted. No bids will be received after the time set for receiving them. Bids arriving by mail at the office of the Owner after the hour designated for receiving bids will be returned to the sender unopened. The Engineer will not deliver bids to the place of the bid opening. I I I M. RETECTION OF PROPOSALS Proposals may be rejected if they show any omission, alteration of form, additions not called for, conditional bids or alternate bids. not specified,. or irregularities. of any kind. Proposals in which the prices. are obviously unbalanced may be rejected. I I N. DISOUALIFICA TrON OF BIDDERS More than one proposal for the same project from any individual flrIll, partnership or corporation under the same or different names will not be considerecLCollusion between the bidders will be considered sufficient cause for the rejection of all bids so affected. I Failure on the part of any bidder to carry out previous contracts satisfactorily, or his lack of experience or equipment necessary for the satisfactory completion of the work, may be deemed sufficient cause for his disqualification. I O. UNIT PRICES In case of error in the extension of prices, the unit bid prices shall govern. The Owner reserves the right to waive any informality in the bids at his discretion. I I I I I I I " >\ I I 3 I I PROPOSAL FORM FOR KARSTON COVE THIRD ADDITION Street & Utility Improvement Project Albertville, Minnesota 7/27/04 I I Bids are due on or before 2:00 PM, August 06, 2004 at the office of Meyer-Rohlin. I I I I Owner: Woodside Communities of Minnesota, Inc. 13736 N.E. Johnson Street Ham Lake, MN 55304 Engineer: Meyer-Rohlin, Inc. 1111 Highway 25 North Buffalo, MN 55313 The undersigned, as bidder, hereby proposes and, if this proposal is accepted, agrees to furnish bonds as required and to enter into a contract with the Owner to furnish all materials, labor, skill, tools and equipment for the complete construction of streets and utilities, including all accessories as called for by the Specifications herewith, as prepared by Meyer Rohlin, Inc., Engineers and Land Surveyors, 1111 Highway 25 North, Buffalo, MN, 55313, acting as and in these contract documents entitled as the Engineer for the following estimated quantities and unit prices. Bid Submitter: Date: BID A - SANITARY I I I I I I I I Unit Total No. Item Otv. Unit Price Price 1 Connect to Exiting 8" Sanitarv 4 EA 2 8" PVC, SDR 35, (0' - 8') 540 LF 3 8" PVC, SDR 35, (8' - 10') 210 LF 4 8" PVC, SDR 35, (10' - 12') 308 LF 5 8" PVC, SDR 35, (12' - 14') 28 LF 6 48" Manhole (0-8') 11 EA 7 48" Manhole Extra Depth 34 LF 8 8" Manhole Outside Drop - 2' 5 EA 9 8" Outside Drop Extra Depth 18 LF 10 Sanitarv Service Group - 4" 43 EA 11 4" PVC, SDR 26, Riser Pipe 113 LF 12 4" PVC, SDR 26, Service Pipe 1292 LF 13 T elevisina 1086 FT I I I I BID A - SANITARY TOTAL BID B - WATERMAIN Unit Total No. Item Ot . Unit Price Price 1 Connect to Existing 8" Water Main 4 EA 2 6" C-900 PVC Watermain 55 LF 3 8" C-900 PCV Watermain 1070 LF 4 8" Gate Valve, Box & Riser 1 EA 5 8" DIP Fittin s 17 EA 6 H drant wi 6" Gate Valve 4 EA 7 Water Service Grou 1" 43 EA 8 Cop er Service Pipe 1" 1340 LF 9 Water Service Group 2" 1 EA BID B - WATERMAIN TOTAL Page 1 I I I I I I I I I I I I I I I I I I I 7/27/04 BID C . STORM DRAIN Unit Total No. Item Q. Unit Price Price 1 12" HOPE all de ths 270 LF 2 12" Metal FES wi Trash Guard 1 EA 3 12" RCP, Class III, (all depths) 243 LF 4 12" RCP FE wi Trash Guard 1 EA 5 15" RCP, Class III, (all de ths) 102 LF 6 15" RCP FE wi Trash Guard 1 EA 7 2'x3' Catch Basin 3 EA 8 48" Catch Basin 0-5') 4 EA 9 48" Storm Manhole 1 EA 10 Rip Rap, CL II w/Geotextile Fabric 12 CY 11 1" - 3" Sewer Rock 200 CY BID C . STORM DRAIN TOTAL BID 0 . STREETS Unit Total No. Item Qtv. Unit Price Price 1 Subgrade Preparation 3863 SY 2 Class 5 Base (CV) 644 CY 3 Select Granular Material (CV) 1288 CY 4 Curb & Gutter B618 149 LF 5 Concrete Cross Gutters 4 EA 6 Curb & Gutter, 28" Surmountable 2585 LF 7 Type 31 Bituminous Base 4305 SY-IN 8 Tvpe 41 Bituminous Wear 4305 SY-IN 9 Geotextile Fabric Type 5 0 SY 10 4" Concrete Sidewalk, 5' Wide wi Ped Ramps 2776 SF 11 Adjust Manhole 10 EA 