1998 Acknowledgement of Receipt of Payment
ACKNOWLEDGEMENT OF RECEIPT OF PAYMENT
Dennis Fehn Gravel and Excavating, Inc. acknowledges receipt of $45,880.25
from Donald G. Barthel and Betty L. Barthel in paYment for construction work performed
on Barthel's Bus Garage parking lot and building pad and 60th Street/Lachman Avenue.
This work was performed in 1998 by Dennis Fehn Gravel and Excavating, Inc. and
consisted of the work described on the attached Barthel Bus Garage TIF Work summary.
DENNIS FERN GRAVEL AND EXCAVATING, INe.
By: Gary Fehn
Its:
BARTHEl PVS GA6AG.E TIF W06K PER.fORMED av:
DENNIS FEHN GRAVEl & EXCAVATING, INC.
Quantity Unit
Building and Parking lot
Unit
Price
Total
Class Five
Subgrade Preparation
370 c.y."
5280 s.y.
$ 16.00 $
$ 2.00 $
5,920.00
10,560.00
Streets
Subgrade Preparation 1640 s.y. $ 2.00 $ 3,280.00
Class Five 683.5 c.y. $ 13.50 $ 9,227.25
Remove existing curb. 10 I.f. $ 5.00 $ 50.00
Remove existing asphalt 20 s.y. $ 2.50 $ 50.00
Granular borrow 550 c.y. $ 8.00 $ 4AOO.00
Geotextile Fabric Type V 1640 s.y. $ 1.20 $ 1,968.00
Grading
Common Excavating
Total Qualifying TIF Expenditures
4170 c.y.
$ 2.50 $ 10A25.00
$ 45,880.25