Loading...
2006-01-13 Street utilities - Densities ~ .- BRAUN INTERTEC Client: Rottlund Homes RECEIVED .!AN 2 0 2006 Building Inspectio~ f T "tt I Letter 0 ransml a Braun Intertec Project No: BL-04-05797B Transmittal No: Date: January 13,2006 To: Jon Sutherland City of Albertville 5915 Main Avenue Northeast Albertville, MN 55301 Braun Intertec Corporation 11001 Hampshire Ave. S. Minneapolis, MN 55438 Phone: 763-497-3384 Re: Towne Lakes, 6th Addition, County 19 and West Laketowne Drive, Albertville, MN ~ This Transmittal is being Sent: _ For your approval _ As requested Information Sent Street Utilities - Densities Reference Numbers Reports 1-5 I Transmittal List Jon Sutherland, City of Albertville Steve Hennen, Hennen Construction Company Tim Himmer,Rottlund Homes John Becker, Westwood Professional Services, Inc. C~ ftD?W\ W, \ 11..~IOb Sent By: Phone: Holly J. Vetter 952-995-2000 Rev. 8/6/04 ~ For your records For review Comments/Clarification Dated 1/9/06 I Information Sent Street Utilities - Densities (I) Street Utilities - Densities (I) Street Utilities - Densities (2) Street Utilities - Densities (I) ~ . Providing engineering and environmental solutions since 1957 BRAUN INTERTEC Braun Inter1ec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 Phone: 952.995.2000 Fox: 952.995.2020 Web: brauninlerlec.cam RECEIVED Report ofField Compaction Tests JAN 2 0 2006 Date: January 9, 2006 Building Inspections BL-04-05797B Report: Project: Client: Tim Himmer Rottlund Homes 3065 Centre Pointe Drive North Roseville, MN 55113 Project Description: Towne Lakes 6th Addition County 19 and West Laketowne Drive Albertville, Minnesota Inplace Specified Optimum Max. Lab Inplace Dry Relative Minimum Soil ID and Moisture* Dry Density* Moisture Density Compaction Compact. Test Date Type Classification (%) (pct) (%) (pct) (0/0) (%) Comments 1 10/10105 N P-4: SP 14.6 111.6 5 112 100 98 A 2 10/1 0105 N P-4: SP 14.6 111.6 5 111 99 98 A 3 10/10/05 N P-4: SP 14.6 111.6 4 III 100 98 A 4 10/10/05 N P-4: SP 14.6 111.6 4 112 100 98 A 5 10/1 0105 N P-4: SP 14.6 111.6 4 110 99 98 A 6 10/10105 N P-4: SP 14.6 111.6 5 110 99 98 A 7 10/1 0105 N P-4: SP 14.6 111.6 5 III 99 98 A Key: N = Nuclear, ASTM D 2922 SC = Sand Cone, ASTM D ,1556 * = a.M. and M.L.D.D. rounded to nearest 0.1 A = Test results comply with specifications. B = Test results do not comply with specifications. C = Test results comply with air-voids specifications. Test Test Location Elevation 1 2 3 4 5 6 7 Lot 12, Block IC: 8'W of Pipe (Pre-install Service Backfill) Lot 12, Block IC: I'N of Pipe (Pre-install Service Backfill) Lot 12, Block IC: I'S of Pipe (Pre-install Service Backfill) Lot 12, Block IC: 5'W of Pipe (Pre-install Service Backfill) Lot 13, Block IC: 5'W of Pipe (Pre-install Service Backfill) Lot 13, Block I C: l'S of Pipe (Pre-install Service Backfill) Lot II, Block IC: l'S of Pipe (Pre-install Service Backfill) 93 97 97 95 95 97 94 Elevation Reference: Top of water main shut-off= 100 c: Mr. Jon Sutherland, City of Albertville Mr. John Becker, Westwood Professional Services Mr. Steve Hennen, Hennen Construction Bmun lntortec ~tion d~'E Associate-Senior Engineer Prot'iding engineering and environmental solutions since 1957 BRAUN I NTE RTEC Braun Inter1ec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 Phone 952.995.2000 Fox: 952.995.2020 Web: braunintertec.cam Report of Field Compaction Tests Date: January 9,2006 BL-04-05797B Report: 2 Project: Client: Tim Himmer Rottlund Homes 3065 Centre Pointe Drive North Roseville, MN 55113 Project Description: Towne Lakes 6th Addition County 19 and West Laketowne Drive Albertville, Minnesota Inplace Specified Optimum Max. Lab Inplace Dry Relative Minimum SoillD and Moisture* Dry Density* Moisture