12 Adjust Gate Valve 1 EA BID 0 . STREETS TOTAL BID E . EROSION CONTROL No. Item 1 Erosion Control Bale Checks 2 Erosion Control Silt Fence 3 Wood Fiber Blanket 4 Seed, Fertilizer, Mulch Unit Q . Unit Price 100 LF 300 LF 100 SY 1 AC BID E. EROSION CONTROL TOTAL Total Price GRAND TOTAL Page 2 I I I I I I I I I I I I I I I I I I I Subcontractors to be used in the work ~ be shown below. Name Address Name Address If this proposal is accepted, the bidder agrees to commence work and to complete all work according to the schedule in the special provisions. This proposal is submitted after careful study of the plans and specifications and from a personal knowledge of the conditions, both surface and subsoil, at the various sites, which knowledge was obtained from the undersigned's own sources of information and not from any official or employee of the Owner. The undersigned does declare this proposal is made without improper connection with any other person or persons making a proposal on this same contract and is in all respects fair and without collusion or fraud and the undersigned does further, declare that no person or persons acting in any official capacity for the Owner is directly or indirectly interested in the proposal herein or in the supplies or works to which it relates or in any portion of the profits thereof. It is understood and agreed that this proposal cannot be withdrawn within thirty (30) days after the opening of bids without the consent of the Owner and that the Owner has the right to accept the lowest responsive-responsible bidder or reject any orall proposals. ADDENDUM RECEIPT The receipt of the following Addenda to the Specifications is acknowledged. Addendum No._Date Addendum No._Date Legal Name of Person, Firm or Corporation BY ADDRESS PHO:N~ I I I I I I I I I I I I I I I I I I I CONTRACT AGREEMENT KARSTON COVE THIRD ADDITION STREET AND UTILITY IMPROVEMENT PROJECT THIS AGREEMENT, made and entered into as of the 2004, by and between called the Contractor, and WOODSIDE KARSTON COVE, called the Owner. day of hereinafter LLC, hereinafter WITNESSETH: That the Contractor and the Owner for the considerations hereinafter agree as follows: ARTICLE 1 - SCOPE OF WORK The Contractor shall furnish all of the material and perform all of the work shown on the plans and drawings as described in the specifications entitled, "KARSTON COVE THIRD ADDITION STREET AND UTILITY IMPROVEMENT PROJECT", as prepared by Meyer-Rohlin, Inc., Engineers and Land Surveyors, 1111 Highway 25 North, Buffalo, Minnesota, acting as and in these contract documents entitled "Engineer" . ARTICLE 2 - COMPLETION OF WORK The Contractor shall complete the work as specified within the specifications. ARTICLE 3 - THE CONTRACT SUM The Owner agrees to pay and the Contractor agrees to receive and accept payment in accordance with the unit prices bid and based upon the estimated quantities for the combined estimated sum as set forth in the accepted Contractors Proposal on file with the Owner, to be ',,; ($ ) . I I I I I I I I I I I I I I I I I I I ARTICLE 4 - CONTRACT DOCUMENTS The Contract Documents shall consist of the following component parts: 1) The Accepted Proposal 2) Instructions to Bidders 3) Contract Agreement 4) General Conditions 5) Supplemental Conditions 6) Special Provisions 7) Joint Powers Water Board 8) Street Construction Specifications 9) Concrete Curb Specifications 10) Standard Utility Specifications 11) Excavation and Embankment 12) Lawns and Grasses 13) Plan Sheets - 04137 This Instrument, together with the documents above mentioned, form the Contract, and they are as fully a part of the Contract as if hereto attached or herein repeated. ARTICLE 5 - PAYMENTS The Contractor shall submit monthly requests for payment to the Engineer, as per specifications, including lien waivers requesting payment for all materials, and labor expended for the payment period. The Owner will retain five (5%) percent of the amount of the payment until full completion of the Contract. IN WITNESS WHEREOF, the instrument to be executed as written. parties of the hereto day and have year caused first this