Loading...
1997-05-13 Review Plat, Grading, Drainage, Utility r ." . . "'SeH 113S. FIFTH AVENUE, p.G. BOX 1717,SICLOUD. MN56302-1717 320252-4740 800572-0617 320251-8780FAX ARCHITECTURE ENGINEERING ENVIRONMENTAL TRANSPORTA T/ON TO: Garrison Hale City Administrator Albertville, MN FROM: Peter J. Carlson, P.E. City Engineer DATE: May 13,1997 RE: Preliminary Plat, Grading, Drainage, and Utility Plan Center Oaks SEHNo. A-ALBEV 9701.00 I have reviewed the above referenced drawings and have the following comments: PreliminarY Plat 1. There are a number of lots that do not meet the 100-foot width at the setback line required for the R-IA zoning. It is my understanding the proposed PUD zoning would be established with the construction of a golf course. Within the PUD, a minimum lot width should be established. As shown, there are a number of lot widths that are less than 90 feet, which is . the minimum required in the R-l zone. Please verify the minimum lot widths with the City Attorney and City Planner. Preliminary Grading and Drainage Plan 1. Identify the positive overflow elevations for the detention ponds and low rear yard areas in Blocks 2 and 6. Set walkout elevations a minimum of 2 feet above the positive overflow elevation. - 2. Drain tile lines will be required in all rear yard areas that do not back onto a detention pond or wetland. 3. Grade the rear lot area of Lots 22 - 26, Block 7 to drain to the proposed detention pond. SHORT ELLIOTT HENDRICKSON INC. ST. PAUL, MN MINNEAPOLIS, MN CHIPPEWA FALLS. WI MADISON. WI LAKE COUNTY, IN EQUAL OPPORTUNITY EMPLOYER . . Mr. Garrison Hale May 13, 1997 Page 2 4. House pads should be perpendicular to the street. It is my understanding that the "coving" concept being utilized with this development allows for variable setbacks. However, there are several building pads shown that are also skewed to the street. In my opinion, with the proposed narrow lots, this will have the look of trying to "shove in" one more lot along that particular street when there isn't room. 5. Submit drainage calculations used to size the detention ponds. for review. Because of downstream drainage issues with County Ditch 9, the allowable discharge from the ponds will be limited to half the predevelopment rates. 6. On Lot 6, Block 2, the pedestrian trail is shown 10 feet from the building pad. A wider corridor should be created for the trail. Preliminary Utility and Street Plan 1. The proposed street pavement section shall be according to the City Standard Detail and shall be revised accordingly. Wetland Mitigation Plan 1. Submit plan to the Wright Soil and Water Conservation District for review and approval. If you have any questions please call me. djg c: -----._---------:::~- ,/ Linda-Houghton, City Clerk Elizabeth Stockman, Northwest Associated Consultants, Inc. Mike Couri, City Attorney Meyer-Rohlin, Inc. (J:\ALBEV\CORR\MY-13A.97)