Loading...
1998 Acknowledgement of Receipt of Payment ACKNOWLEDGEMENT OF RECEIPT OF PAYMENT Dennis Fehn Gravel and Excavating, Inc. acknowledges receipt of $45,880.25 from Donald G. Barthel and Betty L. Barthel in paYment for construction work performed on Barthel's Bus Garage parking lot and building pad and 60th Street/Lachman Avenue. This work was performed in 1998 by Dennis Fehn Gravel and Excavating, Inc. and consisted of the work described on the attached Barthel Bus Garage TIF Work summary. DENNIS FERN GRAVEL AND EXCAVATING, INe. By: Gary Fehn Its: BARTHEl PVS GA6AG.E TIF W06K PER.fORMED av: DENNIS FEHN GRAVEl & EXCAVATING, INC. Quantity Unit Building and Parking lot Unit Price Total Class Five Subgrade Preparation 370 c.y." 5280 s.y. $ 16.00 $ $ 2.00 $ 5,920.00 10,560.00 Streets Subgrade Preparation 1640 s.y. $ 2.00 $ 3,280.00 Class Five 683.5 c.y. $ 13.50 $ 9,227.25 Remove existing curb. 10 I.f. $ 5.00 $ 50.00 Remove existing asphalt 20 s.y. $ 2.50 $ 50.00 Granular borrow 550 c.y. $ 8.00 $ 4AOO.00 Geotextile Fabric Type V 1640 s.y. $ 1.20 $ 1,968.00 Grading Common Excavating Total Qualifying TIF Expenditures 4170 c.y. $ 2.50 $ 10A25.00 $ 45,880.25