above WOODSIDE KARSTON COVE, LLC .fi. BY BY I I I I I I I I I I I I I I I I I I I SPECIFICATIONS FOR KARSTON COVE THIRD ADDITION STREET AND UTILITY IMPROVEMENT PROJECT ALBERTVILLE, MINNESOTA MEYER-ROHLIN, INC. ENGINEERS AND LAND SURVEYORS 1111 HIGHWAY 25 NORTH BUFFALO, MINNESOTA 5531313 JULY 27, 2004 Project No. 04137 I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Lie. No. 6218 I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS Ins t ru c t ion to B i dde r s ............................._......._...................................... . P ropo s a 1 F 0 rm........................................................_...._......................................... . Con t r act ............................._......................................................................................... . Gene r a 1 Co nd i t i ons ......................._................................................................. . Supplemental General Conditions.................................................... S pee i alP rov i s ions .......................................................................................... . Joint Powers Water Board......................................................................... S t re e t S pee i fie a t ions ................................................................................. . Con ere t e S pee i fie a t ion s ........_................................................................. . S t anda rd Uti 1 it Y S pee i fie at ions ........_....................................... Exc a vat ion and Embankmen t ........................................................................ . p age s 1 - 2 La wn sand G r ass e s...................._...._........................................_......................_.. . p age s 1 - 2 pages 1-3 pages 1-2 pages 1-2 pages 1-42 pages 1-9 pages 1-9 pages 1-45 pages 1-9 pages 1-4 pages 1-59 I I INSTRUCTIONS TO BIDDERS I In . order for proposals to be entitled to consideration, they must be m accordance with the following instructions: I A. GENERAL All proposals shall be submitted on forms furnished by the Engineer. All information, lump sums and unit prices requested shall be completely filled out by typewriter or in ink. All corporation bids shall bear the official seal of the corporation. The bid shall be submitted on the unbound proposal forms. I I I A proposal may be withdrawn without prejudice to the bidder by written request prior to the hour of the letting. Proposals so withdrawn may be re-submitted at any time prior to the time set for opening of proposals. The Owner reserves the right to reject any or all proposals and to waive any informalities and irregularities in the bidding. I B. QUALIFlCA TrONS OF BIDDERS All bidders shall submit information necessary to satisfy the Owner that the bidder is adequately prepared to fulfill the contract. Such information shall include past performance records, lists of available personnel, plants and equipment, financial statements, or any other pertinent information. I C. PREP ARA TrON OF PROPOSAL The bidder shall submit his proposal on the forms provided by the Engineer. The blank spaces on the proposal shall be filled in correctly for every item for which a quantity is given, and the bidder shall state the prices for which he proposes to do each item of work. I The bidder's proposal shall be signed correctly in ink. The signature acknowledges that the bidder is providing the information required and has received all Addenda to ~he Specifications. I I D. SUBCONTRACTORS The names and addresses of all subcontractors that the bidder intends to employ on the project shall be listed in the spaces provided on the proposal form. No other subcontractors shall be used on the project without the written approval of the Engineer. I I I E. BIDSECURITY Each bid shall be accompanied bv a certified check. cashier's check. or bidders bond in the amount of five (5%) of the bi as a arantee that the bidder will enter into the ro osed contract within the time s ecified. Should the bidder whose proposal has been accepted by the Owner refuse, fail or neglect to execute