Density Compaction Compact. Test Date Type Classification (%) (pct) (%) (pct) (%) (%) Comments 8 1011 I105 N P-4: SP 14.6 111.6 4 III 99 98 A 9 1011 I105 N P-4: SP 14.6 111.6 5 III 99 98 A 10 1011 I105 N P-4: SP 14.6 111.6 5 IlO 99 98 A II 10/1 I105 N P-4: SP 14.6 111.6 4 III 99 98 A 12 1011 I105 N P-4: SP 14.6 111.6 3 110 99 98 A 13 10111/05 N P-4: SP 14.6 111.6 4 III 99 98 A 14 10/1 I105 N P-4: SP 14.6 111.6 5 110 99 98 A Key: N = Nuclear, ASTM D 2922 SC = Sand Cone, ASTM 0 1556 * = a.M. and M.L.D.O. rounded to nearest 0.1 A = Test results comply with specifications. B = Test results do not comply with specifications. C = Test results comply with air-voids specifications. Test Test Location Elevation 8 Lot II, Block I C: 5'W of Pipe (pre-install Service Backfill) 9 Lot 10, Block I C: 1 'S of Pipe (Pre-install Service Backfill) 10 Lot 10, Block IC: 5'W of Pipe (Pre-install Service Backfill) 11 Lot 10, Block IC: 5'W of Pipe (Pre-install Service Backfill) 12 Lot II, Block IC: I'S of Pipe (Pre-install Service Backfill) 13 Lot 5, Block 1 C: 5'W of Pipe (Pre-install Service Backfill) 14 Lot 5, Block IC: l'S of Pipe (Pre-install Service Backfill) 94 97 94 97 98 1/2 94 94 Elevation Reference: Top of water main shut-off= 100 c: Mr. Jon Sutherland, City of Albertville Mr. John Becker, Westwood Professional Services Mr. Steve Hennen, Hennen Construction B,.un Iotertec ~at;oo ~~ &-, e Vlo ,PE Associate-Senior Engineer · Providing engineering and environmental solutions since 1957 BRAUN INTERTEC Report of Field Compaction Tests Date: January 9, 2006 Project: Client: Tim Himmer Rottlund Homes 3065 Centre Pointe Drive North Roseville, MN 55113 Braun Inter1ec Corporation 11001 Hampshire Avenue S Minneapolis. MN 55438 Phone: 952.995.2000 Fox 952.995.2020 Web: brauninlertec.cam BL-04-05797B Report: 3 Project Description: Towne Lakes 6th Addition County 19 and West Laketowne Drive Albertville, Minnesota Inplace Specified Optimum Max. Lab Inplace Dry Relative Minimum Soil ID and Moisture* Dry Density* Moisture Density Compaction Compact. Test Date Type Classification (%) (pct) (%) (pet) (%) (%) Comments 15 lOll 1/05 N P-4: SP 14.6 111.6 5 III 99 98 A 16 10/12/05 N P-4: SP 14.6 II 1.6 5 III 99 98 A 17 10/12/05 N P-4: SP 14.6 111.6 6 III 99 98 A 18 10/12105 N P-4: SP 14.6 111.6 4 110 99 98 A 19 10/12/05 N P-4: SP 14.6 111.6 4 112 100 98 A 20 10/12/05 N P-4: SP 14.6 111.6 3 III 99 98 A 21 10/12/05 N P-4: SP 14.6 111.6 3 IlO 99 98 A Key: N = Nuclear, ASTM D 2922 SC = Sand Cone, ASTM D 1556 * = a.M. and M.L.D.D. rounded to nearest 0.1 Test Location 15 Lot II, Block I C: 5'W of Pipe (Pre-install Service Backfill) 16 Lot 9, Block IC: 5'W of Pipe (Pre-install Service Backfill) 17 Lot 9, Block I C: 1 'S of Pipe (Pre-install Service Backfill) 18 Lot 8, Block IC: I'S of Pipe (Pre-install Service Backfill) 19 Lot 7, Block IC: I'S of Pipe (Pre-install Service Backfill) 20 Lot 7, Block IC: 5'W of Pipe (Pre-install Service Backfill) 21 Lot 7, Block I C: l'S of Pipe (Pre-install Service Backfill) Elevation Reference: Top of water main shut-off= 100 c: Mr. Jon Sutherland, City of Albertville Mr. John Becker, Westwood Professional Services Mr. Steve Hennen, Hennen Construction A = Test results comply with specifications. B = Test results do not comply with specifications. C = Test results comply with air-voids specifications. Elevation 97 97 98 95 95 98 99 Bruun Intertec c~n .dlt-~~_._ .. Henry 00 Associate-Senior Engineer Providing engineering and environmental solutions since 1957 BRAUN I NTE RTEC Braun Inter1ec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 Phone: 952.995.2000 Fox: 952.995.2020 Web: brounintertec.com Report of Field Compaction Tests Date: January 9,2006 Project: BL-04-05797B Report: 4 Client: Project