the contract and furnish a satisfactory surety bond, it is understood and agreed between the Owner and said accepted bidder that the five (5%) percent of bid security shall be the amount of the liquidated damages occasioned by such refusal, failure, or neglect; and that thereupon said Owner shall realize on such bid security and use the proceeds in payment of said damages. The bid security accompanying rejected bids will be promptly returned to the bidders upon the execution of a contract or the rejection of bids. I , ~ I I 1 I I I I I I I I I I I I I I I I I I I I F. PLANS i\ND SPECIFICATIONS Copies of proposal forms, Plans and Specifications, for use by contractors submitting a bid, may be obtained from Meyer- Roblin, Inc., 1111 Highway 25 North, Buffalo, 1-.lJ:\I 55313, on deposit of the sum of Forty Dollars ($40.00). This deposit will not be refundable. G. EXA11INA TION OF SI1E AND DOCUMENTS Bidders shall satisfy themselves by a personal examination of the site as to all local conditions affecting the performance of the Contract, such as the structure of the ground, the existence of surface and ground water, availability of drainage, obstacles which may be encountered, means of approach to the site, and the manner of delivery and handling of materials. The bidder, in submitting his proposal, is deemed to accept all conditions as the same as are eventually found to exist and to waive all claim for extra compensation arising from the encountering of unforeseen difficulties except as the same are expressly provided for in either the Specifications or the contract. Bidders shall also carefully examine the Plans and read the Specifications before submitting bids on the work to be done. If any bidder contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the Plans, Specifications, or other proposed contract documents, he may submit to the Engineer a written request for an interpretation thereof. The clarification of the proposed documents will be made only by an addendum duly issued. A copy of such an addendum will be mailed, faxed, or delivered to each person receiving a copy of the Plans and Specifications or to such other prospective bidders as have requested that they be furnished with a copy of such an addendum. All addenda issued to bidders prior to the date of receipt of proposals shall become a part of the contract documents, and all proposals are to include the work therein described. Each proposal submitted shall list all addenda by number which have been received prior to the time scheduled for receipt of proposals. H. ADHERENCE TO SPECIFICi\.TIONS All work shall be done in strict accordance with the Specifications and Plans and such addenda as may be issued from time to time by the Engineer. Bidders shall be held strictly to the intent of the Plans and Specifications. 1. REJECTION OF BIDS The right is reserved to reject any or all bids or to accept such bid, as in the opinion of the Owner will be to the best interests of the Owner. No bidder may withdraw his bid for at least thirty (30) days after the scheduled closing time for the receipt of bids. J. CONDITIONS IN BIDDER'S PROPOSAL The bidder shall not stipulate in his proposal any conditions not provided for on the proposal form. K IN1ERPRETATION OF ESTIMA.1ES Bidders shall examine to their satisfaction the quantities of work to be done, as determined from the Plans and Specifications. The Engineer's estimate of quantities as shown on the proposal shall be used as a basis of calculation upon which the award of contract will be made, but these quantities are not guaranteed to be accurate and are furnished without any liability on the part of the Owner or Engineer. Bidders must rely on their own calculationsaog.d shal! be thoroughly familiar with the contract documents. '! 2 I I L. DELIVERY OF PROPOSALS All bids shall be placed in a sealed envelope with a statement thereon showing the work covered by the bid and addressed to the address stipulated in the Request for Bids. Proposals may be mailed or submitted in person. No proposals received via facsimile shall be accepted. No bids will be received after the time set for receiving them. Bids arriving by mail at the office of the Owner after the hour designated for receiving bids will be returned to the sender unopened. The Engineer will not deliver bids to the place of the bid opening. I I I M. RETECTION OF PROPOSALS Proposals may be rejected if they show any omission, alteration of form, additions not called for, conditional bids or alternate bids not specified, or irregularities of any kind. Proposals in which the prices are obviously unbalanced may be rejected. I I N. DISQUALIFICATION OF BIDDERS More than one proposal for the same project from any individual fIrm, partnership or corporation under the same or different names will not be considered. Collusion between the bidders will be considered sufficient cause for the rejection of all bids so affected. I Failure on the part of any bidder to carry out previous contracts satisfactorily, or his lack of experience or equipment necessary for the satisfactory completion of the work, may be deemed sufficient cause for his disqualification. I O. UNIT PRICES In case of error in the extension of prices, the unit bid prices shall govern. The Owner reserves the right to waive any informality in the bids. at his discretion. I I I I I I I 'j, ,. I I 3 I I I I I I I I I I I I I I I I I I I I 7/27/04 PROPOSAL FORM FOR KARSTON COVE THIRD ADDITION Street & Utility Improvement Project Albertville, Minnesota Bids are due on or before 2:00 PM, August 06, 2004 at the office of Meyer-Rohlin. Owner: Woodside Communities of Minnesota, Inc. 13736 N.E. Johnson Street Ham Lake, MN 55304 Engineer: Meyer-Rohlin, Inc. 1111 Highway 25 North Buffalo, MN 55313 The undersigned, as bidder, hereby proposes and, if this proposal is accepted, agrees to furnish bonds as required and to enter into a contract with the Owner to furnish all materials, labor, skill, tools and equipment for the complete construction of streets and utilities, including all accessories as called for by the Specifications herewith, as prepared by Meyer Rohlin, Inc., Engineers and Land Surveyors, 1111 Highway 25 North, Buffalo, MN, 55313, acting as and in these contract documents entitled as the Engineer for the following estimated quantities and unit prices. Bid Submitter: BID A - SANITARY Date: Unit Total No. Item Qtv. Unit Price Price 1 Connect to Exiting 8" Sanitarv 4 EA 2 8" PVC, SDR 35, (0' - 8') 540 LF 3 8" PVC, SDR 35, (8' - 10') 210 LF 4 8" PVC, SDR 35, (10' - 12') 308 LF 5 8" PVC, SDR 35, (12' - 14') 28 LF 6 48" Manhole (0-8') 11 EA 7 48" Manhole Extra Depth 34 LF 8 8" Manhole Outside Drop - 2' 5 EA 9 8" Outside Drop Extra Depth 18 LF 10 Sanitary Service Group - 4" 43 EA 11 4" PVC, SDR 26, Riser Pioe 113 LF 12 4" PVC, SDR 26, Service Pipe 1292 LF 13 Televisina 1086 FT BID B - WATERMAIN No. Item 1 Connect to Existin 8" Water Main 2 6" C-900 PVC Watermain 3 8" C-900 PCV Watermain 4 8" Gate Valve, Box & Riser 5 8" DIP Fittin s 6 Hydrant wi 6" Gate Valve 7 Water Service Grou 1" 8 Copper Service Pipe 1" 9 Water Service Group 2" Qt . 4 55 1070 1 17 4 43 1340 1 Page 1 BID A - SANITARY TOTAL Unit Unit Price Total Price EA LF LF EA EA EA EA LF EA BID B - WATERMAIN TOTAL I I I I I I I I I I I I I I I I I I I 7/27/04 BID C - STORM DRAIN Unit Total No. Item Otv. Unit Price Price 1 12" HOPE (all depths) 270 LF 2 12" Metal FES wI Trash Guard 1 EA 3 12" RCP, Class III, (all depths) 243 LF 4 12" RCP FE wI Trash Guard 1 EA 5 15" RCP, Class III, (all depths) 102 LF 6 15" RCP FE wI Trash Guard 1 EA 7 2'x3' Catch Basin 3 EA 8 48" Catch Basin (0-5') 4 EA 9 48" Storm Manhole 1 EA 10 Rip Rap, CL II w/Geotextile Fabric 12 CY 11 1" - 3" Sewer Rock 200 CY BID C . STORM DRAIN TOTAL BID 0 . STREETS Unit Total No. Item Oty. Unit Price Price 1 Subqrade Preparation 3863 SY 2 Class 5 Base (CV) 644 CY 3 Select Granular Material (CV) 1288 CY 4 Curb & Gutter B618 149 LF 5 Concrete Cross Gutters 4 EA 6 Curb & Gutter, 28" Surmountable 2585 LF 7 Type 31 Bituminous Base 4305 SY-IN 8 Type 41 Bituminous Wear 4305 SY-IN 9 Geotextile Fabric Type 5 0 SY 10 4" Concrete Sidewalk, 5' Wide wI Ped Ramps 2776 SF 11 Adiust Manhole 10 EA 12 Adjust Gate Valve 1 EA BID 0 . STREETS