Description: Tim Himmer Towne Lakes 6th Addition Rottlund Homes County 19 and West Laketowne Drive 3065 Centre Pointe Drive North Albertville, Minnesota Roseville, MN 55113 Inplace Specified Soil Optimum Max. Lab Inplace Dry Relative Minimum ID and Moisture* Dry Density* Moisture Density Compaction Compact. Test Date Type Classification (%) (pct) (%) (pct) (%) (%) Comments 22 10/12/05 N P-4: SP 14.6 111.6 5 107 96 98 B 22A 10/26/05 N P-4: SP 14.6 111.6 5 110 99 98 A 23 I I/8/08 N P-I: SP-SM 11.2 125.8 6 125 99 98 A 24 I I/8/08 N P-I: SP-SM 11.2 125.8 6 126 100 98 A 25 I I/8/08 N P-I: SP-SM 11.2 125.8 6 125 99 98 A 26 I I/9/05 N P-l: SP-SM 11.2 125.8 5 126 100 98 A 27 I I/9/05 N P-I: SP-SM 11.2 125.8 6 125 99 98 A Key: N = Nuclear, ASTM D 2922 SC = Sand Cone, ASTM D 1556 * = a.M. and M.L.D.D. rounded to nearestO.1 A = Test results comply with specifications. B = Test results do not comply with specifications. C = Test results comply with air-voids specifications. Test Test Location 22 Lot 6, Block I: 3'W of Pipe (Pre-install Service Backfill) 22A Retest of Test 22 23 Lot 2, Block IC: 3'E of Pipe (Pre-install Service Backfill) 24 Lot 3, Block IC: 3'E of Pipe (Pre-install Service Backfill) 25 Lot 41, Block IC: 3'W of Pipe (Pre-install Service Backfill) 26 Lot 38, Block IC: 3'E of Pipe (Pre-install Service Backfill) 27 Lot 37, Block I C: 3'E of Pipe (Pre-install Service Backfill) 98 98 94 96 98 96 96 Elevation Reference: Top of water main shut-off= 100 c: Mr. Jon Sutherland, City of Albertville Mr. John Becker, Westwood Professional Services Mr. Steve Hennen, Hennen Construction Bmun IntertecItinn ~~t enry V 00, PE Associate-Senior Engineer · Providing engineering and environmental solutions since 1957 BRAUN INTERTEC Braun Inter1ec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 Phone: 952.995.2000 Fox: 952.995.2020 Web: braunintertec.com Report of Field Compaction Tests Date: January 9, 2006 Project: BL-04-05797B Report: 5 Client: Tim Himmer Rottlund Homes 3065 Centre Pointe Drive North Roseville, MN 55113 Project Description: Towne Lakes 6th Addition County 19 and West Laketowne Drive Albertville, Minnesota I nplace Specified Soil Optimum Max. Lab Inplace Dry Relative Minimum ID and Moisture* Dry Density* Moisture Density Compaction Compact. Test Date Type Classification (%) (pct) (%) (pct) (%) (%) Comments 28 I I/9/05 N P-I: SP-SM 11.2 125.8 6 125 99 98 A 29 I I/9/05 N P-I: SP-SM 11.2 125.8 5 126 100 98 A 30 II 19/05 N P-I: SP-SM 11.2 125.8 6 125 99 98 A 31 I I/9/05 N P-I: SP-SM 11.2 125.8 6 125 99 98 A 32 IIII 0105 N P-I: SP-SM 11.2 125.8 5 125 99 98 A 33 II II 0105 N P-I: SP-SM 11.2 125.8 5 126 100 98 A 34 11/10/05 N P-I: SP-SM 11.2 125.8 5 125 99 98 A Key: N = Nuclear, ASTM D 2922 SC= Sand Cone, ASTM D 1556 * = a.M. and M.L.D.D. rounded to nearest 0.1 A = Test results comply with specifications. B = Test results do not comply with specifications. C = Test results comply with air-voids specifications. Test I Elevation I 97 97 95 98 96 94 95 Test Location 28 Lot 15, Block IC: 3'W of Pipe (Pre-install Service Backfill) 29 Lot 18, Block lC: 3'W of Pipe (Pre-install Service Backfill) 30 Lot 33, Block IC: 3'E of Pipe (Pre-install Service Backfill) 31 Lot 31, Block I C: 3'E of Pipe (Pre-install Service Backfill) 32 Lot 27, Block 1C: 3'E of Pipe (Pre-install Service Backfill) 33 Lot 23, Block IC: 3'S of Pipe (Pre-install Service Backfill) 34 Lot 22, Block 1C: 3'S of Pipe (Pre-install Service Backfill) Elevation Reference: Top of water main shut-off= 100 c: Mr. Jon Sutherland, City of Albertville Mr. John Becker, Westwood Professional Services Mr. Steve Hennen, Hennen Construction Bmun Intert~hon ~!o'E Associate-Senior Engineer Providing engineering and environmental solutions since 1957