TOTAL BID E - EROSION CONTROL No. Item 1 Erosion Control Bale Checks 2 Erosion Control Silt Fence 3 Wood Fiber Blanket 4 Seed, Fertilizer, Mulch Unit Ot . Unit Price 1 00 LF 300 LF 100 SY 1 AC BID E. EROSION CONTROL TOTAL Total Price GRAND TOTAL Page 2 I I I I I I I I I I I I I I I I I I I Subcontractors to be used in the work must be shown below. Name Address Name Address H this proposal is accepted, the bidder agrees to commence work and to complete all work according to the schedule in the special provisions. This proposal is submitted after careful study of the plans and specifications and from a personal knowledge of the conditions, both surface and subsoil, at the various sites, which knowledge was obtained from the undersigned's own sources of information and not from any official or employee of the Owner. The undersigned does declare this proposal is made without improper connection with any other person or persons making a proposal on this same contract and is in all respects fair and without collusion or fraud and the undersigned does. further. declare that no person or persons acting in any official capacity for the Owner is directly or indirectly interested in the proposal herein or in the supplies or works to which it relates or in any portion of the profits thereof. It is understood and agreed that this proposal cannot be withdrawn within thirty (30) days after the opening of bids without the consent of the Owner and that the Owner has the right to accept the lowest responsive-responsible bidder or reject any orall proposals. ADDENDUM RECEIPT The receipt of the following Addenda to the Specifications is acknowledged. Addendum No._Date Addendum No._Date Legal Name of Person, Firm or Corporation BY ADDRESS PHONE I I I I I I I I I I I I I I I I I I I CONTRACT AGREEMENT KARSTON COVE THIRD ADDITION STREET AND UTILITY IMPROVEMENT PROJECT THIS AGREEMENT, made and entered into as of the 2004, by and between called the Contractor, and WOODSIDE KARSTON COVE, called the Owner. day of , hereinafter LLC, hereinafter WITNESSETH: That the Contractor and the Owner for the considerations hereinafter agree as follows: ARTICLE 1 - SCOPE OF WORK The Contractor shall furnish all of the material and perform all of the work shown on the plans and drawings as described in the specifications entitled, "KARSTON COVE THIRD ADDITION STREET AND UTILITY IMPROVEMENT PROJECT", as prepared by Meyer-Rohlin, Inc., Engineers and Land Surveyors, 1111 Highway 25 North, Buffalo, Minnesota, acting as and in these contract documents entitled "Engineer" . ARTICLE 2 - COMPLETION OF WORK The Contractor shall complete the work as specified within the specifications. ARTICLE 3 - THE CONTRACT SUM The Owner agrees to pay and the Contractor agrees to receive and accept payment in accordance with the unit prices bid and based upon the estimated quantities for the combined estimated sum as set forth in the accepted Contractors Proposal on file with the Owner, to be ($ ) . I I I I I I I I I I I I I I I I I I I ARTICLE 4 - CONTRACT DOCUMENTS The Contract Documents shall consist of the following component parts: 1) The Accepted Proposal 2) Instructions to Bidders 3) Contract Agreement 4) General Conditions 5) Supplemental Conditions 6) Special Provisions 7) Joint Powers Water Board 8) Street Construction Specifications 9) Concrete Curb Specifications 10) Standard Utility Specifications 11) Excavation and Embankment 12) Lawns and Grasses 13) Plan Sheets - 04137 This Instrument, together with the documents above mentioned, form the Contract, and they are as fully a part of the Contract as if hereto attached or herein repeated. ARTICLE 5 - PAYMENTS The Contractor shall submit monthly requests for payment to the Engineer, as per specifications, including lien waivers requesting payment for all materials, and labor expended for the payment period. The Owner will retain five (5%) percent of the amount of the payment until full completion of the Contract. IN WITNESS WHEREOF, the instrument to be executed as written. parties of the hereto day and have year caused this first above WOODSIDE KARSTON COVE, LLC ,$ BY BY